Revised Stormwater Mangement Plan

Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
In table 3.7, the sum of the peak flow represents the mitigated post-development peak flows.
In order to assess the efficiency of the proposed detention tank, flow results are further
compared, as shown in Table 3.8.

Table 3.8 Flow outcome assessment

            Storm Event      Unmitigated Post-       Mitigated Post-     Pre-development
                             development Peak    development peak flow   peak flow (m3/s)
                                 Flow (m3/s)               (m3/s)
        63% AEP, 25min                0.031                0.019              0.017
        39% AEP, 25min                0.036                0.022              0.022
        20% AEP, 25min                0.051                0.031              0.035
        10% AEP, 25min                0.061                0.039              0.046
        5% AEP, 25min                 0.070                0.044              0.054
        2% AEP, 25min                 0.074                0.054              0.059
        1% AEP, 25min                 0.082                0.062              0.069



In Table 3.8, it can be observed that after the mitigation of the detention tank the peak flows
are significantly reduced in comparison to the unmitigated post-development peak flows.
Moreover, through the comparison between the mitigated post-development peak flow and
the target flow of mitigation, it can be observed that the proposed stormwater system
achieves the target of “no-worsening”.




File Name:            WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:             E                                                                     18
Log in to download the original file

Revised Stormwater Mangement Plan.pdf · 9.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.