Council archive · source document
08/0746 - Op Works - Stormwater [As Published] · 142008.746
July 2003 -7- 02682118(AD) In considering the feasible pile foundation types, consideration must be given to the effect of pile construction techniques on the stability of the slope. Jetted concrete piles would require large volumes of water for their installation, which could possibly result in severe scouring of the sand slope. Hence it is advised that jetted concrete piles should not be used on this site. Any form of driven pile should not be used on this site, since vibrations caused by the installation process could potentially initiate slope instability. ’ Based on these considerations, bored or grout injected piers are considered appropriate for both the proposed buildings and the proposed walkway. However, due to limitations on site access and on heavy loads being placed on the slope, heavy duty drilling equipment is impractical for this site. Small tripod type auger rigs (for bored pier construction) or small skid rigs are available and would be well suited to the site. It could be expected that difficulty may be encountered in maintaining an unsupported open hole in the loose sand near the surface, and that some form of stabilisation has been achieved on other sites on the same sand dune by augering out to 2 m or 3 m, running cement and some water down the auger flights, and then drilling out the following day. Spoil from pile excavation should not be stockpiled on the slope, and similarly, any drilling fluids used in drilling the piles should not be discharged onto the slope. The vertical loads to be imposed on the foundations will be small, and hence the ultimate bearing capacity of the soil will not be the limiting factor in the foundation design. The vertical load capacity will be a function of pile type and founding depth. It is estimated that a 400 mm diameter pile would have a working load capacity of 300 to 400 KN founding 8 m below existing ground level in medium dense sands. Further information contained in a letter by Tod Noosa dated 17 June 2003 indicates that the maximum load on a single 450 mm diameter pile will be 20 tonne (200 KN) including the weight of fully loaded stormwater and sewage tanks. The nominated pile structural capacity and founding depth is 50 tonne and 9 m respectively on the Tod Noosa drawings. Further investigation would be necessary if higher load capacity piles are required. However, lateral loads on the piles are potentially significant. If localised instability develops in the loose surface sand directly up the slope from a pile, heavy loads will be placed on the pile as the sand flows down the slope past the pile. Estimation of lateral forces on piles should be based on an assumption that lateral ground movements occur along the interface between loose and medium dense sand. The average depth of the zone of loose sand was determined as 3 m. The calculation of lateral forces on piles should be carried out in accordance with the method outlined in the figure below. It is estimated that the depth of embedment required to resist the lateral forces developed by the Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.