Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

08/0746 - Op Works - Stormwater [As Published] · 142008.746

of 65

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1897 Part E, Version 3.1, 3 March 2008

WW Form 1 Development Application
Part E

Building &/or operational works assessable
against a planning scheme

   
 

 

 

 

Nature of the works |
1. Nature of work that requires assessment against a planning scheme:
(] Building work - Complete Table A Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?

([] Roadworks Stormwater (C] Water infrastructure [[] Sewerage infrastructure
[[] Landscaping CO Earthworks () Drainage Works CL Signage
([] Clearing vegetation under the planning scheme ([] Other - Specify betow

(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, il may be more appropriate to provide these details in an attachment to this form)

Development Permit [J] Preliminary approval (] Both (Specify betow)

(iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No  {[] Yes - Specily the number of lots being created

(iv) Are there any current approvals associated with this application? (.9. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

LI No Yes - Complete Table B(a)

 

 

 

 

 

 

 

 

Table B(a) List of approval references ; Date approved Date approval lapses (itknown) /
1 23218DA 13-Dec-2007 13-Dec-2012
Table B
(i) What is the nature of the operational work?
(J Roadworks (1) Stormwater () Water infrastructure (] Sewerage infrastructure
([] Landscaping ( Earthworks () Drainage Works CL Signage
(] Clearing vegetation under the planning scheme Other - Specify below

 

Sediment and erosion contro!

 

 

 

(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

Development Permit [] Preliminary approval LJ Both (Specify below)

{iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No  [_] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.9. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

(J No Yes - Complete Table (a)

 

Table B(a) | ~~" st of approval references " Date approved Date approval lapses (if known} |

 

1 23218DA 13-Dec-2007 13/12/2012

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.