               94.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               95.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term. For the
                      purpose of this condition, an effectively stabilised surface is defined as one that does not, or
                      is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
                      lead to sedimentation, or lead to water contamination.
                      Damage to Services and Assets
               96.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      Where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Landscaping
               97.    The development site must be landscaped. The works must be undertaken in accordance
                      Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a.      A dense 2m minimum landscaped setback to the full length of the site’s frontage to
                              Pearl Street (excluding access, fence and bin enclosure).
                      b.      A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
                              Street.
                      c.      A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
                              infrastructure) except along the proposed driveway which adjoins Lot 1 RP153798
                              where a 0.5m wide landscape setback must be provided.
                      d.      The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
                      e.      All landscape works must be established and maintained in accordance with the
                              approved design for the life of the development, and in a manner that ensures healthy,
                              sustained and vigorous plant growth. All plant material must be allowed to grow to full
                              form and be refurbished when its life expectancy is reached.
               98.    Deleted
               99.    The finished level of all mulch in garden beds and landscaped medians is to be a minimum
                      of 50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in
                      accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
               100. Suitable root barriers must be installed where proposed trees are adjacent to paths,
                    pavement etc in accordance with Council’s Planning Scheme Policy PSP2 Landscaping.




                                                                                                        Page 16 of 31
Document Set ID: 24681870
Version: 7, Version Date: 17/04/2026

Used in these records

About this file

File size
924 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published).pdf · 924 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.