Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix G - Stormwater Management Report

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

RPS Project Management c/- Lutheran Services                                                    Page 9 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                               Ref. No. 2017.0616




5      FUTURE CONSIDERATIONS
Once the landscape and architectural plans are further resolved, the next steps to progress the
stormwater strategy are to consider the following items (addressed at a high level in this report) in more
detail:

       ▪ Determine preferred discharge points
       ▪ Assess catchments
       ▪ Assess areas for stormwater reuse/harvesting
       ▪ Calculate stormwater detention volume requirements
       ▪ Calculate stormwater treatment requirements
       ▪ Complete preliminary design of stormwater network
Log in to download the original file

Appendix G - Stormwater Management Report.pdf · 9.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.