Original source · versioned page text
Civil Engineering Plans
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 10
C56014
8 10
7
|S|
|S|
|S| OP WORKS
36 10 8 |S|
109 10 |S|
S
|S|
|S|
C56014 |S|
|S|
S
|S| SEDIMENT FENCE
|S|
(INDICATIVE ONLY)
PROVIDE AND MAINTAIN
S
|S|
SEDIMENT FENCE TO
9
DOWNSTREAM BOUNDARIES
S S CONSTRUCTION ENTRY/EXIT
10
AS PER DETAIL ON DRG. C11 SHAKEDOWN AREA
PROVIDE RETURNS AT MAX.
S 20m INTERVALS
7
|S|
S
S
PROPOSED LOT 3 10
S
7
|S|
S 10
S
S
|S|
1 EXISTING BUILDING
S
RP94543 TO BE REMOVED S
|S|
S
8
0
S
10
11
S
|S|
S
E
8
E
S
10
S
|S|
E S
S
EXISTING BUILDING
E
S
PROPOSED LOT 2
|S|
KAURI S
E
S
PROPOSED LOT 1
E S
|S|
S
E
S
E
S
EXISTING
|S|
BUILDING
EXISTING DRIVEWAY S
(INDICATIVE ONLY)
E S
H
S
E
S
TREET
CE
109109
E
S
S
M
W
E
DA E
R
E 10/03/2022
EA ID: 2557785
E
PROVIDE AND MAINTAIN SEDIMENT AND EROSION CONTROL RPEQ: 26443
TEMPORARY CONSTRUCTION CONTRACTOR TO ALLOW FOR PROVISION OF ALL
E ENTRY/EXIST AS PER DETAIL REQUIRED SEDIMENT AND EROSION CONTROL
ON DRG. C11 DEVICES IN ACCORDANCE WITH THE 'BLUE BOOK' DO NOT SCALE, IF IN DOUBT ASK!
ST
AND RELEVANT NOOSA SHIRE COUNCIL POLICIES
E
34 AND GUIDELINES.
C56014
R EE
E
E
SEDIMENT RELEASE GUIDELINES SEDIMENT CONTROL
T E
UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDEEAMENDMENTS' ·AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR
NOTE:
1
Rev Date
02/03/22 ISSUE FOR OP WORKS
Description
JAC BRP
By Chk
ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
1. ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS 1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN SUCH AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT,
E IF · WITHIN 24 HOURS OF EXPECTED RAIN; AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND LOCATE ALL
DEEMED NECESSARY AND RELEVANT. · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SERVICES ON SITE AND WITHIN THE WORKS AREA FOOTPRINT. WHERE ANY
OTHERWISE NOTED IN THIS STANDARD, MUST NOT EXCEED THE ACCORDANCE WITH INTERNATIONAL EROSION CONTROL
DISCREPANCIES OCCUR BETWEEN THE INDICATED POSITIONS AND LEVELS
FOLLOWING LIMITS: ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT ON
E AND THE LOCATED SERVICES, RECOR IS TO BE NOTIFIED AS SOON AS
1.1. 50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM SPECIFICATIONS. 9. OVERALL SITE). POSSIBLE.
CONCENTRATION; 2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED 17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC
E
1.2. TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND; REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO AROUND THE WORK SITE WHERE POSSIBLE. MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING
1.3. pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE, INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE TABLE: [email protected]
AND TO THE EXTENT THAT, THE NATURAL RECEIVING WATERS THROUGHOUT CONSTRUCTION. INSTALLED AND BE OPERATIONAL BEFORE COMMENCING
UP-SLOPE EARTHWORKS. REPORTING 37 MARY ST NOOSAVILLE, QLD
LIE OUTSIDE THIS RANGE. 3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT
2. THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY ONLY CONTROL DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, 18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC 07 5211 1003
EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED AND SUPPORTED BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF EXPOSED SURFACES TO BE EITHER MULCHED, COVERED WITH MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR Client
THROUGH DOCUMENTATION THAT: MAINTENANCE OF WORKS. EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE APPROVAL BY THE SUPERINTENDENT. K. & J. HALSALL
2.1. FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR 4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS. Project Name
BEFORE THE TSS CONCENTRATION IS LIKELY TO BE REDUCED SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED AND MAINTENANCE SCHEDULE 6 CEDAR STREET
TO 50mg/L; EFFECTIVE PRIOR TO: SEDIMENT FENCE TIMEFRAME FOR COMPLETION COOROY
ESC MEASURES MAINTENANCE TRIGGER
2.2. RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED a. STRIPPING OF TOPSOIL AND GRASS. 10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATIONS OF MAINTENANCE
SOLIDS WILL RESULT IN A BETTER ENVIRONMENTAL OUTCOME b. BULK EARTHWORKS TO THE SITE. REFER DRG. C11. PROPOSED SUBDIVISION
WHEN SETTLED SEDIMENT EXCEEDS THE
BY PROVIDING STORAGE FOR THE CAPTURE AND TREATMENT c. SERVICES INSTALLATION. SEDIMENT BASISIN
VOLUME OF THE SEDIMENT STORAGE WITHIN 7 DAYS OF THE
Title
ZONE (SEE COUNCIL'S SEDIMENT BASIN INSPECTION
OF RUN-OFF FROM THE IMMINENT RAINFALL AND RUN-OFF. d. PAVEMENT CONSTRUCTION TEMPORARY CONSTRUCTION ENTRY/EXIT DESIGN GUIDELINES EROSION AND SEDIMENT
2.3. ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN 5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE 11. FOR TEMPORARY CONSTRUCTION ENTRY/EXIT STANDARD DETAIL
TO TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES; UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM THE THE CAPACITY OF ESC MEASURES FALLS CONTROL PLAN
AND SPECIFICATIONS REFER DRG. C11. OTHER ESC MEASURES
BELOW
BY THE END OF THE DAY
2.4. FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL
CONCENTRATION OF TSS IN THE CAPTURED WATER HAS APPLICATIONS. REVEGETATION
ALREADY SIGNIFICANTLY DECREASED. 6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN 12. FOR REVEGETATION STANDARD SPECIFICATION REFER TO
3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES SHALL BE READ IN CONJUNCTION WITH THE APPROVED DRAWINGS. INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA Project No. Discipline Status
FROM THE SITE, THE RELEASE LIMIT PRESCRIBED IN (1a) ABOVE MUST 7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE (IECA) BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION 20210226 CIVIL OP WORKS
NOT BE EXCEEDED UNLESS THE DEVELOPMENT IS IN FULL OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF THE GENERAL. Designed By Drawn By Scale
(at
COMPLIANCE WITH THIS STANDARD. SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE BRP JAC AS INDICATED A3)
MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. OPERATION AND MAINTENANCE Drawing No. Revision
8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO 13. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES
BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS TO BE C10 1
SHALL BE INSPECTED:
FULL SIZE ON ORIGINAL 0 10 20 30 40 50 60 70 80 90 100 mm
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 5 (of 6)
Section 2
OP WORKS
MAINTENANCE:
1. INSPECT SEDIMENT FENCE WEEKLY, AND AFTER SIGNIFICANT RAINFALL. UNDERTAKE
X)
G (MA
SPACIN NTOUR, NECESSARY REPAIRS IMMEDIATELY.
T 20m O
' P L A CED A ONG THE C SLOPE 2. REPAIR ANY TORN SECTIONS WITH A CONTINUOUS PIECE OF FABRIC FROM POST TO
RNS DA L O N
'RETU IS LOCATE DEPENDING POST.
CE 0m
IF FEN 5 TO 1 1.5 3. IF FENCE BEGINS TO SAG BETWEEN POSTS. INSTALL ADDITIONAL SUPPORT POST.
TH ERWISE m
(M
O IN 1
) 4. REMOVE ACCUMULATED SEDIMENT IF THE SEDIMENT DEPOSIT EXCEEDS A DEPTH OF 3
THE HEIGHT OF THE FENCE.
5. REPLACE THE FENCE FABRIC IF THE EXISTING FABRIC SERVICE LIFE IS GREATER THAN 6
G
ACKIN MONTHS.
IRE B X)
ITH W A
(M AX) W ISE 2m (M
3m RW
DI
RE
CT
OTHE NOTE:
IO
N
OF 1. SEDIMENT FENCES MUST INCORPORATE REGULAR 'RETURNS', GENERALLY AT A MAXIMUM
FLO
W 20m SPACING, BUT CAN BE LESS AS THE SLOPE ALONG THE FENCE INCREASES.
2. MINIMUM FOUR STAPLES OR TIE WIRES PER STAKE
3. REFER TO APPROVED PLANS FOR LOCATION AND EXTENT. IF THERE ARE ANY CONCERN
ALL SUPPORT POSTS PLACED WITH THE LOCATION OR EXTENT, CONTACT THE ENGINEERS RESPONSIBLE FOR THE
DOWN-SLOPE OF FABRIC WORKS.
4. UNLESS OTHERWISE NOTED ENSURE FENCE IS LOCATED:
FABRIC
BURIED SEDIMENT FENCE FABRIC, I) ENTIRELY WITHIN THE PROPERTY BOUNDARY.
200mm NOT FILTER CLOTH OR SHADE II) ALONG A LINE OF CONSTANT ELEVATION WHERE POSSIBLE
CLOTH III) 2 METRES FROM THE TOE OF A FILLING OPERATION OR BATTER SLOPES
5. ENSURE FENCE IS PLACED IN A MANNER THAT AVOIDS HIGH FLOW RATES ALONG THE
LENGTH OF THE FENCE AND UNDESIRABLE DISCHARGE OF WATER AROUND THE ENDS OF
THE FENCE.
6. REMOVE SEDIMENT FENCE ONLY ONCE AREAS UPSLOPE OF SEDIMENT FENCE ARE
SEDIMENT FENCE SUFFICIENTLY STABILISED TO PREVENT EROSION. REHABILITATE AND VEGETATE
DISTURBED GROUND AS NECESSARY TO PREVENT EROSION
SCALE 1:50 7. ACCUMULATED SEDIMENT IS TO BE REMOVED IN A SUITABLE MANNER THAT WILL NOT
CAUSE EROSION OR A POLLUTION HAZARD.
10/03/2022
EA ID: 2557785
INSTALLATION RPEQ: 26443
300mm
MIN
FLOW CONTROL BERM INCORPORATED INTO THE 1. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST
DO NOT SCALE, IF IN DOUBT ASK!
ROCK PAD IF THE THE PAD RECEIVES RUNNOFF RAIN, DAILY DURING EXTENDED PERIODS OF RAINFALL, AFTER
MINIM FROM THE BUILDING SITE (LOCATION MAY VARY). RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY
UM LE
NGTH
10M INTERVALS.
2. IF SAND, SOIL, SEDIMENT OR MUD IF TRACKED OR WASHED ONTO
MAKE THE ADJACENT SEALED ROADWAY, THEN IT MUST BE REMOVED
40 - 75mm CRUSHED ROCK FOR P FOOTPATH
)
UP-SLOPE RUNOFF DIRECTED
IN
EDEST S USING A SHOVEL AND THEN A STIFF BRISTLED BROOM, AND THEN BY
RIAN T AFE
(M
TO AN APPROPRIATE RAFFIC A VACUUM IF AVAILABLE.
0m
SEDIMENT TRAP. .
3. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY
2.
TH
BE WASHED CLEAN AFTER ALL REASONABLE EFFORTS HAVE BEEN
ID
TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.
Y
KERB
W
AR
4. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH
D
N
MATERIAL AND THE EFFECTIVENESS OF THE ROCK PAD IS REDUCED
U
BO
FOOTPATH TO A POINT WHERE SEDIMENT IS BEING TRACKED OFFSITE, A NEW 1 02/03/22 ISSUE FOR OP WORKS JAC BRP
TY
200mm
100mm LAYER OF ROCK MUST BE ADDED AND /OR THE ROCK PAD Rev Date Description By Chk
R
150 -
PE
MUST BE EXTENDED.
O
GEOTEXTILE FILTER ROADWAY
PR
5. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (E.G.
FABRIC (MANDATORY
FLOW CONTROL BERM) ARE MAINTAINED IN ACCORDANCE WITH
WHEN WORKING ON
THEIR DESIRED OPERATIONAL CONDITIONS,
CLAY SOILS).
6. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT
CREATE AN EROSION OR POLLUTION [email protected]
TEMPORARY CONSTRUCTION ENTRY/EXIT 37 MARY ST NOOSAVILLE, QLD
NOT TO SCALE
07 5211 1003
Client
K. & J. HALSALL
Project Name
6 CEDAR STREET
COOROY
PROPOSED SUBDIVISION
Title
EROSION AND SEDIMENT
CONTROL DETAILS
Project No. Discipline Status
20210226 CIVIL OP WORKS
Designed By Drawn By Scale
(at
BRP JAC AS INDICATED A3)
Drawing No. Revision
C11 1
FULL SIZE ON ORIGINAL 0 10 20 30 40 50 60 70 80 90 100 mm
Section 3
7
10
C56014
7 OP WORKS
8 10
36 10 8 LEGEND
109 10
S
C56014
S
TURF DRAIN
PROVIDE HOUSE CONNECTION
STUB FOR SEWER. UNITY WATER
S
CERTIFICATION AND APPROVALS SW STORMWATER PIPE
9
REQUIRED PRIOR TO WORKS
S S
10
COMMENCING.
W W POTABLE WATER
S
7
S
S
10 WATER METER
SURFACE FLOWS
S PROVIDE ROCK PAD ZONE 7
EXISTING BUILDING
S TO BE REMOVED
FOR SCOUR PROTECTION
10 ROCK PAD
S
S
1
E
E
E
E
E
E
S
E
EXISTING TREE
RP94543
E
S SW
E
W
SW
E
E
E
E
S PROVIDE Ø225 PIPED
E
E
E
STORMWATER CROSSING WITH
E
E
8
W
0
S
E
ENDWALLS BENEATH EASEMENT
10
E
E
11
E
E
PROVIDE CATCH DRAIN TOS EXISTING TREES TO BE
E
E
E
DOWNSTREAM BOUNDARY REMOVED S S EXISTING SEWER
W
E
E
S
E
OF ALLOTMENT AS PER
E
E
E E
E
DETAIL 8
10
E
E
S
W
E
E
E
E E
S
E
E
E
E
W
E
S
E
E E
E
E
E
S
E
E
EXISTING BUILDING
E
E
W
E
E
S
E
E
E
E
E
KAURI S
E
S
E
E
W
E
E
E
E
E
E
E
E
S
PROVIDE HOUSE CONNECTION STUB FOR
E
W
E
S
E
SEWER. UNITY WATER CERTIFICATION
E
E
E
AND APPROVALS REQUIRED PRIOR TO
E
E
S WORKS COMMENCING.
E
E
E
W
E
E
E
S
E
EXISTING
E
E
E
E
BUILDING PROVIDE CATCH DRAIN
DOWNSTREAM OF S
E
W
E
E
DRIVEWAY AS PER DETAIL
E
EXISTING DRIVEWAY
E
E S
E
H
E
(INDICATIVE ONLY)
E
E
E
W
S
E
E
E
E
E
E
S
E
TREET
E
E
CE
E
W
109109
E
E
E
E
E
Section 4
S
S
E
M
E
E
W
E
WW W
E
E
WW
DA
E
WW
E
WW
E
WW GRADE DRIVEWAY
E
WW
E
E
TOWARDS TURF DRAIN AT
E
WW 10/03/2022
E
WW
E
WW NOM. 1% MIN.
E
WW
E
R
WW
E
RESIDENTIAL
E
E WW EXISTING TREE TO BE
EA ID: 2557785
E
DRIVEWAY ACCESS. WW
E
E
RPEQ: 26443
REMOVED
E
REFER TO NSC STD
E
E
E
DWGS RS-049 & RS-050 E
E
E
DO NOT SCALE, IF IN DOUBT ASK!
E
PROVIDE MINIMUM 125mm
E
E
33
COMPACTED TYPE 2.1 GRAVEL
E
E
E
N
E
BASE WITH 2 COAT BITUMEN
E
1I
E
ST
SEAL IN ACCORDANCE WITH NSC
E
34
E
33
STD RS-056
E
E
E
N
E
1I
E
E PROVIDE SEPARATE WATER METER
E
C56014
RE
E
E
FOR EACH LOT. UNITY WATER
E
E
CERTIFICATIONS AND APPROVALS
E
E
E
E
REQUIRED PRIOR TO WORKS.
E
E
E
ET
E
E
E
E
E
E
LOW POINT FOR
E
E
E
STORMWATER RUN-OFF
E
1 02/03/22 ISSUE FOR OP WORKS JAC BRP
E
GRADE VERGE LOCALLY TO
E
E E
Rev Date Description By Chk
E
PROVIDE FLOW PATH
E
E
ROADWORKS AND DRAINAGE NOTES E
1. ALL ROADWORKS AND DRAINAGE (EXTERNAL TO SITE BOUNDARIES AND/OR COUNCIL OWNED 11. EXCEEDING 150 MM IN THICKNESS, AND COMPACTED TO A MINIMUM DENSITY OF 95% OF THE E
DRAINAGE PIPES INTERNAL TO THE SITE BOUNDARIES) CONSTRUCTION AND TESTING TO BE IN MAXIMUM DRY DENSITY AS DETERMINED IN ACCORDANCE WITH AUSTRALIAN STANDARD
ACCORDANCE WITH NOOSA SHIRE COUNCIL DEVELOPMENT GUIDELINES, DRAWINGS AND AS1289.6.2.
SPECIFICATIONS. 12. ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE REQUIREMENTS OF E [email protected]
2. ALL DRAINAGE CONSTRUCTION (PRIVATELY OWNED DRAINAGE LINES INTERNAL TO THE SITE AS3727.1:2016.
13. SAW CUT JOINTS MUST BE: 37 MARY ST NOOSAVILLE, QLD
BOUNDARIES) CONSTRUCTED AND TESTED TO BE IN ACCORDANCE WITH RELEVANT
AUSTRALIAN STANDARDS. 13.1. BETWEEN 41 AND 31 OF CONCRETE PAVEMENT DEPTHS. 07 5211 1003
3. ALL STORMWATER PIPES ARE TO BE MANUFACTURED TO RELEVANT AUSTRALIAN STANDARDS 13.2. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.
Client
INCLUDING BUT NOT LIMITED TO AS4058 AND AS1992. 13.3. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.
4. CONTRACTOR TO CONSIDER CONSTRUCTION LOADINGS TO ENSURE NO EXCESSIVE LOADS 14. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO CONSTRUCTION K. & J. HALSALL
ARE PLACED ON STORMWATER DRAINAGE OR STRUCTURES. COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN THE CONCRETE SLAB AND AVOID Project Name
MISMATCHED JOINTS.
5. CONTRACTOR TO CONFIRM LOCATION AND LEVEL OF EXISTING STORMWATER DRAINAGE 6 CEDAR STREET
WHERE CONNECTING ON TO EXISTING.
6. ALL STORMWATER GRATES/LIDS WITHIN TRAFFICABLE AREAS TO BE CLASS "D" IN COOROY
ACCORDANCE WITH AS3996. PROPOSED SUBDIVISION
7. ALL GRATES AND LIDS SHALL SIT FLAT WITH ITS SURROUND AND NOT BE LOOSE OR MOVE
UNDER WHEEL LOADS. Title
8. ALL STORMWATER STRUCTURES TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT
SPECIFICATION, AND LOCAL AUTHORITY GUIDELINES AND SPECIFICATIONS. WHERE
ROADS AND DRAINAGE LAYOUT DETAILS
STRUCTURES EXCEED MAXIMUM DEPTH AS IDENTIFIED WITHIN STANDARD DRAWINGS THE
CONTRACTOR WILL ENSURE AN ADEQUATE STRUCTURAL DESIGN IS UNDERTAKEN FOR THE
SUBJECT STRUCTURE TO BE CONSTRUCTED TO.
9. WHERE A STORMWATER DRAINAGE TRENCH HAS BEEN CONSTRUCTED LONGITUDINALLY IN
THE ROAD, THEN THE FINAL PAVEMENT SURFACE REPAIR WIDTH IS TO MATCH THE EXISTING
LANE WIDTH AND TERMINATE 50mm CLEAR OF THE ROAD CENTERLINE OR LANE LINE NOTE: Project No. Discipline Status
LINEMARKING TO ALLOW FOR THE BITUMEN EMULSION JOINT SEAL. REINSTATEMENT OF
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND LOCATE ALL 20210226 CIVIL OP WORKS
SURFACE ADJACENT TO THE KERB OR ROAD PAVEMENT EDGE TO EXTEND FULLY TO THE KERB
LINE OR EDGE OF PAVEMENT. SERVICES ON SITE AND WITHIN THE WORKS AREA FOOTPRINT. WHERE ANY Designed By Drawn By Scale
DISCREPANCIES OCCUR BETWEEN THE INDICATED POSITIONS AND LEVELS (at
10. ROADBASE MATERIAL SHOULD BE PLACED IN LAYERS AT LEAST 75 MM THICK BUT NOT. BRP JAC AS INDICATED A3)
AND THE LOCATED SERVICES, RECOR IS TO BE NOTIFIED AS SOON AS
POSSIBLE. Drawing Section 5
No. Revision
C20 1
FULL SIZE ON ORIGINAL 0 10 20 30 40 50 60 70 80 90 100 mm
The text continues on section 6.