Original source · versioned page text
2014-08-19 Infrastructure and Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 19 AUGUST 2014
SECTION RECENT ACHIEVEMENTS CURRENT PRIORITIES LOOKING AHEAD
Building and • Undertaken testing of 107 Council • Maintenance program to be delivered in • Building and Plumbing services to
Plumbing Services owned backflow prevention devices. two parts transfer to Noosaville Depot including
Testing of these devices were opening up public counter
o Annual testing
previously undertaken by a contractor
• Continue to identify all outstanding
o 24 hour seven day per week
• Development of waste water and building finals
amenities block for the Boreen Point emergency call out
• Boreen Point caravan park installation
Caravan Park • Boreen Point Caravan Park design and works to commence
• Audit program for waste water disposal drafting hydraulics has been completed
systems established with product sourcing and pricing in final • Testing of domestic wastewater
stages treatment facilities to commence in
• Notification of outstanding building September
finals letters sent to a number of • Identification of existing domestic
homeowners wastewater treatment facilities has been • Undertake Enterprise Risk Management
completed and records have been assessment
• Supported Council’s maintenance consolidated
program • Development of Branch Plan
• Continue to identify all outstanding
building finals
• Reactive and preventative maintenance
program to be undertaken for council
owned buildings/ properties
• 39 public amenities
• 138 parks and gardens
• 3 caravan parks
• 3 cemeteries
• 42 beach accesses
• 1 slipway
• Water mains (Boreen Point)
• Bore pumps (Kin Kin, Boreen Point)
Page 8 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.