Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published] · 132008.1867

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                Officer:          Ron Read
                                                Direct Telephone: (07) 5449 5263
                                                Response Address: Locked Bag 72
                                                                  Sunshine Coast Mail Centre QLD 4560
                                                Email:            [email protected]
                                                Our Reference:    2009/768
                                                Your Reference:




14 September 2009

Knobel Consulting Pty Ltd
PO Box 3892
BURLEIGH HEADS QLD 4220




Dear Sir/Madam

                                        Decision Notice
                                    Integrated Planning Act 1997

I refer to your application and advise that on 14 September 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                    2009/768
    Street address:                    51 Elanda Street SUNSHINE BEACH
    Real property description:         LOT: 403 RP: 48112
    Planning Scheme:                   The Noosa Plan

2        DECISION DETAILS

The following type of approval has been issued:
        Preliminary Approval for Operational Works - Roadworks, Stormwater
3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Preliminary Approval is one year and lapses on 14 September 2010
unless an application to extend the currency period is approved by Council.

4        ASSESSMENT MANAGER CONDITIONS

1.       The applicant is required to lodge a further application for Operational Works in order to obtain
         a Development Permit. The Development Permit will be issued upon the payment of
         outstanding contributions and bonds as required by the conditions of Decision Notice for
         Material Change of Use – Multiple Housing Type 2 – Duplex (2008/1867) and will be subject to
         the conditions contain herein. It must also be noted that no works can commence prior to
         obtaining a Development Permit.


                                                                                           Page 1 of 8
Full text of the other 7 pages

Page 2

                                                                                       2009/768



2.    The development shall be carried out in accordance with the approved plans listed below or as
      modified herein.
3.    Landscaping Plans for the development shall be submitted as a separate Operational Works
      application. A Development Permit for Building Works shall not be granted until a
      Development Permit for Operational Works – Landscaping has been issued.
4.    Provide the “missing link” connection between the existing pathway adjacent to the
      development site and the proposed footpath in Elanda Street. The width of pathway to match
      the existing pathway width.
5.    Roof and surface runoff connection to Council’s drainage system shall be as shown on
      drawing No. K1595-SW001 -A.
6.    A Traffic Management Plan (TMP) for the development addressing all construction phases
      shall be prepared by suitably qualified persons and submitted to Council for approval prior to
      the pre start meeting. The TMP shall address, but not be limited to, all items listed below, and
      shall be flexible in that it addresses all stages of the development:-
      6.1.   A single nominated access location to and from the site.
      6.2.   The plan should detail the routing of trucks to and from the site.
      6.3.   Provision of onsite parking for personnel working on this development, as there is
             limited parking available in adjacent streets.
      6.4.   Provision of safe cycle and pedestrian movements in the vicinity of the development
             on Elanda Street and adjacent public pathway.
      6.5.   No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
             Further parked trucks must have engines turned off.
      6.6.   Provision of signage and traffic controllers in accordance with Manual of Uniform
             Traffic Control Devices and Transport Infrastructure (Roads) Act.
      6.7.   Provide an indication where the surplus spoil is to be transported to, and/or source of
             imported fill material.
7.    A footpath 1.5 metres wide shall be constructed across the full frontage of the development.
      The footpath shall have a slip resistant surface. The alignment shall be determined on site with
      Council’s Construction Technical Officer. The expansion joints in any footpath shall be
      “sawcut”, not trowel jointed.
8.    The total required pavement thickness shall be based on the Department of Main Road’s
      Pavement Design Manual using soaked CBR tests of the subgrade.
      The design pavement thickness, together with CBR test results shall be submitted to Council’s
      Chief Executive Officer (CEO) for approval prior to placement of pavement material.
9.    Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
      installed into the first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each
      rain event.
      These devices are to remain in place during the civil works and construction phases of the
      development.
      The location and type of device to be installed shall be established at the “pre start” meeting
      with Council’s Construction Technical Officer and shall be installed prior to the
      commencement of any works.
10.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of works.
                                                                                     Page 2 of 8

Page 3

                                                                                           2009/768



11.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
12.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
13.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
      inspections with Council’s Construction Technical Officer or nominated staff.
14.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
15.   Council standards shall apply to these works unless otherwise modified herein.
16.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall
      forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the
      Chief Executive Officer, Sunshine Coast Regional Council.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
      of the use.
      In the case of any emergency Council shall be entitled to rectify such damage at the cost of
      the Applicant, such cost being paid prior to the commencement of the use.
17.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
18.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by Council’s CEO.
19.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
20.   Safe pedestrian access on Elanda Street and adjacent public pathway in the vicinity of the
      development shall be maintained at all times. Should footpath / road closures be necessary to
      carry out construction works, Council’s Construction Technical Officer (ph 0410 512 505) must
      be notified prior to the proposed closure.
21.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing No<, it is the site's supervising engineer who is
      responsible for ensuring that the sediment and erosion control measures have been designed
      by an RPEQ or CPESC and constructed:
      i.    In accordance with "best practise" methods,

                                                                                        Page 3 of 8

Page 4

                                                                                        2009/768



      ii.    Revised by an RPEQ or CPESC to address the issues raised by changes in the
             projected construction schedule and methods,
      iii.   Revised to address predicted rainfall events, and
      iv.    Achieve the desired environmental outcomes.
      Council’s CEO may request further controls to be installed should approved measures be
      inefficient.
22.   Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
      of satisfactory “As Constructed” records shall be submitted to Council.
      As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
      level and type of all services and structures. This information shall be submitted to Council for
      checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
      are available at www.adac.com.au and Council’s “Planning Scheme Policy 5 – Engineering
      Design Standards – Roads, Drainage and Earthworks”.
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
23.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
      be imposed on construction works during the maintenance period, which is a minimum period
      of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
      Developer for the works.
24.   The works to become Council assets will not be accepted "On Maintenance" until the
      landscaping is completed.
25.   These works are also to be in compliance with the relevant conditions of Development Permit
      No. 2008/1867.
26.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply.

5     REFERRAL AGENCY CONDITIONS
Not Applicable.

6     APPROVED PLANS
The approved plans for this development approval are listed in the following table:

 Plan No.          Rev.     Plan Name                                                   Date

 K1595- R001         B      Roadworks Plan by Knobel Consulting                         2 June 2009
 K1595-R002          B      Notes and Sewer Detail by Knobel Consulting                 2 June 2009
 K1595-SE001         A      Erosion & Sediment Control Plan by Knobel Consulting        2 June 2009
 K1595-SW001         A      Stormwater Drainage Plan by Knobel Consulting               2 June 2009

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:

                                                                                      Page 4 of 8

Page 5

                                                                                          2009/768



1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a “Request to change an existing approval” (Form 2Development
      Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
      indicating the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
Not Applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not Applicable.

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Operational Works                             Access, frontage works, stormwater disposal,
                                               sediment & erosion controls, excavation of site

11    SELF ASSESSABLE CODES

Not Applicable.
12    SUBMISSIONS

Not Applicable.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.

14    RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).




                                                                                        Page 5 of 8

Page 6

                                                                                     2009/768



15    OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully




Ron Read
SENIOR ENGINEERING OFFICER
OPERATIONAL WORKS ASSESSMENT BRANCH




                                                                                   Page 6 of 8

Page 7

                                                                                                       2009/768



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a             application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
a.                                                             (a) a notice giving a decision on a request to change
                                                                   or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                     Page 7 of 8

Page 8

                                                                                                    2009/768

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
     change or cancel a condition of a development                relevant period;
     approval.                                              (e) a deemed refusal.
    (2) The appeal must be started within 20 business           (2) An appeal under subsection (1)(a) to (d) must
days after the day the notice of the decision is given to   be started within 20 business days (the “applicant’s
the person.                                                 appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be started       matter should have been made.
at any time after the last day the decision on the          The Registrar for the Building and Development
matter should have been made.                               Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
     application;
(b) a matter stated in a development approval,
     including any condition applying to the
     development, and the identification of a code
     under section 3.1.6;3
(c) the decision to give a preliminary approval when a
     development permit was applied for;

a.
2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                                 Page 8 of 8

Used in these records

About this file

File size
60 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published].pdf · 60 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.