1. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below. The plans must be amended to incorporate
the amendments listed within the table below and resubmitted to Council prior to the issue
of any Development Permit for Operational Works*.
Plan No. Rev. Plan/Document Name Date
103 - Floor Plan, prepared by Dream Modular 5/7/2023
Homes
104 - Elevations, prepared by Dream Modular 5/7/2023
Homes
105 - Elevations and Sections, prepared by 5/7/2023
Dream Modular Homes
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
102 A Site Plan, prepared by Dream Modular 5/7/2023
Homes
Amendments Amend the access driveway location in accordance with the
Engineering Plans prepared by Sunshine Coast Civil Engineering
*(Refer to Advisory Note)
Currency Period
2. This development approval lapses if the use has not happened by 4 December 2025, unless
an application to extend the currency period is approved by Council.
Nature and Extent of Use
3. This approval allows for the use of the building for the purpose of a Secondary Dwelling in
accordance with the administrative use definition of the Noosa Plan 2020.
4. The premises must not be used as Multiple Housing and/or Visitor Accommodation or any
other residential use as defined by The Noosa Plan, except a Dwelling.
Carparking
5. One (1) car park is to be provided for the secondary dwelling and made available prior to the
commencement of use.
Retention of Existing Trees and Vegetation
6. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling.
7. Any trees identified to be removed to facilitate the secondary dwelling must be replaced with
native species prior to the use commencing.
Effluent Disposal
8. The secondary dwelling must be provided with an on-site waste water treatment and effluent
disposal system having a capacity sufficient for the use.
Water supply
9. The development must be provided with a potable water supply, a minimum capacity of
45,000 litres of water.
Page 2 of 6
Document Set ID: 22713984
Version: 3, Version Date: 04/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (App D - Development Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.