Skip to the record
Every meeting, every word.

Council archive · source document

REC14/0007 & OPW14/0253 Report

of 95

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Land Surveying Dynamics                                                          June 2014



                                                                         automatic or manual interchange device that
                                                                         allows alternate use of captured water or the
                                                                         reticulated water supply is installed to ensure
                                                                         that there is a continual supply of water for
                                                                         sanitary flushing and laundry use.




           O4 On-site detention does not adversely impact                S4.1 No solution provided                         Complies.
           on water requirements downstream of the site where the
           water is required to sustain the ecology and hydrology of
           downstream systems (environmental flows);

           AND

           O5 Within the Shire Business Centre site, as
           shown on Map SBC, on-site detention measures are              S5.1 No solution provided
           contained within the developed areas of the site, clear of
           drainage lines and Open Space Precincts.

           Run-off treatment                                             S6.1 & S7.1 Development complies with the         Complies.
           O6 Run-off that leaves the site is treated so as              water quality standards in Table 2 of the         Infiltration devices are proposed.
           not to adversely impact on the ecology and hydrology of       SEQ Regional Plan Implementation
           downstream environmental flows; AND                           Guideline No. 7 for Water Sensitive Urban
           O7 Within the Shire Business Centre site, as                  Design.
           shown on Map SBC—
           a) run-off treatment occurs within the site ; and
           b) drainage lines are only used for final polishing
                of run-off.


           Town water supply connections                                 S8.1 A suitable backflow prevention device        Complies.
           O8 Backflow devices or similar systems ensure                 is installed to protect the potable water         Noted for future dwelling construction.
           water reuse facilities have no impact on the quality of the   within the reticulated water supply in
           town mains water.                                             accordance with AS/NZS 3500:2003
                                                                         Plumbing and Drainage.




Reconfiguring of a Lot – Three (3) into Four (4) Lots
8 Stevens Street, Sunshine Beach
RPD: Lots 675 and 697 on RP48111 and Lot 676 on SP125656                                             64

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REC14_0007 & OPW14_0253 Report.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.