App D - Development Approval
5. REFERENCE DOCUMENTS
Report No. Rev. Plan/Document Name Date
W7363 sl A - Slope Stability Geotechnical Report, prepared by 26 September
Sunrise Design Qld Pty Ltd 2023
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Resubmission of Amended Plans Required
2. The conditions of this Decision Notice require resubmission of a plan to Council with
amendments. Please address the amended plan to Council’s Development Assessment
Branch with the Reference No. DBW23/0078, separate to any Operational Works application.
To avoid delays and assessment issues with the Operational Works application, it is
recommended the plan be resubmitted prior to lodgement of any Operational Works
application. However, should the plan not be submitted, the applicant is advised that a
Preliminary Approval may be issued in lieu of a Development Permit.
Building and Construction Industry (Portable Long Service Leave) Levy
3. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Co-ordination of Operational Works Assessment
4. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Qualified Person
5. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD)
Page 4 of 6
Document Set ID: 22713984
Version: 3, Version Date: 04/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (App D - Development Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.