Delegated Report - Code - Planning RAL25 0004 (As Published) · RAL25/0004

of 61

Text shows just the words. Original shows the document exactly as it was published.

                      Services
               19.    Underground reticulated electricity and telecommunication services must be provided to
                      each lot in accordance with an approval for Operational Works and the standards and
                      requirements of the relevant service provider.
               20.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               21.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               22.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               23.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               24.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Site Remediation
               25.    Prior to Plan Seal, the lots must be suitably remediated in accordance with the Detailed Site
                      Contamination Investigation prepared By Environmental Advisors dated 12/06/2024. The
                      remediation works must be supervised by a suitably qualified person and certified prior to
                      any future uses commencing upon any allotment subject to this application.
                      Earthworks and Retaining Walls
               26.    All earthworks and associated batters must be undertaken in accordance with an Operational
                      Works approval, and contained entirely within the subject site unless written permission from
                      the respective landowner(s) is provided to Council.
                      Damage to Services and Assets
               27.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                                   Date

                233467-C003            C      Development Layout Plan prepared by Covey            14 March 2024

                233467-C010            C      Roadworks & Drainage Plan prepared by Covey          14 March 2024

                233467-C241            C      Road 11 Detail Plan – Sheet 2 prepared by Covey      14 March 2024

                233467-C242            C      Road 1 Detail Plan – Sheet 3 prepared by Covey       14 March 2024

                                                                                                     Page 58 of 61

Document Set ID: 23690498
Version: 0, Version Date: 01/01/1900

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning RAL25 0004 (As Published).pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.