Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

REC14/0007 & OPW14/0253 Report

of 95

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Land Surveying Dynamics                                                           June 2014




                              SPECIFIC OUTCOMES                                     PROBABLE SOLUTIONS                                       COMMENTS
           Design and construction (water)
           O1 Water supply infrastructure—                                 S1.1 Water supply infrastructure is designed    Complies.
           a) meets the needs of the users;                                in accordance with PSP6 –Engineering            Each lot will be served by water services
           b) is designed to be compatible with existing infrastructure;   Design Standards — Water and Sewerage           connected to existing water reticulation main on
           and                                                             and As Constructed data submitted in            the verge in Stevens Street.
           c) is designed using materials that are suitable for the use,   accordance with PSP6 –Engineering Design
           durable, easy to maintain and cost effective, taking into       Standards — Water and Sewerage.
           account the whole of life cycle cost and Council’s
           maintenance inventory.

           O2 Water supply infrastructure is constructed—                  S2.1 Water supply infrastructure is             Not Applicable.
           a) in accordance with appropriate engineering standards;        constructed in accordance with PSP6 –           No further water supply infrastructure is proposed
           and                                                             Engineering Design Standards — Water and        to be constructed.
           b) to minimise adverse environmental impacts.                   Sewerage;
                                                                           AND
                                                                           S2.2 Erosion and sediment control measures
                                                                           are designed and implemented in
                                                                           accordance with the Institution of Engineers
                                                                           Australia (Queensland Division) Soil Erosion
                                                                           and Sediment Control - Guidelines for
                                                                           Queensland Construction Sites.
           O3 Water supply infrastructure is proven to be suitable for     No solution provided.                           Not Applicable.
           its use prior to Council accepting the dedicated asset.

           O4 Water supply infrastructure is provided with all             No solution provided.                           Not Applicable.
           supporting technical documentation.

           O5 Where buildings or other structures are in proximity to      S5.1 The footing of any building or structure   Not Applicable.
           State or Council’s water supply infrastructure, provision is    is located clear of the zone of influence but
           made to protect the infrastructure from physical damage         no closer than 1.5m (measured horizontally)
           and to allow ongoing maintenance by Council.                    from infrastructure including sewers, water
                                                                           mains and stormwater structures;
                                                                           AND
                                                                           S5.2 A registered easement in favour of
                                                                           Council is created over all underground
                                                                           infrastructure located in private property;



Reconfiguring of a Lot – Three (3) into Four (4) Lots
8 Stevens Street, Sunshine Beach
RPD: Lots 675 and 697 on RP48111 and Lot 676 on SP125656                                              66

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REC14_0007 & OPW14_0253 Report.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.