Appendix G - Stormwater Management Report
RPS Project Management c/- Lutheran Services Page 9 of 10
PF80 - Cooroy Care Farm
28 May 2018 Ref. No. 2017.0616
5 FUTURE CONSIDERATIONS
Once the landscape and architectural plans are further resolved, the next steps to progress the
stormwater strategy are to consider the following items (addressed at a high level in this report) in more
detail:
▪ Determine preferred discharge points
▪ Assess catchments
▪ Assess areas for stormwater reuse/harvesting
▪ Calculate stormwater detention volume requirements
▪ Calculate stormwater treatment requirements
▪ Complete preliminary design of stormwater network