Original source · versioned page text
Revised Stormwater Mangement Plan
Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
For each tank, the flow discharge is the sum of the flows from the two orifices. The sum of
the flows from the proposed two detention tanks and by-pass areas shall be no greater than
the total flow discharge from pre-development site, details of which are presented in Table
3.7.
Table 3.7 Mitigated Flows using roof water Detention Tank
Storm event Peak flow from Peak flow from Sum of the peak
detention tanks all the by-pass flow (m3/s)
(m3/s) area (m3/s)
63% AEP, 25min 0.006 0.013 0.019
39% AEP, 25min 0.006 0.016 0.022
20% AEP, 25min 0.008 0.023 0.031
10% AEP, 25min 0.010 0.029 0.039
5% AEP, 25min 0.010 0.034 0.044
2% AEP, 25min 0.018 0.036 0.054
1% AEP, 25min 0.022 0.040 0.062
File Name: WCD-22936 – 65-67 Elanda_SWMP.docx
Revision: E 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.