Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published) · OPW21/0199.02
27. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
28. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed water tight. This work is deemed as
notifiable Work and must be carried out by a suitably licenced plumber who must submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
LANDSCAPING
29. The development site must be landscaped. The works must be undertaken in accordance
with the Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
Landscaping Plans and in particular:
a. A dense 2m minimum landscaped setback to the full length of the site’s frontage to
Pearl Street (excluding access, fence and bin enclosure).
b. A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
Street.
c. A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
infrastructure) except along the proposed driveway which adjoins Lot 1 RP153798
where a 0.5m wide landscape setback must be provided.
d. The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
e. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
ENGINEERING
External Works
30. Pearl Street must be upgraded for the length of its frontage to the subject site. The works
must include in particular:
a. Construction of kerb and channelling and underground stormwater drainage to the
development side only;
b. Widening and sealing of the existing road pavement between the edge of the existing
road to the new lip of kerb for the width of the frontage;
c. Construction of a 2.0m wide pedestrian footpath in accordance with the conditions of
this Decision Notice;
d. Filling in of the table drain for the length of the frontage and providing an underground
stormwater line to accommodate flows from the upstream table drain;
e. Removal of the existing property access to 5 Pearl St and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage and proposed works,
including the provision of topsoil and turf where the existing verge is grassed.
Site Access and Driveways
31. A sealed access driveway must be provided from Pearl Street to all parking and manoeuvring
areas of the development. The works must include in particular:
a. A driveway crossover generally in accordance with Councils standard drawing RS-051
and approved plan 23098 / SK10 Rev G as prepared by Morgan Consulting Engineers.
Page 6 of 31
Document Set ID: 24681870
Version: 7, Version Date: 17/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 924 KB (small file)
- File type
No other editions are linked here.