Job No, C06/023

Corrosion protection is needed for sand anchors for the same reason as for the vertical piles, but the
length of treatment should be increased to 5 metres allowing for the slope.

3.7. Slope Alteration Issues & Monitoring

An aim in the construction is to cause as least disturbance to the natural slope as possible. The tree
protectlon and retention requirement can be satisfied by the design, which is a strong point in the long
term stability of the site.

A short term alteration is the provision of access for the screw pile installation machine. This is only a
smail machine capable of working on a narrow track through the trees and would have no effect on short
term stability. When piling is completed the tracks should be restored to the contours of the natural
slope then covered with mulch matting to prevent erosion in the short term,

Survey marks should be established on the structure to monitor the construction and surrounds for
movement. There is some evidence in the shape of the ground surface and in the shape of trees, that
there has been some down slope movement of surface soils from gravity and erosion effects. With the
proposed construction, such effects should be eliminated or at the very worst minimized to be within
tolerable levels (i.e. less than 20mm) in the building lifetime.

Nevertheless, this possibly should be monitored at regular intervals, say three monthly in the first year,
and subject to the results, It may be possible to cancel this altogether.

4.0 CONCLUSIONS

The proposed construction, a residential dwelling on this site is feasible provided that the long term aims
are addressed as required by the Noosa Hill Development Plan and the Noosa Clty Council
requirements for development in a sand dune area.

Foundation System - Screw Piles

Slope Support - Retaining wall with screw or sand anchors for an
assumed erosion height of 1.5 to 2 metres.

Short Term Provisions - Reinstate access tracks and cover with mulch mat.
- Monitoring far structure movement in first 12 months.

Long Term Provisions - Irrigation systems for general Irrigation.
- Inspections for success of under floor vegetation.
- Stormwater and slope erosion effects should also be
addressed by a regular inspection at least annually.

Yours faijnfully

   
   

for and on behalf of
MORRISON GEOTECHNIC PTY LIMITED

Encl: Site Plan

cc. A. Becconsall

00697 S Biggs MORRISON GEOTECHNIC

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.