July 2003 -~4- : 02682118(AD)

 

Eleven of the twelve dynamic cone probes were carried out continuously from the surface,
without intermediate augering. One of the twelve cone probes (Location BHI as shown on
Figure 1) was carried out within the augered borehole by augering to or beyond the previously
probed depth, before continuing with the probe. This was done to minimise build up of
friction along the probe rods. However, it was decided upon completion of this auger/dynamic
cone probe that the disturbance caused by the augering process was unacceptable, and that
continuous probes should be conducted. Dynamic cone rods without external collars (which
are the cause of excessive friction on the rods) were obtained, and the field work was
completed with this equipment.

The fieldwork was supervised full time by a geotechnical engineer from our Brisbane office,
and a ‘walk over’ inspection of the site was conducted by an experienced senior geotechnical
engineer, also from our Brisbane office.

4.2 2003 Investigation

To.address item 7 of the Noosa Council information request, five DCP tests were conducted
across the proposed building area to depths of up to 6 m. The DCPs were carried out by a
senior geotechnician on 25 June 2003. Reports of DCP Tests (2003 Investigation) are
presented in Appendix B. DCP test locations are shown in Figure 1.

5.0 GROUND CONDITIONS

Results of the field work for the 1990 investigation are included in this report as Appendix A.
Detailed descriptions of the strata encountered in the hand auger holes are given in test bore
reports, and the results of the dynamic cone probes are included as Table Al in Appendix A.

Detailed logs of the four boreholes and the results of the dynamic cone tests for the 1981
investigation are included in this report as Appendix A.

Three cross sections perpendicular to the slope contours have been drawn (Figures 2, 3 and 4
Appendix A), and one section along the line of the proposed walkway has also been prepared
(Figure 5 Appendix A). Borehole profiles and plots of dynamic cone results have been
included on these sections,

The general downward sequence indicated by the previous investigations, and confirmed by
the 2003 investigation, is as follows:

Very loose to loose sand — encountered in all bores and indicated by all dynamic cone
probes, to depths ranging from 0.9 m to 3.7 m. The average depth of the loose zone as

determined by the field investigations was approximately 3.0 m

Medium dense silty sand — encountered in al! bores and indicated by all dynamic cone
probes, to depths ranging from 3.8 m to 8.2 m.

Golder Associates

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.