Decision Notice - 010.2008.00001056.001 [As Published] · 142008.1056
2008/1056
2.3 Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
2.4 Provision of safe cycle and pedestrian movements around the development on Pacific
Avenue and David Low Way.
2.5 No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further, parked trucks must have engines turned off.
2.6 Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
Control Devices and the Transport Infrastructure (Roads) Act.
2.7 Provide an indication where any surplus spoil is to be transported to, and/or source of
imported fill material.
3. A 2.0 metre wide concrete footpath shall be constructed across the frontage of the
development as shown on the approved drawings. The alignment shall be determined on site
with Council’s Construction Technical Officer. The footpath shall have a slip resistant surface
and expansion joints shall be “saw cut”, not trowel jointed.
4. The total required pavement thickness shall be based on the Department of Main Roads’
Pavement Design Manual using soaked CBR tests of the subgrade.
The design pavement thickness, together with CBR test results shall be submitted to Council’s
Manager, Land Development for approval prior to placement of pavement material.
5. In all cases of pavement widening, the existing pavement is to be saw-cut back 300mm (min)
to provide a clean face for the new pavement.
6. The finished level of all mulch in garden beds is to be a minimum of 50mm below the level of
the adjacent surface. All landscaping is to be constructed in accordance with Council’s
Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
7. Suitable root barriers shall be installed where proposed trees are adjacent to paths, pavement,
etc; in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
8. Council’s Construction Technical Officer (phone 0410 512 505) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
9. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
10. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
11. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The consulting engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff. Council’s
Construction Technical Officer shall provide an inspection form for signing off by the Engineer
at appropriate stages of construction, during on-site meetings. Construction Technical Officer
will also sign the form at each stage when requested conditions have been satisfied. The
works will be accepted “On Maintenance” after this form, signed by the inspector for each
stage is complete, together with a letter from the Engineer requesting that the works go “On
Maintenance”.
12. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
13. Council standards shall apply to these works unless otherwise modified herein.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00001056.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.