Job No. C06/023

3.5.3 Design Parameters

Case 1 & 2 (Bottom Wall)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sand Density 17 KNim*
Average Angle of Friction ($) of retained sand 30°
Average Slope of retained sand (8) 26°

fh 0.87
Active Pressure Coeff. Ka 0.6
Passive Pressure Coeff Kp 0.75
Surcharge NIL

Case 3 (Top Wall)

Sand Density 17 KNim>
Average Angle of Friction of retained sand 30°
Slope of retained sand 30°
Bib 1.0 8
Active Pressure Coeff. Ka 0.85
Passive Pressure Coeff Kp 2.0
Surcharge 5 kPa

 

For the central scour zone, assume an excavation depth of 2,0 metres (0,5 metre margin for erosion)
and apply the same parameters.

As tree preservation on this site is a key issue, the Slope cannot be compromised by the removal of any
tree to accommodate the walls except for Safety reasons. The two walls as proposed can however be
located to avoid existing trees.

A space in the wall may be left to avoid trees but the length of the space must be considered as part of
the slope. Soil forces from any space must be resisted by the adjacent retaining wall.

3.6 Anchor Support

The anchor support system can be detailed for horizontal restraint and moment, using the above data
and H = 1.0 to 1.5 metres. Moment considerations may require two rows of anchors, staggered at a
spacing of not more than 3 metres.

angle down from the harizontal or as an alternative, sand anchors Installed using air, and tensioned
the required load restraint. Any restraint, whether using screw piles or conventional sand anchor ;
should be load tested to not less than 1.3 times the design working load.

The approximate anchor tension of 6OKN to 100kN could be accommodated using screw piles at a og

Depending on the test results and in the experience of the anchor contractor, It may be necessary to
include grouting of the anchors to remove any doubt in the integrity of the sand which supports the
anchor in tension.

At the north end of the proposed construction, the clearance to the boundary is only 4-4.5 metres. Here
the anchors may be set at a steeper angle or skewed to take advantage of the stronger sand at depth.
Otherwise the anchor tension resistance could be limited to about 4 tonnes when set in the top very
loose sand.

Wall anchors should always be behind the active wedge (Figure 2) and to avoid load on the toe of the
wall from the anchors, their length should be extended below the line of the sand strength or angle of
fepose. For this site all anchors should be extended below the zone of potentially unstable sand as
shown in Figure 2.

00697 S Biggs MORRISON GEOTECHNIC

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.