Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2022-06-07 Planning & Environment Meeting Agenda

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                          7 JUNE 2022


                                                                                                                       Attachment 1
Attachment 1 – Climate Change Grants

 Applicant                   Project Title    Total amount   Total Project   Recommended      Special Conditions/Comments
                                               requested         Cost           Funding
 Zero Emissions Noosa   Solar Dashboards             $4946     $4946                $0     This is an excellent idea for community
 Inc (ZEN Inc)                                                                             education. It will be picked up as part
                                                                                           of Councils solar capital works at the
                                                                                           Peregian Hub.
 Zero Emissions Noosa   Solar for Strata –        $10,000    $10,000           $10,000     This is a terrific opportunity to spread
 Inc (ZEN Inc)          Stage 2                                                            the learnings of Solar 4 Strata Stage 1
                                                                                           to a difficult sector
                                                                                           Special Conditions: S4S Stage 1 to
                                                                                           be completed and reported
 Noosa Environmental    Noosa Youth Climate        $7,250    $16,750            $7,250     This will build upon and grow the
 Education Hub          Summit                                                             successful Youth Climate Summit held
                                                                                           in 2021 and engage the youth sector in
                                                                                           climate change.
 Noosa Lions Football   29kW Solar System         $14,977    $29,955           $14,977     This is an excellent value for money
 Club                                                                                      project with significant emission
                                                                                           reduction potential.
                                                                                           Special Conditions:
                                                                                            a) The group is to engage a licensed
                                                                                               contractor to undertake a roof-sheet
                                                                                               assessment on the sections
                                                                                               proposed to be covered in solar
                                                                                               panels.
                                                                                            b) A plan showing the solar panel
                                                                                               design on the roof structure is to be
                                                                                               provided for assessment and
                                                                                               approval.
                                                                                            c) Where possible the panel can only
                                                                                               positioned flat on the existing roof
                                                                                               pitch without the need for framing to
                                                                                               increase pitch.
                                                                                            d) Where possible panels should be
                                                                                               arranged symmetrically between the

                                                                        Page 60 of 83
Log in to download the original file

2022-06-07 Planning & Environment Meeting Agenda(PDF, 8MB).pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.