Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2022-06-07 Planning & Environment Meeting Agenda

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     7 JUNE 2022


          c.    Located outside of the proposed covenant area.
          d.    Have no fencing between lots.
          e.    A continuous alignment through the lots.
    40.   The Grantor is responsible for all maintenance and costs associated with the 20 metre
          wide easement.
    41.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard
          easement terms. Draft easement documentation must be submitted to Council for
          endorsement.
    Bushfire Management – Reconfiguration Requirements
    42.   All reconfiguration works must be carried out in accordance with the approved Bushfire
          Hazard Assessment and Management Plan.
          *(Refer Advisory Note)
    43.   Certification must be submitted to Council from a qualified person* which certifies that
          the development has been constructed in accordance with the bushfire management
          conditions of this Decision Notice.
          *(Refer Advisory Note)
    44.   The following clauses must be included in the contract of sale for all Lots which
          requires:
          a.    future dwellings to be constructed within the building envelopes shown on the
                Approved Plans AND in accordance with the approved Bushfire Hazard
                Assessment and Management Plan.
          b.    the trafficable fire break trail to be maintained, include unlocked 4m wide gates
                allowing access to Council and Fire Services and ensure compliance with the
                QLD SPP Bushfire 2019 firebreak trail specifications.
          c.    All future dwellings are to provide a dedicated 10,000 litre water supply for
                firefighting purposes .
    45.   A Landholder Bushfire Information Kit is to be provided to all new owners detailing the
          performance requirements of the trafficable firebreak fire trails
    Road & Park Names
    46.   The proposed names of roads must be lodged with the application for a Development
          Permit for Operational Works. Names are to be
          a.    Relevant to Australian, preferably local, history, flora, fauna, culture, landscape
                or physical characteristics.
          b.    If used, personal names should commemorate persons who have contributed
                significantly to the development of the region; demonstrated outstanding levels
                of civic service; or achieved role-model status in the wider community or donated
                property or funds for community benefit; and be recognised in memoriam.
          c.    Park names should be unique within the locality.
          d.    Approval will not be given to a name that may be construed as advertising, is
                more than one word, understanding that a geographic relationship such as
                Cooroy Mountain is permissible; is insensitive to diverse cultures and does not
                accord with community standards; and is not concise, easy to pronounce and
                spell and be without accent marks, apostrophes or hyphens.
          e.    Approval will not be given to a name that is the same or similar to the name of
                another road in the Shire, or of a road in close proximity in a neighbouring Shire.

                                                                                    Page 32 of 83
Log in to download the original file

2022-06-07 Planning & Environment Meeting Agenda(PDF, 8MB).pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.