INTEGRATED PLANNING ACT 1997
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
~~ Name of water body, watercourse or aquifer (if known)
Part A, Version 3.1, 3 March 2008
[1
Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994
Lot on plan description for strategic port land Port Authority the lot
[1
Table F Complete if the premises are in tidal water
Name of focal government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable) —
{1
3. Indicate the total area of the premises on which the development is proposed: (Note: The fofal area may include land both above and below water)
. Total area of premises |
0.11 Cm [xj hectares (Tick applicable unit)
{Existing use of the premises |
4. Current use/s of the premises: (o.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
[1 | Vacant land |
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?
(1 No
‘Proposal details . . . |
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
Yes - Ensure the type, tocation and dimensions of each easement are included in plans, submitted with the application
Single dwelling
7. Does the poposal include new buildings or operational work (including any services) on the premises?
[J No
‘Resource entitlement (if eppfcabie) _- further information is provided jn the aavice section at the end of the form a |
Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Goto Q9 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
[Owner's consent (if enpicable} _- further information is provided in the advice section at the end of the form . 2 - 4
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
| Date consent
was obtained «|
Details of the premises owned
(street address or Jot on plan description)
“ Premises Owner's namels
Table H and postal address
Owner's signature”
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, s127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .
Attachments and supporting Information (Complete Table | - Use a separate row for each type of attachment or information, including Information required
under this Part) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, elc, are securely attached to this Part of the Form.
Description of attachment or information | tite qrapptoabey Method of delivery to
i pplicable) lethod of delivery to
Table | fea. ”‘icalaveilonar pr owigs pats) (e.g, General Aubhorily. James StreetTreffic Report) oe assessment manager
1 IDAS Checklist April 2008 mail
2 IDAS Form 1 Part E April 2008 mail
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.