PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 JUNE 2022
Applicant Project Title Total amount Total Project Recommended Special Conditions/Comments
requested Cost Funding
lines of the roof hips and valleys.
Connecting cables and the inverter
panel should be located to minimise
visual impact.
e) A 2-meter set back from the gutter
is required for future roof access –
this allows Council contractors post
installation to undertake roof works
without harness and allows safer
works space.
f) A prestart meeting is to be arrange
between the solar installer and
Council’s Building & Facilities
Officer.
g) All works are undertaken by a fully
licensed/accredited and insured
trades person.
h) The solar installer is to supply
copies of solar specification,
manuals or as constructed diagrams
to Council to record against the
asset ID.
i) The group will be responsible for
any associated works resulting from
the Solar Installation i.e., distribution
board upgrade.
j) The group will be responsible
for ongoing maintenance, repairs
and renewal of the solar system
Page 61 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.