July 2003 -8- 02682118(AD)

flowing sand will be of the order of 5 m to 6 m below the interface between the loose and
medium dense sand (i.e. a pile depth of 8 mto 9 m).

   

 

 

 

Passive K, = leterat earth
Praxaure Pressure coefficient
Olsiribuslal - 277
y Y = sof. -densily
K\ = 18 kim?
# K,,H H = death of moving sond
, am

Equtvalent Loterat Locd on Pls:
Pie dite yh a Sa"

 

NOT TO SCALE

 

Equvolint Pte a
Width {dounstopa} Equivatent Pua Width = LS ad
: * fupstopel

 

 

Foundations should also be taken below a line extending from Park Road upslope at 27

degrees (Ref Figure 2). This means that if piled foundations are required near the top of the
block they will need to be at least 10 m deep.

6.4 General Points

It is critical that vegetation disturbance be minimised during construction and that wherever
vegetation is destroyed (eg. under the proposed building).erosion control matting be laid to
assist in revegetation and to guard against localised instability. Strict control should be
imposed on trafficable areas during construction by temporary fencing and log steps (or
equivalent). All foundation construction on the site should be carefully monitored by an
experienced geotechnical engineer from Golder Associates.

A Construction Management Plan (CMP) for the proposed works has been developed by Tod
Noosa (Appendix C). The CMP has been reviewed by Golder Associates.

It is noted that the sand slope to the beach below Park Road adjacent to this site has a low
factor of safety against stability failure. If this slope and Park Road failed, the resulting slope
movement could have a major effect on the proposed development, beyond the considerations
or brief of the current work.

Golder Associates

8

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.