Notice
Information request
Information Request
1. Strategic Cropping Land (SCL)
Introduction
The proposed development is for a material change of use (MCU) and requires referral to the Department of
Natural Resources and Mines (DNRM) as per, schedule 7, table 3, item 27 of the Sustainable Planning
Regulation 2009. The proposed development will be assessed against SPP 1/12 Protection of Queensland’s
strategic cropping land (SPP 1/12).
In the application you have elected to treat the land as SCL for the purposes of this application (Question 3 of
IDAS form 35—Strategic cropping land). As indicated on Form 35, where the land is potential SCL and the
applicant has elected to treat the land as if it were SCL for the purposes of the development application, the
assessment will be based on the land being SCL (as per section 84 of the Strategic Cropping Land Act 2011).
Should you choose to dispute that the land is SCL, you will need to submit an SCL validation application. An
SCL validation application is not an application under the Sustainable Planning Act 2009. The SCL validation
application must be made under the Strategic Cropping Land Act 2011. The outcome of an SCL validation
application can not be considered as part of the MCU application, until a decision on the validation application
has taken effect and you change the MCU application as per section 351 of the Sustainable Planning Act 2009.
Results of preliminary assessment
MCU applications that involve particular development on SCL are assessed based on the extent/location of the
development footprint in relation to the SCL on the subject lot under the relevant section of SPP 1/12. For SCL
assessment purposes, footprint has the same meaning as Schedule 26 of the Sustainable Planning Regulation
2009. For preliminary approvals unless demonstrated otherwise, the development extent as per the plan of
development is taken to be the footprint of the development.
The proposed development has a footprint greater than 3000 m2 and is located within the strategic cropping
land management area. Section 4.5 of SPP 1/12 states that development that is for a MCU in the management
area, only complies with the requirements of SPP 1/12 if it satisfies the requirements in section 4.2.2 of the
SPP.
Additional information required to assess the application
Further information is required to demonstrate how the proposed development will satisfy SPP 1/12—
specifically how the proposal meets s4.2.2 (d) of SPP 1/12 and should include but is not limited to a report that
demonstrates:
That the development provides a public benefit and no other site is suitable for the particular purpose
(overriding need).
How permanent impacts on SCL have been avoided to the greatest extent possible.
How permanent impacts on SCL have been minimised where impacts could not be avoided.
The location and area of permanently impacted land and the mitigation value (s139 Strategic Cropping
Land Act 2011) including:
- Map/s or plan/s (at an appropriate scale),[1] showing all areas of SCL and the location/extent of all
footprint components.
- Calculate of the area of the footprint and the mitigation value.
1
Maps and plans at a property level provided to DNRM must contain either fixed identifiable features or include digital cadastral boundaries
Page 3 of 7 • 091217 Department of Natural Resources and Mines
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IC0213NAM0001_SC14279_130304_IR_DL_dvb_signed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 457 KB (small file)
- File type
No other editions are linked here.