Appendix G - Stormwater Management Report
RPS Project Management c/- Lutheran Services Page 8 of 10
PF80 - Cooroy Care Farm
28 May 2018 Ref. No. 2017.0616
4 CONCLUSIONS & RECOMMENDATIONS
▪ The development site is not affected by flooding from any source however there are several
existing overland flow paths which run through the site.
▪ The Bruce Highway Hydraulic Analysis prepared by GHD for DTMR indicates that the highway
has safe egress in all rainfall events up to the 1% AEP with overtopping only expected in the
PMPDF. In the event of this extremely rare flooding safe egress is available along the Bruce
Highway in a northerly direction.
▪ The Legal Point of Discharge for the Site is to the existing creek/gully at the rear of the site
▪ Stormwater quality management is proposed, given the site is above the 2500 m 2 threshold in
the State Planning Policy SPP Code: Water Quality.
▪ The development would need to implement a flow control / detention strategy to mitigate the
possible runoff increase generated by the works.
▪ A detailed Erosion and Sediment Control Plan would be required to be implemented for
construction.
▪ The vegetated and sloping nature of the site suggests the use of swales to maximize amenity
and environmental sustainability
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.