Minor Change Existing Approval - 132002.220261.1 (As Published)
13. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protect Act EPA
(1994) and the Environmental Protection (Water) Policy 1997.
14. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangement to ensure adequacy of design and work. Also any approval
granted does not warrant that such plans and specifications have been checked in detail, nor
does not warrant that such plans and specifications have been checked in detail, nor does it
absolve the owner of the land from complying with all the conditions of this approval and/or
relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations
in the execution and/or performance of said works. The Council does not accept any
responsibility for the accuracy of such plans and specifications as approved.
15. Certification by a Registered Professional Engineer of Queensland that states that the jetty
is constructed in accordance with best practice methods and is structurally sound shall be
submitted to Council prior to the return of any bond monies held by Council. A final inspection
and approval of the structure by Council’s Inspector is also required prior to the return of any
bond monies held by Council. Please contact Councils Land Development Section to arrange
the inspection.
16. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.
17. The jetty shall be licensed with the Council upon completion of the structural work and shall
be licensed annually thereafter.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/Planning-and-
Development/Development-tools-and-guidelines/Infrastructure-Charges
7. PROPERTY NOTES
Not applicable
8. VARIATION APPROVAL DETAILS
Not applicable
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Not applicable
10. SUBMISSIONS
Not applicable
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
Page 3 of 5
Document Set ID: 25212912
Version: 4, Version Date: 02/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132002.220261.1 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 147 KB (small file)
- File type
No other editions are linked here.