08/0746 - Op Works - Stormwater [As Published] · 142008.746
INTEGRATED PLANNING ACT 1997
Part A, Version 3.1, 3 March 2008
3 Drawing 07559-C00 Revision C Drawing register and locality plan | April 2008 mail
4 Drawing 07559-C01 Revision C Stormwater management plan April 2008 mail
5 Drawing 07559-C02 Revision C Stormwater longitudinal section April 2008 mail
6 Drawing 07559-C03 Revision C Sediment and erosion plan April 2008 mail
7 Geotechnical Report Morrison Geotechnic, 7 pages 23 Nov 2006 | mail
8 Geotechnical Report Golder Associates, 31 pages July 2003 mail
9 Easement registration confirmation Letter ex Alan Becconsall, 5 pages | 1 April 2008 | mail
10 | Development Programme Revision B, 1 page 2 Dec 2007 | mail
(Portable Long Service Leave (PLSL) levy (AppScabés for cartain building and construction work vaiued over $80.000 only
10. The Portable Long Service Leave Levy (PLSL} is not applicable to this application if any of the following apply: ( Tick box if applicable)
{CJ the application seeks a preliminary approval only;
(1) the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
8 ail costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(2) the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. 1s payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
No - End of Part A
OO Yes -
Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
Fee ($)
Date received
Receiving officer's
name
Reference
numbers
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
Council. | have been engaged as the private certifier for the building work referred to in this application.
BSA Certification number.
Building classification’s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or
private certifier if applicable)
Date receipted :
* Deseription of the work Leave Project Number {Amount paid ($}| Date paid eeamert Names om “oie
_ y : PE _ manager sneer
jm
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for 2 purpose outside of the IDAS process, except where required by jegistation (including the Freedom of Information Act 1992) or as
yequired by Pariament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.