Negotiated Decision Notice 131998 981211 5
e. marked pedestrian routes between the proposed car parking area(s) and the clamping
site area; and
f. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
101. Directional signage must be provided to direct visitors and patrons to the car parking spaces
provided on site.
Service Vehicles
102. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works include in particular:
a. regular access for vehicles up to a 14.5m rigid vehicle.
Stormwater Drainage
103. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval, be generally in accordance with RECOR’s Stormwater Layout Plan (C040, Rev. C)
dated 26 September 2024 and must include in particular:
a. the disposal of stormwater without causing scour or damage to the subject site or any
adjoining properties; and
b. the extension of Council’s existing box culvert (600mm x 1200mm) to allow for the Kabi
Road upgrade. The extension must meet the requirements of QUDM and Condition 97.
Easements
104. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
105. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
106. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
107. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken in accordance with an Operational
Works approval, be generally in accordance with RECOR’s Earthworks Plan (C020, Rev. C)
dated 26 September 2024 and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
108. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
J001061 4 Bushfire Hazard Assessment & Management 06.09.2024
Plan v4, prepared by, North Coast
Environmental Services
J001061 1 Bushfire Hazard Assessment & Management 06.09.2024
Plan v4 - Appendix 2 Bushfire Evacuation Plan
Page 14 of 20
Document Set ID: 23699332
Version: 3, Version Date: 22/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original