Council archive · source document
Delegated Report - Code - Planning RAL25 0004 (As Published) · RAL25/0004
Performance outcome:
PO18 Development provides for AO18.1
The subject site is
parks, drainage reserves and open Active parkland or open space which
identified within the
space infrastructure that:- links to active parkland is provided in
Local Government
accordance with the Council’s
a) provides for a range of Infrastructure Plan
infrastructure network planning;
passive and active recreation (LGIP) as future land for
settings, offering a range of Community Facilities.
OR
informal and formal (Table SC3.2.3 identifies
experiences to the the future Trunk
AO18.2
community; Infrastructure as Cooray
Park contributions are paid in
b) accommodates adequate accordance Cemetery expansion).
with the applicable
facilities to meet the needs of infrastructure instrument. The application
the community and is proposes a 1,542m2 lot
designed to maximise use by AO18.3 to be dedicated as
the community it serves; Land intended for public open parkland (proposed Lot
c) provides opportunities for all space complements existing adjacent 101) and a footpath
age groups and levels of and surrounding open space areas and connection to the
mobility; physical linkages to these areas are existing pathway on the
provided. western side of Lake
d) is well distributed and Macdonald, connecting
contributes to the legibility and AO18.4 with Blue Wren parkland.
character of the specific town, Open space is provided adjacent to
village or locality; Lot 101 will be improved
waterways, with roads servicing the
with landscaping
e) creates attractive settings and linear parkland and lots located on the treatments to enhance
focal points for the opposite side of the road to the the visual amenity of the
community, designed as waterways. site.
attractive and enjoyable,
functional and safe places to AO18.5 While the site is
meet and recreate; A park has direct road frontages of a identified within the
minimum of 25% of the Local Government
f) benefits the amenity of total allotment boundary of the park to Infrastructure Plan
adjoining land uses; provide physical access and visibility. (LGIP) as future
g) facilitates the retention and community facilities for
protection of ecologically AO18.6 cemetery expansion, it is
important areas, wetlands, Public open space has good understood that Lot 100
waterways, drainage lines and connectivity for users via pedestrian has been excised for this
native habitat areas, their and cycle paths. purpose.
associated buffers, ecological The balance of the site
linkages and other natural and AO18.7 has been identified by
cultural features; Landscaping is designed to create Council to be utilised for
aesthetically pleasing open space
h) incorporates appropriate areas and to suit the type, setting and alternative community
measures for stormwater and purpose uses and infrastructure.
of the particular park. Lot 1 has been identified
flood management;
for future social housing
i) is cost effective to maintain; AO18.8 and future uses for Lots
and Active parkland in all areas other than 2 & 3 are yet to be
the Low impact industry zone
j) is dedicated as public land in and Medium impact industry zone will determined.
the early stages of the contain embellishment in accordance
subdivision. with the Local Government The park lot will not have
Infrastructure Plan in Part 4 such as: any embellishments as
the future use/s of
a) children’s play facilities catering adjoining Lots 2 & 3 has
for various ages including a soft not been determined.
fall surface where required and a Whilst the parkland may
not be improved with
Page 48 of 61
Document Set ID: 23690498
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning RAL25 0004 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.