Council archive · source document
REC14/0007 & OPW14/0253 Report
Land Surveying Dynamics June 2014
SPECIFIC OUTCOMES PROBABLE SOLUTIONS COMMENTS
provided and retained between and throughout key destinations Priority Infrastructure Plan in Part 15;
including— AND
a) an east-west link between the beach and the northern end of S16.2 Contributions toward pedestrian and bicycle
Lake Weyba via Burgess Creek; pathways are provided in accordance with the
b) a north-south link between the Noosa National Park to the Priority Infrastructure Plan in Part 15.
north of the locality and the former Shire boundary near
Peregian Beach; and
c) links within and around Sunrise and Sunshine Beach linking
business and community uses with residential development.
Beach access points No solution provided. Not Applicable.
O17 Access points to the sensitive foredune systems are No beach access points proposed.
defined and controlled by the establishment of key access nodes Existing access to The Esplanade to
which are designed and sited having regard to the potential be retained.
adverse impacts on—
a) visual amenity;
b) dune stability;
c) natural habitat; and
d) water quality;
AND
O18 Access to the foredune system and beachfront is via
formalised communal beach accesses, rather than individual
informal tracks.
Aircraft safety65 S19.1 Uses involving disposal of putrescible waste Not Applicable.
O19 Wildlife, including birds and bats, are not attracted into the are not located within 13km of the Sunshine Coast
operational airspace of the Sunshine Coast Airport in significant Airport; (See Map M7-1 below)
numbers; AND
S20.1 Uses involving aviation activities, including
AND parachuting and hot air ballooning, are not located
O20 Physical obstructions do not adversely affect the within 15km of the Sunshine Coast Airport; (See
operational airspace of the Sunshine Coast Airport; Map MA2 below)
AND
AND S21.1 None of the following is permitted within
O21 Emissions do not significantly affect air turbulence, visibility 15km of the Sunshine Coast Airport—smoke, ash,
or engine operation in the operational airspace of the Sunshine steam, dust or gaseous plumes exceeding 4.3m per
Coast Airport. second. (See Map 7-2
below).
Reconfiguring of a Lot – Three (3) into Four (4) Lots
8 Stevens Street, Sunshine Beach
RPD: Lots 675 and 697 on RP48111 and Lot 676 on SP125656 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.