Appendix G - Stormwater Management Report
RPS Project Management c/- Lutheran Services Page 5 of 10
PF80 - Cooroy Care Farm
28 May 2018 Ref. No. 2017.0616
Table 2 Water Quality Pollutant Targets
Indicator Objective
Total Suspended Solids (TSS) 80% reduction in average annual load of pollutants leaving the
developed unmitigated scenario compared to the developed mitigated
scenario
Total Phosphorus (TP) 60% reduction in average annual load of pollutants leaving the
developed unmitigated scenario, compared to the developed mitigated
scenario
Total Nitrogen (TN) 45% reduction in average annual load of pollutants leaving the
developed unmitigated scenario, compared to the developed mitigated
scenario
Gross Pollutant 90% reduction in average annual load of pollutants leaving the
developed unmitigated scenario, compared to the developed mitigated
scenario
Based on the Deemed to Comply solutions in the State Planning Policy the total area designated for
vegetated stormwater treatment devices would be in the order of 1.5% of the 7.5ha development
(approx. 1,125sqm), although this figure is likely to be considerably reduced through the utilisation the
strategies listed above.
3.4 Stormwater Harvesting
Stormwater harvesting is anticipated to occur through the use of rainwater tanks and the existing dam.
Rainwater tanks will provide the majority of potable water requirements for the site and the existing dam
is expected to meet the non-potable water needs. The catchment to the existing dam is approximately
1.7ha. Refer to Appendix D for catchment details.
For further details refer to the engineering services report titled, “PF80- Cooroy Care Farm, Water
Supply & Wastewater Servicing dated 25th October 2017”.
3.5 Bruce Highway Hydraulic Analysis
The Bruce Highway Hydraulic Analysis Report (September 2010) prepared for Department of Transport
and Main Roads by GHD indicates that the Bruce Highway overtops in larger rainfall event with the
possibility to restrict access to the site in the Probable Maximum Precipitation Design Flood (PMPDF).
The key findings of the report relevant to our site are as follows:
• The Bruce Highway road shoulder (RL 117.5) will likely overtop to a depth of approximately
0.6m ( RL 118.07) in the Extreme Event (Probable Maximum Precipitation Design Flood
PMPDF)
• The properties above the highway (along Blueberry Drive) are likely flood affected at RL 113-
115. There is no mention of downstream properties being affected in the report.
• No overtopping of the highway is noted in storms up to the 100yr ARI storms (RL 112.13 max.
i.e. 5m freeboard below the road shoulder)
• There is access in a north direction along the Bruce Highway in all events.
A copy of the GHD Hydraulic Analysis can be provided on request.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.