MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Corner Myall Street & Ferrells Road Cooroy, QLD 4563
State development assessment provisions
Module 18 — State transport infrastructure protection
Performance outcomes Acceptable outcomes Response Comment
concentrated on the railway;
(3) the development does not impede any
drainage, stormwater or floodwater flows from
the railway
(4) stormwater or floodwater flows have been
designed to:
(a) maintain the structural integrity of the rail
transport infrastructure
(b) avoid scour or deposition
(5) additional railway formation drainage
necessitated by the development is located
within the premises where the development is
carried out
(6) retaining structures for excavations abutting
the railway corridor provide for drainage.
Lawful point of discharge
PO2 Stormwater run-off and AO2.1 Where stormwater run-off is discharged to a NA The proposed discharge point is not
drainage are directed to a lawful state transport corridor, the discharge is to a lawful directed towards a state controlled
point of discharge to avoid adverse point of discharge in accordance with section 1.4.3 transport corridor.
impacts on a future or existing state of the Road drainage manual, Department of
transport corridor. Transport and Main Roads, 2013 and section 3.02
of Queensland urban drainage manual, Department
of Natural Resources and Mines, 2013. AND
AO2.2 Development does not cause a net increase NA The proposed discharge point is not
in or concentration of stormwater or floodwater directed towards a state controlled
flows discharging onto the state transport corridor transport corridor.
during construction or thereafter. AND
AO2.3 Development does not create any additional NA The proposed discharge point does not
points of discharge or changes to the condition of create any additional points of discharge or
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.