PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 JUNE 2022
Names that are not easily pronounced, or may cause confusion to emergency
services are to be avoided.
f. All street signs on new roads (public and private) and parks shall be erected prior
to works being accepted on maintenance.
Boundary Encroachments
47. Certification must be submitted to Council from a Licensed Surveyor which certifies
that:
a. the setback/s to any new boundaries for any existing buildings remaining on the
site comply with the relevant provisions of the planning scheme and the Building
Act 1975, unless varied by this Decision Notice.
b. all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
easement.
c. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included
within an easement.
d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage
Act 2002 and associated codes and requirements.
e. all dams (including ponded water, dam walls and associated spillway structures)
are wholly located within the boundaries of a single lot.
f. all retaining walls and structures are fully contained within the lot they retain any
fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties.
External Works
48. The table drains in the verge areas in the frontage of the subject site to Glenridge Drive
must be reconstructed to be free draining. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. The frontage of proposed Lot 8 must be completed prior to the sealing of the
survey plan for Stage 1.
b. The remainder of the frontage, including the proposed intersection, must be
completed prior to the sealing of the survey plan for Stage 2. The intersection
must be constructed generally in accordance with drawing No. 21598-P002,
Revision D prepared by TOD engineers.
Condition 48 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
49. A new intersection must be constructed joining Glenridge Drive with the new road. The
works must be undertaken in accordance with an Operational Works approval and be
completed prior to the sealing of the survey plan for Stage 2. The intersection must be
constructed generally in accordance with drawing No. 21598-P002, Revision C
prepared by TOD engineers, the Engineering Report Document No. 21598_RP1,
Revision B prepared by TOD engineers dated 24 March 2022 and must include in
particular:
a. an intersection with vehicle priority maintained on Glenridge Drive
b. provision of sight distances adequate for the design speed of the road
c. truncation of the new property boundaries
Condition 49 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Page 33 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.