Council archive · source document
08/0746 - Op Works - Stormwater [As Published] · 142008.746
INTEGRATED PLANNING ACT 1897 Part E, Version 3.1, 3 March 2008
WW Form 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme
Nature of the works |
1. Nature of work that requires assessment against a planning scheme:
(] Building work - Complete Table A Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
([] Roadworks Stormwater (C] Water infrastructure [[] Sewerage infrastructure
[[] Landscaping CO Earthworks () Drainage Works CL Signage
([] Clearing vegetation under the planning scheme ([] Other - Specify betow
(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, il may be more appropriate to provide these details in an attachment to this form)
Development Permit [J] Preliminary approval (] Both (Specify betow)
(iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No {[] Yes - Specily the number of lots being created
(iv) Are there any current approvals associated with this application? (.9. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
LI No Yes - Complete Table B(a)
Table B(a) List of approval references ; Date approved Date approval lapses (itknown) /
1 23218DA 13-Dec-2007 13-Dec-2012
Table B
(i) What is the nature of the operational work?
(J Roadworks (1) Stormwater () Water infrastructure (] Sewerage infrastructure
([] Landscaping ( Earthworks () Drainage Works CL Signage
(] Clearing vegetation under the planning scheme Other - Specify below
Sediment and erosion contro!
(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
Development Permit [] Preliminary approval LJ Both (Specify below)
{iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No [_] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.9. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
(J No Yes - Complete Table (a)
Table B(a) | ~~" st of approval references " Date approved Date approval lapses (if known} |
1 23218DA 13-Dec-2007 13/12/2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.