Council archive · source document
08/0746 - Op Works - Stormwater [As Published] · 142008.746
Job No, C06/023 Corrosion protection is needed for sand anchors for the same reason as for the vertical piles, but the length of treatment should be increased to 5 metres allowing for the slope. 3.7. Slope Alteration Issues & Monitoring An aim in the construction is to cause as least disturbance to the natural slope as possible. The tree protectlon and retention requirement can be satisfied by the design, which is a strong point in the long term stability of the site. A short term alteration is the provision of access for the screw pile installation machine. This is only a smail machine capable of working on a narrow track through the trees and would have no effect on short term stability. When piling is completed the tracks should be restored to the contours of the natural slope then covered with mulch matting to prevent erosion in the short term, Survey marks should be established on the structure to monitor the construction and surrounds for movement. There is some evidence in the shape of the ground surface and in the shape of trees, that there has been some down slope movement of surface soils from gravity and erosion effects. With the proposed construction, such effects should be eliminated or at the very worst minimized to be within tolerable levels (i.e. less than 20mm) in the building lifetime. Nevertheless, this possibly should be monitored at regular intervals, say three monthly in the first year, and subject to the results, It may be possible to cancel this altogether. 4.0 CONCLUSIONS The proposed construction, a residential dwelling on this site is feasible provided that the long term aims are addressed as required by the Noosa Hill Development Plan and the Noosa Clty Council requirements for development in a sand dune area. Foundation System - Screw Piles Slope Support - Retaining wall with screw or sand anchors for an assumed erosion height of 1.5 to 2 metres. Short Term Provisions - Reinstate access tracks and cover with mulch mat. - Monitoring far structure movement in first 12 months. Long Term Provisions - Irrigation systems for general Irrigation. - Inspections for success of under floor vegetation. - Stormwater and slope erosion effects should also be addressed by a regular inspection at least annually. Yours faijnfully for and on behalf of MORRISON GEOTECHNIC PTY LIMITED Encl: Site Plan cc. A. Becconsall 00697 S Biggs MORRISON GEOTECHNIC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.