08/0746 - Op Works - Stormwater [As Published] · 142008.746
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
2. What is the dollar value of this operational work? (2. the otal value including GST, materials and labour) |$ —B-B8-—- {() {000.006
(Mandatory information
3. Confirm that the following mandatory information accompanies this application
| Confirmation of
lodgement Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works finctuding the
lextent of any cut and fil) Confirmed
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
«Part A must also be completed for all IDAS development applications.
|e — The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.