Council archive · source document
REC14/0007 & OPW14/0253 Report
Land Surveying Dynamics June 2014
SPECIFIC OUTCOMES PROBABLE SOLUTIONS COMMENTS
which include—
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
e) views
O22 Native vegetation, including individual mature trees are S22.1 Buffers of existing native vegetation around Not Applicable.
retained, protected, maintained and supplemented, with site boundaries and environmentally sensitive areas
particular consideration given to— are retained and reinforced through additional
a) roadsides; planting;
b) the amenity of adjoining land uses; and AND
c) the protection of environmentally sensitive areas. S22.2 For reconfiguring in the Rural Zone and Rural
Settlement Zone—
a) a 10m landscaped buffer area is provided along
road frontages;
b) clearing and disturbance to vegetation is
minimised around road works, laying of services
and utilities and construction of property entrances;
c) revegetation of disturbed areas occurs after
completion of works; and
d) planting of clusters of trees along the road
reserves to form a tree canopy cover is provided
O23 Buildings and other structures do not have a significant S23.1 All lots include a building envelope that Complies.
adverse impact upon the visual amenity of surrounding areas. enables buildings and structures to be sited so they Buildings can be constructed on each of
do not— the proposed allotments with standard
a) protrude above ridgelines; or setbacks. Building heights will be
b) result in the unnecessary removal of vegetation restricted to 8m.
from the site.
Open space and environmental protection
O24 Public open space provides for a diverse range of passive S24.1 Active Parkland or open space linkage to Not Applicable.
and active quality recreational opportunities including sport to Active Parkland is provided in accordance with the
meet the outdoor recreational needs of the community. Priority Infrastructure Plan in Part 15;
OR
O25 Public open space is designed and located to— S24.2 Park contributions are paid in accordance
with the applicable infrastructure charging
a) be safe and easily accessible; instrument.
Reconfiguring of a Lot – Three (3) into Four (4) Lots
8 Stevens Street, Sunshine Beach
RPD: Lots 675 and 697 on RP48111 and Lot 676 on SP125656 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.