MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                            Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                     State development assessment provisions
                                                Module 18 — State transport infrastructure protection


      Performance outcomes                             Acceptable outcomes                       Response                    Comment
                                            concentrated on the railway;
                                        (3) the development does not impede any
                                            drainage, stormwater or floodwater flows from
                                            the railway
                                        (4) stormwater or floodwater flows have been
                                            designed to:
                                            (a) maintain the structural integrity of the rail
                                                transport infrastructure
                                            (b) avoid scour or deposition
                                        (5) additional railway formation drainage
                                            necessitated by the development is located
                                            within the premises where the development is
                                            carried out
                                        (6) retaining structures for excavations abutting
                                            the railway corridor provide for drainage.
Lawful point of discharge
PO2 Stormwater run-off and              AO2.1 Where stormwater run-off is discharged to a               NA   The proposed discharge point is not
drainage are directed to a lawful       state transport corridor, the discharge is to a lawful               directed towards a state controlled
point of discharge to avoid adverse     point of discharge in accordance with section 1.4.3                  transport corridor.
impacts on a future or existing state   of the Road drainage manual, Department of
transport corridor.                     Transport and Main Roads, 2013 and section 3.02
                                        of Queensland urban drainage manual, Department
                                        of Natural Resources and Mines, 2013. AND
                                        AO2.2 Development does not cause a net increase                 NA   The proposed discharge point is not
                                        in or concentration of stormwater or floodwater                      directed towards a state controlled
                                        flows discharging onto the state transport corridor                  transport corridor.
                                        during construction or thereafter.      AND
                                        AO2.3 Development does not create any additional                NA   The proposed discharge point does not
                                        points of discharge or changes to the condition of                   create any additional points of discharge or
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗