Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published) · OPW21/0199.02
Bonds
60. A site control and/or compliance bond of $50,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
61. The return of bonds must:
a. Meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. Be calculated using a schedule of works and relevant bond equation
c. Have approval of the bond calculations and amount from Council prior to lodgement
d. Be lodged with Council and accompanied by the Bond Administration Fee/s.
e. Be requested for release by writing to Council, when relevant approval requirements
have been met.
DURING CONSTRUCTION
Engineering
62. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
63. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. The relevant conditions of the higher order Material Change of Use approval viz.
MCU21/0117.02 to which this approval relates;
c. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines;
d. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site..
Roadworks (External Roadworks & Road Widening Works)
64. All pavement widening or construction of new pavement must join neatly to the existing
pavement so that there are no irregularities in line or level resulting at or adjacent to the join
for the length of the construction. Where necessary the existing pavement must be brought
to a satisfactory standard to allow for the above.
65. All street surfacing must consist of a minimum depth of 30mm of an approved hot mixed
asphaltic concrete.
66. The installation and/or modification of any traffic signs, street signs, line marking and Raised
Reflective Pavement Markings (RRPMs) must be in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD).
67. The developer must notify Council’s Traffic Engineer for any works involving the removal or
modification of existing council traffic signs and/or parking bays prior to such works
commencing.
Page 12 of 31
Document Set ID: 24681870
Version: 7, Version Date: 17/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 924 KB (small file)
- File type
No other editions are linked here.