Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2014-08-19 Infrastructure and Services Committee Agenda

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               19 AUGUST 2014


SECTION             RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                               LOOKING AHEAD
Building and        •   Undertaken testing of 107 Council        •   Maintenance program to be delivered in       •   Building and Plumbing services to
Plumbing Services       owned backflow prevention devices.           two parts                                        transfer to Noosaville Depot including
                        Testing of these devices were                                                                 opening up public counter
                                                                         o      Annual testing
                        previously undertaken by a contractor
                                                                                                                  •   Continue to identify all outstanding
                                                                         o      24 hour seven day per week
                    •   Development of waste water and                                                                building finals
                        amenities block for the Boreen Point                    emergency call out
                                                                                                                  •   Boreen Point caravan park installation
                        Caravan Park                             •   Boreen Point Caravan Park design and             works to commence
                    •   Audit program for waste water disposal       drafting hydraulics has been completed
                        systems established                          with product sourcing and pricing in final   •   Testing of domestic wastewater
                                                                     stages                                           treatment facilities to commence in
                    •   Notification of outstanding building                                                          September
                        finals letters sent to a number of       •   Identification of existing domestic
                        homeowners                                   wastewater treatment facilities has been     •   Undertake Enterprise Risk Management
                                                                     completed and records have been                  assessment
                    •   Supported Council’s maintenance              consolidated
                        program                                                                                   •   Development of Branch Plan
                                                                 •   Continue to identify all outstanding
                                                                     building finals
                                                                 •   Reactive and preventative maintenance
                                                                     program to be undertaken for council
                                                                     owned buildings/ properties
                                                                     •       39 public amenities
                                                                     •       138 parks and gardens
                                                                     •       3 caravan parks
                                                                     •       3 cemeteries
                                                                     •       42 beach accesses
                                                                     •       1 slipway
                                                                     •       Water mains (Boreen Point)
                                                                     •       Bore pumps (Kin Kin, Boreen Point)




                                                                                       Page 8 of 51
Log in to download the original file

2014-08-19 Infrastructure and Services Committee Agenda(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.