Negotiated Decision Notice 131998 981211 5
v4, prepared by, North Coast Environmental
Services
- - Proposal for Permaculture, Syntropic & June 2022
Regenerative Agriculture food systems for CYC
Campsite prepared by PermEco Inc (Tome
Kendall & Zaia Kendall)
- - Traffic Engineering Assessment Report 22 March 2023
Prepared by BMC Traffic
C020 C Earthworks Plan 26 September
2024
Prepared by RECOR
C040 C Stormwater Layout Plan 26 September
2024
Prepared by RECOR
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
3. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction;
ii. maintenance of safe vehicle and pedestrian access for the areas affected by the
works during and after daily construction has ceased;
iii. proposed fencing to the site during the construction phase of the development;
iv. approval of the Traffic Management Control Plan by the Department of Transport
and Main Roads (DTMR) for any works on State controlled roads; and
v. provision for worker car parking.
b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures;
c. works programme identifying key components of the works and their respective
durations;
Page 15 of 20
Document Set ID: 23699332
Version: 3, Version Date: 22/04/2025