Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published] · 132008.1867
2009/768
2. The development shall be carried out in accordance with the approved plans listed below or as
modified herein.
3. Landscaping Plans for the development shall be submitted as a separate Operational Works
application. A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works – Landscaping has been issued.
4. Provide the “missing link” connection between the existing pathway adjacent to the
development site and the proposed footpath in Elanda Street. The width of pathway to match
the existing pathway width.
5. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing No. K1595-SW001 -A.
6. A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below, and
shall be flexible in that it addresses all stages of the development:-
6.1. A single nominated access location to and from the site.
6.2. The plan should detail the routing of trucks to and from the site.
6.3. Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
6.4. Provision of safe cycle and pedestrian movements in the vicinity of the development
on Elanda Street and adjacent public pathway.
6.5. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
6.6. Provision of signage and traffic controllers in accordance with Manual of Uniform
Traffic Control Devices and Transport Infrastructure (Roads) Act.
6.7. Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
7. A footpath 1.5 metres wide shall be constructed across the full frontage of the development.
The footpath shall have a slip resistant surface. The alignment shall be determined on site with
Council’s Construction Technical Officer. The expansion joints in any footpath shall be
“sawcut”, not trowel jointed.
8. The total required pavement thickness shall be based on the Department of Main Road’s
Pavement Design Manual using soaked CBR tests of the subgrade.
The design pavement thickness, together with CBR test results shall be submitted to Council’s
Chief Executive Officer (CEO) for approval prior to placement of pavement material.
9. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
10. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published]Related documentApplication case desk ↗
Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.