MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                           Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                     State development assessment provisions
                                                Module 18 — State transport infrastructure protection


      Performance outcomes                             Acceptable outcomes                       Response                    Comment
                                        an existing lawful point of discharge to the state                   changes to the condition of an existing
                                        transport corridor.                                                  lawful point of discharge to a state
                                        AND                                                                  controlled transport corridor.

                                        AO2.4 For development on premises within 25                     NA   The proposed discharge point is not
                                        metres of a railway, approval from the relevant                      directed towards a railway.
                                        railway manager for the railway, as defined in the
                                        Transport Infrastructure Act 1994, schedule 6 has
                                        been gained to verify the lawful point of discharge
                                        for stormwater onto the railway.

Sediment and erosion management
PO3 Run-off from upstream
development is managed to ensure
                                        AO3.1 Development with a moderate to high risk of
                                        erosion incorporates erosion and sediment control
                                                                                                            The proposed development will
                                                                                                             incorporate erosion and sediment control
that sedimentation and erosion do       measures.                                                            measures as shown on the preliminary civil
not cause siltation of stormwater       Editor’s note: Where a development has a                             engineering design drawings.
infrastructure in the state transport   moderate to high risk of erosion as per section 13.5
corridor.                               of the Road drainage manual, Department of
                                        Transport and Main Roads, 2013, an erosion and
                                        sedimentation control plan should be provided to
                                        support either a stormwater management
                                        statement or stormwater management plan.
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.