Land Surveying Dynamics                                                            June 2014



                                                                            AND
                                                                            S5.3 The width of the easement is the
                                                                            greater of 3m or the width of the zone of
                                                                            influence;
                                                                            AND
                                                                            S5.4 The easement is centred over the
                                                                            centreline of the infrastructure.
           O6 Alignment of water supply infrastructure allows for easy      S6.1 Infrastructure is designed and                Complies.
           access for the ongoing maintenance by Council.                   constructed on the preferred alignments in
                                                                            accordance with PSP6 Engineering Design
                                                                            Standards – Water and Sewerage.

           O7 Any alterations or repairs to infrastructure as a result of   S7.1 Any alterations or repair to infrastructure   Not Applicable.
           the development are made at no cost to Council.                  as a result of the development are completed
                                                                            at the developer’s expense.


                                                                      SEWERAGE RETICULATION
                              SPECIFIC OUTCOMES                                       PROBABLE SOLUTIONS                                          COMMENTS
           Design and construction (water)
           O8 Sewerage reticulation infrastructure—                         S8.1 Sewerage reticulation infrastructure is       Complies.
           a) meets the needs of the users;                                 designed in accordance with PSP6                   Existing sewer connections currently service Lots
           b) is designed to be compatible with existing infrastructure;    Engineering Design Standards – Water and           675 and 676. Lot 697 has an existing
           and                                                              Sewerage.                                          maintenance shaft. It is proposed to construct
           c) is designed using materials that are suitable of the use,                                                        sewer reticulation main from the existing sewer
           durable, easy to maintain and cost effective, taking into                                                           maintenance shaft to serve Lot 696. These will be
           account the whole of life cycle cost and Council’s                                                                  designed in accordance with the SEQ WS&S D&C
           maintenance inventory.                                                                                              Code.

           O9 Sewerage reticulation infrastructure is constructed—          S9.1 Sewerage reticulation infrastructure is       Complies.
           a) in accordance with appropriate engineering standards;         constructed in accordance with PSP6 –              Sewer reticulation structure will be designed in
           and                                                              Engineering Design Standards — Water and           accordance with the SEQ WS&S D&C Code.
           b) to minimise adverse environmental impacts                     Sewerage and As Constructed data
                                                                            submitted in accordance with PSP6 –
                                                                            Engineering Design Standards — Water and
                                                                            Sewerage;
                                                                            AND
                                                                            S9.2 Erosion and sediment control measures
                                                                            are designed and implemented in



Reconfiguring of a Lot – Three (3) into Four (4) Lots
8 Stevens Street, Sunshine Beach
RPD: Lots 675 and 697 on RP48111 and Lot 676 on SP125656                                                67

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REC14_0007 & OPW14_0253 Report.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.