Council archive · source document
Minor Change Existing Approval - 132002.220261.1 (As Published)
4. ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
S01 C3 Drawing Schedule & Transmittal 21/07/2026
Prepared by Long View Consulting Engineers
S02 C3 Structural Notes Sheet 21/07/2026
Prepared by Long View Consulting Engineers
S03 C3 Site Plan, Framing Plan, Elevations 21/07/2026
Prepared by Long View Consulting Engineers
S04 C3 Jetty Framing Details Sheet 1 21/07/2026
Prepared by Long View Consulting Engineers
S05 C3 Jetty Framing Details Sheet 2 21/07/2026
Prepared by Long View Consulting Engineers
- - Embedment Repair Detail for Jacket/Seabed Seal -
Prepared by Long View Consulting Engineers
2. Structures should be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.
3. Jetties should have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
4. An adequate handrail shall be fitted on one side of the walkway.
5. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide support for the handrail.
6. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
7. There shall be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall.
8. Rock scour protection, wrapped in geotextile, extends 3000mm from the face of the
revetment wall in this locality. Prio to driving piles, the rocks are to be removed to expose the
geotextile and the geotextile cut neatly to allow it to be turned back. During pile driving, care
is to be taken to ensure the geotextile is not damaged. At the completion of pile driving, the
fabric is to be turned down around the pile and the rocks replaced around the piles.
9. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
10. Boat repair activities will not be permitted on site.
11. Wastewater and sullage shall only be disposed of at approved pump out facilities.
12. The mooring facility shall not be utilised for live-aboard purposes.
Page 2 of 5
Document Set ID: 25212912
Version: 4, Version Date: 02/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132002.220261.1 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 147 KB (small file)
- File type
No other editions are linked here.