Revised Stormwater Mangement Plan
Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
Indicative location of the detention tank can be found in Appendix E. Flow hydrographs and
the water levels inside the tank of each detention tank for various AEPs are obtained through
the XPSTORM model. The results are presented in Appendix F.
Table 3.6 lists the key parameters of the above-ground detention tank.
Table 3.6 Specification of each roof water detention tank
Tank base area (m²) 3.795 (1.15 x
Underground Detention tank
3.30)
Tank internal height (m) 2.02
Tank Volume (m3) 7.67
First orifice Invert RL from ground level (mm) 10
First orifice diameter (mm) 40
Second orifice Invert RL from ground level (mm) 1000
Second orifice diameter (mm) 50
Tank outlet pipe diameter (mm) 150
A schematic plot is presented in Figure 3.3, the location of the orifices are illustrated.
Figure 3.3 Illustration of the proposed 7 KL detention tank
File Name: WCD-22936 – 65-67 Elanda_SWMP.docx
Revision: E 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.