                                              Officer:          Ronald Read
                                              Direct Telephone: (07) 5449 5263
                                              Response Address: PO Box 141, Tewantin QLD 4565
                                              Email:            [email protected]
                                              Our Reference:    2008/1056
                                              Your Reference:   2384-01
14 August 2008

Cardno (Qld) Pty Ltd
PO Box 388
TOOWONG QLD 4066




Dear Sir/Madam,

                                      Decision Notice
                                   Integrated Planning Act 1997

I refer to your application and advise that on 13 August 2008 Council decided to approve the
application, subject to conditions.
Details of the decision are as follows:

1     APPLICATION DETAILS

 Application No:                     2008/1056
 Street address:                     71 Pacific Avenue Sunshine Beach
 Real property description:          Lot 31 RP 149005
 Planning Scheme:                    The Noosa Plan
2     DECISION DETAILS

The following type of approval has been issued:
    Development Permit for Operational Works - Operational Works - Roadworks, Stormwater &
      Earthworks

3     RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4     ASSESSMENT MANAGER CONDITIONS

1.    The development shall be carried out in accordance with the approved plans listed below or as
      modified herein.
2.    A Traffic Management Plan for the development addressing all construction phases shall be
      prepared by suitably qualified persons and submitted to Council for approval prior to the pre
      start meeting. The Plan shall address, but not be limited to, all items listed below and the Plan
      shall be flexible that it addresses all stages of the development:
      2.1    A single nominated access location to from the site.
      2.2    The Plan should detail the routing of trucks to and from the site.

                                                                                        Page 1 of 8
Full text of the other 7 pages

Page 2

                                                                                       2008/1056



      2.3   Provision of onsite parking for personnel working on this development, as there is
            limited parking available in adjacent streets.
      2.4   Provision of safe cycle and pedestrian movements around the development on Pacific
            Avenue and David Low Way.
      2.5   No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
            Further, parked trucks must have engines turned off.
      2.6   Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
            Control Devices and the Transport Infrastructure (Roads) Act.
      2.7   Provide an indication where any surplus spoil is to be transported to, and/or source of
            imported fill material.
3.    A 2.0 metre wide concrete footpath shall be constructed across the frontage of the
      development as shown on the approved drawings. The alignment shall be determined on site
      with Council’s Construction Technical Officer. The footpath shall have a slip resistant surface
      and expansion joints shall be “saw cut”, not trowel jointed.
4.    The total required pavement thickness shall be based on the Department of Main Roads’
      Pavement Design Manual using soaked CBR tests of the subgrade.
      The design pavement thickness, together with CBR test results shall be submitted to Council’s
      Manager, Land Development for approval prior to placement of pavement material.
5.    In all cases of pavement widening, the existing pavement is to be saw-cut back 300mm (min)
      to provide a clean face for the new pavement.
6.    The finished level of all mulch in garden beds is to be a minimum of 50mm below the level of
      the adjacent surface. All landscaping is to be constructed in accordance with Council’s
      Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
7.    Suitable root barriers shall be installed where proposed trees are adjacent to paths, pavement,
      etc; in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
      Guidelines.
8.    Council’s Construction Technical Officer (phone 0410 512 505) shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of works.
9.    The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
10.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
11.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).        The consulting engineers are responsible for arranging all
      inspections with Council’s Construction Technical Officer or nominated staff. Council’s
      Construction Technical Officer shall provide an inspection form for signing off by the Engineer
      at appropriate stages of construction, during on-site meetings. Construction Technical Officer
      will also sign the form at each stage when requested conditions have been satisfied. The
      works will be accepted “On Maintenance” after this form, signed by the inspector for each
      stage is complete, together with a letter from the Engineer requesting that the works go “On
      Maintenance”.
12.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
13.   Council standards shall apply to these works unless otherwise modified herein.

                                                                                    Page 2 of 8

Page 3

                                                                                      2008/1056



14.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager Land Development.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
      of the use.
      In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
      the Applicant, such cost being paid prior to the commencement of the use.
15.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
16.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Manager, Land Development, or his
      nominee.
17.   All signage, including that for safety during construction, shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
18.   Safe pedestrian access on Pacific Avenue and David Low Way shall be maintained at all
      times. If footpath / road closures are necessary to carry out construction works, Council’s
      Construction Technical Officer (phone 0410 512 505) must be notified prior to the proposed
      closure.
19.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “ fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on Cardno’s drawing 2384-01-008, Council’s Manager, Land
      Development, may request further controls to be installed should approved measures be
      inefficient.
20.   The owner of the subject property shall inspect the gross pollutant traps on a weekly basis,
      after each storm event and in accordance with the manufacturer’s specifications. The owner
      shall also enter into an ongoing maintenance contract with a Registered Contractor to clean
      and maintain the gross pollutant traps on a regular three monthly cycle and on an “On Call”
      basis in the case of an emergency.
21.   Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
      of satisfactory “As Constructed” records shall be submitted to Council.
      As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
      level and type of all services and structures. All of which shall be submitted to Council for
      checking and for Council’s records.




                                                                                     Page 3 of 8

Page 4

                                                                                        2008/1056



       The data must fully detail levels for all engineering works including but not limited to drainage
       structures, finished ground levels and pavement surface levels. The data shall be submitted in
       the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
       are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
       Engineering Design Standards – Roads, Drainage and Earthworks”. Approval of works shall
       not be granted until all As Constructed information has been supplied and accepted by
       Council.
22.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
       be imposed on construction works during the maintenance period, which is a minimum period
       of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
       Developer for the works.
23.    The works to become Council assets will not be accepted "On Maintenance" until the
       landscaping is completed.
24.    These works are also to be in compliance with the relevant conditions of Development Permit
       No. 06/1180 and Annexure A of Planning & Environment Appeal 1636/2007.
25.    Notwithstanding that Council has checked the plans with due care, where it is found during
       construction that variations from Council's standards exist, then Council standards shall apply.

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status      Referral Agency      Referral Address

 NIL

A copy of any referral agency conditions is attached.

6      APPROVED PLANS
The approved plans for this development approval are listed in the following table:
 Plan No.                  Rev.     Plan Name                                  Date

 2384-01-001                        Locality Plan                              19/05/2008

 2384-01-002                        Survey & Services Plan                     19/05/2008

 2384-01-003               A        Site Layout Plan                           14/07/2008

 2384-01-004               A        Kerb Long Section - Northern kerb          15/07/2008

 2384-01-005               A        Kerb Long Section - Southern kerb          15/07/2008

 2384-01-006                        Carpark Layout Plan & Details              19/05/2008

 2384-01-007               A        Stormwater Drainage Plan                   28/07/2008

 2384-01-008                        Erosion & Sediment Control Plan            19/05/2008

 2384-01-009               A        Signage & Line Marking Plan                15/07/2008

 2384-01-SK2                        Safe Intersection Sight Distance Plan      14/07/2008


                                                                                       Page 4 of 8

Page 5

                                                                                          2008/1056



7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Should any changes or modifications to the approved plans be required as a result of construction
constraints, a “Request to change an existing approval” (Form 2 Development Application) under the
Integrated Planning Act 1997 must be made. Amended plans clearly indicating the changes must be
lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

The following property notes will be placed against the subject property in Council’s property record
system:
Not Applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
A preliminary approval under section 3.1.6 of Integrated Planning Act 1997 has been granted and as
such the level of assessment and applicable codes for any development approval resulting from this
approval are identified in the conditions.

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required            Subject of the required Development Permit
 Not Applicable.

11    SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not Applicable.

12    SUBMISSIONS
Not Applicable.




                                                                                         Page 5 of 8

Page 6

                                                                                     2008/1056




13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.

14    RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15    OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully




Ron Read
SENIOR TECHNICAL ASSESSMENT OFFICER




                                                                                    Page 6 of 8

Page 7

                                                                                              2008/1056




                                                 Appeal Rights
                                                INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                               (5) If an application is processed under section
The following is an extract from the Integrated            6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                  application are available only for the aspects of the
Division 8 - Appeals to court relating to                  development that would have required public
development applications                                   notification under the repealed Act.
Appeals by applicants
                                                               (6) If an application involves assessment
4.1.27.(1) An applicant for a development                  against a concurrence agency code, appeal rights
application may appeal to the court against any of         for submitters for the application are not available
the following-                                             against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a              concurrence agency’s response for the code.
    development application;                               Appeals by advice agency submitters
(b) a matter stated in a development approval,             4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                of its jurisdiction, appeal to the court about the
    development, and the identification of a code          giving of a development approval for a
                         1
    under section 3.1.6;                                   development application if-
(c) the decision to give a preliminary approval            (a) the development application involves impact
    when a development permit was applied for;                 assessment; and
(d) the length of a currency period;                       (b) the advice agency told the applicant and the
(e) a deemed refusal.                                          assessment manager to treat its response to
    (2) An appeal under subsection (1)(a) to (d)               the application as a submission for an appeal.
must be started within 20 business days (the                   (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the             business days after the day the decision notice or
decision notice or negotiated decision notice is           negotiated decision notice is given to the advice
given to the applicant.                                    agency as a submitter.
    (3) An appeal under subsection (1)(e) may be           Appeals for matters arising after approval given
started at any time after the last day a decision on       (co-respondents)
the matter should have been made.                          4.1.30.(1) For a development approval given for a
Appeals by submitters                                      development application, a person to whom any of
4.1.28.(1) A submitter for a development                   the following notices have been given may appeal
application may appeal to the court about-                 to the court against the decision in the notice-
(a) the giving of a development approval, including        (a) a notice giving a decision on a request for
    any conditions (or lack of conditions) or other            extension of the currency period for an
    provisions of the approval; or                             approval;
(b) the length of a currency period for the approval.      (b) a notice giving a decision on a request to make
                                                               a minor change to an approval.
    (2) The appeal must be started within 20
business days (the “submitters appeal period”)                 (2) The appeal must be started within 20
after the day the decision notice or negotiated                    business days after the day the notice of the
decision notice is given to the submitter.                         decision is given to the person.
    (3) If a person withdraws a submission before              (3) Subsection (1)(a) does not apply if the
the application is decided, the person may not                     approval resulted from a development
appeal the decision.                                               application (superseded planning scheme)
                                                                   that was assessed as if it were an
    (4) If an application involves both impact                     application under a superseded planning
assessment and code assessment, appeal rights                      scheme.
for submitters are available only for the part of the
application involving impact assessment.                       (4) Also, a person who has made a request
                                                                   mentioned in subsection (1) may appeal to
                                                                   the court against a deemed refusal of the
                                                                   request.

1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                             Page 7 of 8

Page 8

                                                                                             2008/1056

     (5) An appeal under subsection (4) may be          For Building Works Only
         started at any time after the last day the     Rights of appeal conferred by Section 4.2.9 of the
         decision on the matter should have been        Integrated Planning Act 1997 as follows:
         made.
                                                        Division 3 – Appeals to tribunals relating to
                                                        development applications
Division 9 - Appeals to court about other
matters                                                 Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
                                                        4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following        may appeal to the Building and Development
notices have been given may appeal to the court         Tribunal against any of the following-
against the decision in the notice-
                                                        (a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to              development application;
    change or cancel a condition of a development
    approval.                                           (b) a matter stated in a development approval,
                                    2                       including any condition applying to the
(b) a notice under section 6.1.44 giving a decision         development, and the identification of a code
    to change or cancel a condition of a                    under section 3.1.6;
                                                                                  3
    development approval.
                                                        (c) the decision to give a preliminary approval when a
    (2) The appeal must be started within 20                  development permit was applied for;
        business days after the day the notice of the
                                                        (d) the length of a period mentioned in section 3.5.21
        decision is given to the person.
                                                              currency period;
    (3) Also, a person who has made a request
                                                        (e) a deemed refusal.
        mentioned in subsection (1)(a) may appeal
        to the court against a deemed refusal of the       (2) An appeal under subsection (1)(a) to (d) must
        request.                                        be started within 20 business days (the “applicant’s
                                                        appeal period”) after the day the decision notice or
    (4) An appeal under subsection (3) may be           negotiated decision notice is given to the applicant.
        started at any time after the last day the
                                                            (3) An appeal under subsection (1)(e) may be
        decision on the matter should have been         started at any time after the last day a decision on the
        made.                                           matter should have been made.
Appeals against decisions to change approval            The Registrar for the Building and Development
conditions under the repealed Act                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a         http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
    (2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.


2
     Section 6.1.44 (Conditions may be changed or
                                                        3
    cancelled by assessment manager or concurrence           Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                        local planning instrument)
                                                                                            Page 8 of 8

Used in these records

About this file

File size
60 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00001056.001 [As Published].pdf · 60 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.