2014-09-16 Planning & Organisation Committee Agenda

of 141

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                         AGENDA


  Planning & Organisation
     Committee Meeting


          Tuesday, 16 September 2014


                   commencing at 1.30pm
          Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Frank Wilkie (Chair), Noel Playford, Joe Jurisevic, Tony Wellington
Log in to download the original file

2014-09-16 Planning & Organisation Committee Agenda(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 78 (of 141)

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA            16 September 2014


TABLE OF CONTENTS

ITEM                                                                      PAGE


ATTENDANCE & APOLOGIES                                                       -
PRESENTATIONS                                                                -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                 3
DA Planning & Environment                                                    3
1      DEVELOPMENT APPLICATION FOR PRELIMINARY BUILDING WORKS
       ASSESSABLE AGAINST THE PLANNING SCHEME FOR ADDITIONS TO A
       DETACHED HOUSE 19 ALLAMBI RISE NOOSA HEADS - PBA14/0017               3
2      APPLICATION FOR MATERIAL CHANGE OF USE ANIMAL HUSBANDRY TYPE 2
       - INTENSIVE) AND ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 -
       POULTRY FARMING) SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD
       MCU12/0184                                                           23
3      APPLICATION FOR MATERIAL CHANGE OF USE - MULTIPLE HOUSING TYPE 4
       CONVENTIONAL (4 UNITS) AND ASSOCIATED OPERATIONAL WORKS
       SITUATED AT 28 NANNYGAI STREET, NOOSAVILLE MCU14/0051 &
       OPW14/0274                                                           69
4      DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT INTO 2
       LOTS AND AN ACCESS EASEMENT AT 22 & 23 EDWARD STREET, COORAN
       REC14/0002                                                           93
Strategic Land Use Planning                                                109
5      PLANNING & DEVELOPMENT BILL 2014 AND PLANNING & ENVIRONMENT
       COURT BILL 2014                                                     109
CORPORATE SERVICES DEPARTMENT REPORTS                                      115
6      ADVERTISING EXPENDITURE POLICY REPORT                               115
7      2014/15 NATIONAL COMPETITION POLICY REFORM APPLICATION              119
Finance                                                                    122
8      FINANCIAL PERFORMANCE REPORT AUGUST 2014                            122
ICT                                                                        131
9      TELECOMMUNICATION SERVICES UPDATE                                   131
Revenue Services                                                           133
10     JULY 2014 RATE LEVY                                                 133
EXECUTIVE OFFICE REPORTS                                                   137
Community Engagement                                                       137
11     COMMUNITY ENGAGEMENT PROJECT NEWDEMOCRACY FOUNDATION                137
CLOSED SESSION                                                       141
12     CLOSED SESSION ITEM - ACCESS ISSUE WALTER
       HAY DRIVE - NOOSA ON WEYBA - PLANNING & ENVIRONMENT COURT
       APPEAL (NORTHBROOK) - MCU12.0208                        141




                                                                 Page 2 of 145

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            16 September 2014



PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)
DA Planning & Environment
1                        DEVELOPMENT APPLICATION FOR PRELIMINARY BUILDING WORKS
                         ASSESSABLE AGAINST THE PLANNING SCHEME FOR ADDITIONS TO A
                         DETACHED HOUSE 19 ALLAMBI RISE NOOSA HEADS - PBA14/0017
DOCUMENT INFORM AT ION




Author                          Planning Technical Officer, Glen Conforti
                                Planning & Infrastructure Department

Index                           ECM / Application / PBA14/0017

Attachments                     1.   Locality Plan
                                2.   Proposal Plans



         APPLICATION DETAILS

         Applicant                          R. & C Kimberley c/ Tim Ditchfield Architects
                                             rd
         Proposal                           3 storey addition to a detached house

         Properly Made Date                 20 August 2014

         Information Request Date           Not Applicable

         Information Response Date          Not Applicable

         Decision Due Date                  18 September 2014

         Number of Submissions              Not Applicable

         PROPERTY DETAILS

         Property Address                   19 Allambi Rise, Noosa Heads

         RP Description                     Lot 2 RP121805

         Land Area                          759m²

         Existing Use of Land               Dwelling

         STATUTORY DETAILS

         SEQRP Designation                  Urban Footprint

         Locality                           Noosa Heads

         Zone                               Detached Housing

         Overlays                           No Applicable Overlays

         Assessment Type                    Preliminary Building Works Assessable against the Planning
                                            Scheme



                                                                                                   Page 3 of 145

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   16 September 2014


RECOMMENDATION
That Council note the report by the Planning Technical Officer to the Planning &
Organisation Committee Meeting dated 16 September 2014 regarding application
PBA14/0017 for Preliminary Building Works Assessable against the Planning Scheme – 3
storey addition at 19 Allambi Rise, Noosa Heads and approve the application in accordance
with the following conditions:
PLANNING
     When Conditions must be Complied With
1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
     prior to the use commencing, and then compliance maintained at all times while the
     use continues.
     Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are listed in the following
     table unless otherwise amended by these conditions.
      Plan No.         Rev.   Plan name, prepared by                               Date
      DD 1.01 P1       P1     Site Plan, prepared by Tim Ditchfield Architects     01/08/14

      DD 2.04 P1       P1     Undercroft Floor Plan, prepared by Tim Ditchfield    01/08/14
                              Architects

      DD 2.03 P1       P1     Lower Ground Floor, prepared by Tim Ditchfield       01/08/14
                              Architects

      DD 2.03 P1       P1     Upper Ground Floor, prepared by Tim Ditchfield       01/08/14
                              Architects

      DD 2.02 P1       P1     First Floor, prepared by Tim Ditchfield Architects   01/08/14

      DD 2.05 P1       P1     Roof Plan, prepared by Tim Ditchfield Architects     01/08/14

      DD 3.03 P1       P1     Section C-C, prepared by Tim Ditchfield Architects   01/08/14

      DD 4.01 P1       P1     South Elevation, prepared by Tim Ditchfield          01/08/14
                              Architects

      DD 4.02 P1       P1     East Elevation, prepared by Tim Ditchfield           01/08/14
                              Architects

      DD 4.03 P1       P1     North Elevation, prepared by Tim Ditchfield          01/08/14
                              Architects

      DD 4.04 P1       P1     West Elevation, prepared by Tim Ditchfield           01/08/14
                              Architects

     Building Height
3.   The maximum height of all new additions to the dwelling must not exceed 8 metres
     above the finished ground level and the natural ground surface. The new 3 storey
     portion is only permitted where indicated on the approved plans.




                                                                                          Page 4 of 145

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   16 September 2014


4.    Certification must be submitted to Council from a Licensed Surveyor which certifies
      that the building does not exceed the maximum height requirement of this Decision
      Notice.
      Performance Bond
5.    Security in the form of a cash bond or trading bank guarantee to the sum of $5,000
      must be submitted to Council, to secure performance of all conditions of this approval,
      prior to the issue of a Development Permit for Building Works. The cash bond or
      trading bank guarantee will be returned on performance of the conditions of approval
      less any costs incurred by Council in respect of enforcing performance of this permit.
      Council reserves the right to call upon the bond or guaranteed sum to effect
      compliance with conditions.
      Landscaping
6.    The land between the dwelling and the eastern boundary must be reinstated to the
      natural ground surface level except for the vehicle access to the north east corner of
      the lot.
7.    Existing trees on the site and within road reserves must be retained, except where
      required to be removed between the dwelling and the eastern boundary.
8.    Trees to be retained and must be protected from construction activities by:
      a.    clearly marking vegetation to be retained with flagging tape
      b.    installing protective fencing around the drip line of the vegetation
      c.    restricting stockpiling, storage and vehicle parking to those areas which are
            already cleared
      d.    using low impact construction techniques around vegetation.
9.    Screening vegetation must be planted along the eastern boundary in accordance with
      Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. The
      planted vegetation must have a minimum pot size of 200mm and consist of native,
      endemic species. In this regard, 4 species with a pot size of 45 litres, must be planted
      and evenly spaced along the length of the eastern elevation.
      Geotechnical Stability
10.   All works must be carried out in accordance with a Geotechnical Report for the site
      prepared by a qualified person*. Prior to the issue of a Development Permit for
      Building Works, certification must be submitted to Council from a qualified person*
      which certifies that the site is not at risk from landslide emanating from the site or from
      other land.
      External Colours
11.   External colours and finishes of the building must comprise of muted/environmental
      tones that blend with the natural environment to assist the building to blend with the
      surrounding vegetation. In this regard, the colour palette must be in accordance with
      the colour indicated on the approved plans or alternatively submitted to Council for
      approval prior to the issue of Development Permit for Building Works.
      ADVISORY NOTES
      The following notes are included for guidance and information purposes only and do
      not form part of the assessment manager conditions:




                                                                                       Page 5 of 145

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


     Development Compliance Inspection
1.   Prior to the commencement of the use, please contact Council's Planning Assessment
     Branch to arrange a Development Compliance Inspection.
     * Qualified Person – Geotechnical Stability
2.   For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
     stability for the development, a qualified person0 is considered to be a person who:
     a.    is a Registered Professional Engineer of Queensland (RPEQ); and
     b.    has a degree in civil engineering or engineering geology; and
     c.    has a minimum of 5 years’ experience in the field of geotechnical engineering or
           engineering geology.



REPORT
1.   PROPOSAL
The application seeks Preliminary Building Approval for renovations to a detached house.
The proposal includes a third storey within the front 6m setback, a new single vehicle
garage, the rendering of existing block and brick work, replacing the decking and a general
refurbishment of the internal layout. Given the steep slope, various areas of the existing
dwelling exceed the 8 metre building height in metres requirement of the Building Works
Code. In this regard, all new additions, including the proposed 3rd storey, are less than 8m
above the finished ground level and the natural ground surface.
2.   SITE DETAILS
2.1. Site Description
The lot fronts a small service type road off the main Allambi Rise, which services only the
subject dwelling, one other single dwelling and 2 multiple dwellings. The lot slopes steeply
from east to west at an approximate rate of 1:2. However, to avoid the steepest slope of the
land, the majority of the dwelling is nestled towards the eastern boundary, where the slope is
slightly less. Significant vegetation exists within the site down slope of the dwelling such as
mature Callitris pines, eucalyptus and protruding through the deck, a large Poinciana tree.
2.2. Surrounding Land Uses
Multiple dwellings adjoin to the north and east and detached houses to the south. Given the
steep slope of the surrounding land, premises nearby exceed 8m and are 3 storeys.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
•    State Planning Policies;
•    the South East Queensland Regional Plan;
•    State Planning Regulatory Provisions;
•    any Structure Plan or Master Plan in place for declared areas;
•    any Preliminary Approval Overriding the Planning Scheme for the land;
•    the Planning Scheme for the local government area; and
•    any Temporary Local Planning Instrument in place for the local government area.



                                                                                    Page 6 of 145

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the
SEQ Regional Plan Regulatory Provisions
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Noosa Heads Locality and is zoned Semi-Attached
Housing. The proposed use is identified as a consistent use within the zone and is required
to follow a code assessable application process.
Land Use & Works Provisions
The Building Works Code regulates land use and design for this application.
The application has been assessed against Building Works Code and the pertinent issues
arising out of the assessment are discussed below:
Setbacks and Building Height in Storeys
The proposal seeks a 2.5m front setback to construct a bedroom above the existing garage
and thus creating a 3rd storey. The proposed eastern elevation in Figure 1 shows the
location in relation to the front boundary, its presentation to the street and the neighbouring
property and shows the existing dwelling.




                       Figure 1- Proposed east elevation and existing



                                                                                    Page 7 of 145

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      16 September 2014


Setbacks
The part of Allambi Rise that the premises fronts is unusual as there is no footpath or green
space between the premises and road and therefore, no clear distinction between
public/private spaces. This part of Allambi Rise appears similar to a private driveway shared
by several properties. The photos in Figure 2 below show the only 3 properties that have
direct access from this part of Allambi Rise.

 Building Works Code                     Discussion

 Setbacks
 O1 Buildings and other structures
 are appropriately designed and
 sited to—
 a) provide amenity for users of the     The proposed setback does not create any overlooking or
 premises as well as preserve the        acoustic issues as there are no windows or doors facing the
 visual and acoustic privacy of          neighbours and an existing driveway provides adequate
 adjoining and nearby land uses;         separation for acoustic purposes.
 b) preserve any existing vegetation
 that will buffer the proposed
 building from adjoining uses;           There is an existing garden along the eastern boundary with
                                         plants in poor condition. A condition could be imposed to
 c) allow for landscaping to be          improve this garden with suitable native species.
 provided between buildings;
 d) maintain the visual continuity and   Given the unusual streetscape, as shown in Figure 2, there is
 pattern of buildings and landscape      no clear public/private delineation and therefore the proposal
 elements within the street;             would is not out of character with the street.
 e) for class 10a structures, do not     The garage location remains unchanged with a change to the
 visually dominate the street;           external material finish only proposed.




Figure 2 - Existing streetscape



                                                                                             Page 8 of 145

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     16 September 2014


Building Height in Storeys

 Building Works Code                   Discussion

 Height
 O10 Buildings and other
 structures–
 a) are low rise and present a         The proposal being less than 8m, presents a building height in
 building height consistent with       metres consistent with buildings and structures in the
 structures on adjoining and           surrounding area. It is noted that various premises nearby are
 surrounding land;                     3 storeys and exceed 8m. The proposal would not be out of
                                       character with nearby development.
 b) have a maximum building height
 of–
 ...v) otherwise - 2 storeys;          The new bedroom renders the building 3 storeys. The new
                                       single garage includes a new concrete slab, wall and a
                                       laundry refurbishment in the undercroft floor area which exists
                                       as 3 storeys. Creating the new garage at this level does not
                                       alter the extent of the 3 storey portion of the dwelling.


 c) do not visually dominate the       The proposal is seen from main beach but given the distance
 street, surrounding spaces or the     and the existing vegetation, it is unlikely that any recognisable
 existing skyline;                     change would occur to this vista. The applicant has indicated
                                       the intention to use colours that blend with the natural
                                       environment. A condition could be imposed to ensure this is
                                       undertaken. The proposal is not bulky or imposing and would
                                       not visually dominate the street, given that it presents as 2
                                       storeys.

 d) preserve the amenity of            The proposal preserves amenity in terms of privacy and
 surrounding land including privacy,   access to sunlight of surrounding land. However, although the
                                                                                              rd
 views and access to sunlight;         proposal complies with building height in metres, the 3 storey
                                       impedes some secondary south western views from the
                                       neighbouring property to main beach and the hinterland.
                                       These views are filtered through existing significant
                                       vegetation. The photo in Figure 3 shows the area of the roof
                                       and the view likely to be impeded.
                                       The non-compliance is of a technical nature because if the
                                       ‘basement cinema’ was converted to subfloor space and
                                       reinstated to the natural surface level, then technically 2
                                       storeys, the proposal would comply with building height in
                                       storeys. Noting also with this, that the external building
                                       elevations would remain unchanged and views from the
                                       neighbouring property would still be impeded. Alternatively, if
                                       a new dwelling was constructed to 8m and 2 storeys with a
                                                         nd
                                       6m setback for a 2 storey, the neighbouring views would still
                                       be impeded similarly to that impeded by the current design
                                       proposal.

 e) respect the scale of surrounding   The proposal will not extend above any of the existing trees
 vegetation;                           growing at a similar level.




                                                                                            Page 9 of 145

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      16 September 2014




          Figure 2 - Area of new storey viewed from neighbouring property


4.     CONSULTATION
4.1. Referrals
The application was forwarded to the following internal Council specialist:
•      Engineering
5.     CONCLUSION
The proposal is 3 storeys within the front setback and impedes some secondary views from
the neighbouring property. Should alternative options for a 2 storey built form be realised,
the same secondary views are likely to be impeded as impeded by that proposed. In this
context, and that the proposal will not dominate the skyline, the street, adversely affect
privacy or access to sunlight, the proposal meets the provisions of the Building Works Code
and is recommended for approval.

Departments/Sections Consulted:

     Community Services                           X   Planning & Infrastructure
     Disaster Management & Public Order               Building & Plumbing Services
     Waste & Environmental Health                     DA Planning
     Community Facilities                             Strategic Land Use Planning
     Cultural Facilities                              Asset Design & Investigations
                                                      Asset Planning
                                                      Civil Operations
                                                      Environment

     Executive Office                                 Corporate Services
     Community Engagement                             Finance
     Customer Service                                 ICT
     Executive Support                                Procurement & Fleet
     Governance                                       Property & Facilities
     Human Resources                                  Revenue Services




                                                                                         Page 10 of 145

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     16 September 2014


                                    ATTACHMENT 1 – LOCALITY PLAN




                                                        Page 11 of 145

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 12 of 145

+                                                                                                                                                                                                                                 LO
 _            a                                                                                                                                                                                                                    +
 al           z                                                                                                                                                                                                                    a
 N            s                 |                                                                     \         RP969GG               |          Bur2927                  |             LOT ID                                     So
 2            <                                                                                         MH                                                                              Lot 2 on RPI21805                          N
 &            2                                                                                         Wee.te                                                                          Noosa Shire Council                        o
 o            oO                                                                                      “                                                                                 Parish of WEBYA                            Da
 =             wc              i                                                                    & |                                                                                 County of MARCH                            oS
              o       Q
  Oo           '                                                                                      ms                                                                                759 me                                     a
 a            C      So       /                                                Common Property        |                         Neighbouring Lot                      30
  |           Z      a             |                                            BUP4736              $                            BUP333
              ~                             20° 48 30"                                               |
              oO    xX             |         14, 404m     /   Z
              <    ia             i                       ]                                         7                                                                  co
              E    le                                                 o  Shtse                      i                     ee                    ee
              <   fb             |                                        PaaS                                 ‘il           Te ——          £              4
 Pg                                                                                                 !          |                                             |
 Z                                                           A   a                           sel |             |                                             |
 O                                                          oO       l                         Xe}             |                                             |         ~
 <                                                          .                                dei].             |                                             |            |
 Oo                          |!                                   EN                   L            ‘          |                                             |
 é                         s                    ea    es                                   foot                |                       nt                                   pursods
                                                  A                                          Exister
 ke                       ome                  Lot 2             =                     =     Setback           |
 Ww                       oft                RP 21805             _$——S                   ee      |      ros                                                          oh                                N
 Ww                       inf                                      |                      Nd a                Existing Roofed Deck              Existing Roofed Deck
 =                                                          To        satan               °              =                                    [nary
 Lu                                                                   chee                NB     i                                    eel                    il|
Lu                                                    :      = ——                            2100                Existing First Floor                                                  o    2   4    6m
 E                                                            :                              Easting |          Adjacent Building                                     oS)                ee
 S                                                            |               1 |      E      rr 3               FFL37.860                                   |                         Seale |: 200@A3
 =                                                           oe                             poem,        UL       LUI                                        |                       Em tenn ta
 O                                                        ;          FFL 37.860                             ee ee ELL celts sera see peste Ls                                        ERE
 O                                        eS                     Sy                          co                                     .                                                es
                                             ing  ,                |                                                              ry                                                    =       .       =
 e                                        ew                   ME |                                                            uu                                                            anes
 -                                         270° |4' 00                 ata      TTT            | I       :                       he                                                                  ‘ABN 85 114 488 205
                                                               aa           :                                                     s                                                                a        s
                                                                                               7                                                                                     Burch 8 Design Studies FRLALA Reg No 002195
 x                   9                      30.376m                ]                    wna     MH.                                                                     A             P.O.Bax 1382 Noosavite Cid 4568 atk
 n                                                                 |                           UL 34.95                                       (                        *              iG He aren Se ete we =
 2                        Y      &€     &     8       ¥        ae                                                             8                 -                                    Cet
 <                        .                                                           ALLAMBI           RISE                                     be                                  Ct RKimberey
                                                                                                                                                          is                         Proposed Alterations &
  4                                                                                                                      AAU ES.                             PFs       *                itions to Existing House
 Oo                                                                                                               eo                          fast,                      es          19 Allambi Rise
 03                                                                                                            —                                                                     Noosa Heads
 ©                                                                                                                                                                                   DEVELOPED DESIGN
  Zz                                                                                                                                                                                 Site Plan
                                                                                                                                                                                   ‘oe due       can
 za                                                                                                                                                                                  1:200 . June 2014 BM .
 S                                                                                                                                                                                   413         DD 1.01 Pt
 —
 oa

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 13 of 145

+                                                                                                                                                                                         w
 z                                                                ,                             >                                                                                          <
 a)
                                                                   YD)                           28                                                     LEGEND                             S
 2                                                                  f            780°      ate     oN                                                   ME New Wall                        °
  E                                                                               Iimber   “Ee A aa)    Wea      + ee ek                                == _Exsting Wall / Structure       o
 :                                                                                        Le                               c                                                               :
 ~                                                                                 Sceen [ |) 9                     = = -                                  Ensting to be removed           a
  2                                                                                              |                                                                                         c
 ©                                                                             o          (~Ee
 el                                                                                       |  =a
                                             Ce                                                  C1           =
                                        ay                      e          —_———_—_____   EEE
 <                                                                                                                   era
 Q                                                8                          :                                           I
 a                                                ‘|                         :                 |=             yl          "
                                                               Exsting      rf                       Returbish }           :
  xt                                                           Deck       CF                          Exsting  |        C
 2                                           (o                 .            |                                             l
 =                                           (B 4--+—--*—+ 1                     f—-——-—}       a -—-                     ry
tH                                                                                Existing Pool         Exsting            |                                         N
 =                                                                        _]      Structure             Undercroft         |
 Ww                                                             .
 Lu                                               8                                                           a          cy
 E                                                ©               a Pn                                                     |                           0   1   2   3m
 —                                                                                                                         |                           Seale 1: 100 @A3
 =                                     G                         ©                                                                                    oi oui
 8                                     RB                                                                                  |                         eee
                                                                                                                                                       1
                                             (Gy                    ]     .      e      —                              i}                            eet
 S                                                                                                                                                    Tim Ditchfield
 Y                                                                          @                                                                        “ah         architects
 -                                                                                  ly     \ |                                                                        116
 <                                                S                                 Heme |}                 O              |                          cemeeees ite
                                                                                       7 ctura                             1                         Emat tmgiderccom au -_ =
 S                                                                                  .                                      |                         oe
 <x                                                                                                                                                  SOR Kietariey
 °                                           { D }~                   t             ES           4;                        :  ,                      hddlons to Bxstng House
 O                                                                                    \          }                                                   49 Allambi Rise
og          |                                                     Site Bound           \ \     L                                                     Noosa Heads
 oO          -                                                                          :                                                           DEVELOPED DESIGN
 2                                                                                                                                                   Undercroft Floor Plan
 Z                                                                                                                                                    1:100 Aug 2014 BM
 z                                                                                                               ALLAMBI        RISE                 4413      DD 2.04P1
 3                                                                                                               Access Dnveway                      -rnrnrrrr
 a

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 14 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA            16 September 2014

                             ate
          i                  ae                                       FAY,
                                                                     |
                      |
                        1e)                                 ©     3  g
         f                                                  a
 &                        ee              We           toes          ez
  IF           Le es   doa || el 3 % V2  li      Ll ‘S.  Ja  gE
  iz           Te ee
   a
   m

    52308 BF SSE Sse Oe 2es Agee: ope
    "?       ie i      Sle     i                                   Wk
      lea ES 32 eli       Hite -                                  pee B
      * Ee Pepeyal     Qi ile: sh.                               peig
    gee 83    5    88E oO ih j :                                  sg
    ei       oP   imi Ble        *    =                           |
    :             at ite ll                                       ii

                                                                Page 14 of 145

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 15 of 145

s                                                                                                                                                                                                   2
 o                                                                   iL    Ba.        o            |                                                                                                 =
 N                                                                            |
 -                                                                                                  ‘                                                           LEGEND                               So
 gs                                                                                                 4       A                                                   ME New Wall                          9
 e                                                                                                   3      i                   ,                               == Exsting Wall / Structure          oO
 &                                                                                       =        “   he     :    1    ; x {                                       Ensting to be removed             >
 o                                                                                                 Te          a                                                                                     oO.
 a                                                                                     See ee ae
 o                                                                                    |. Stack fway ce,  a            Se
 a                                                                                      ——   eS eases:
                                                                                       Doors   {iit   ding | —         ,     ;
                                               (A \—-           ww                     oe     |   aa    =          |    _ a
                                                                                           Fe           yd}            *;
                                                                                                        lm     gt        col
                                        (A                                             aul st                           ese ||
 <                                         =                        ea                 pane tg                 |      a
 oS                                                  3                                  a     ti      | sa
 a                                                   .                                     rt                        Tee        Te
 2                                                                                      sil “Tt      qr               ;  | we |
 ©                                                                         _                  Hsing     oR       Ly    | eo      |
 Z                                             C J                      a                                     oy                 f
 =                                             {                            : :  * Pigs. a          , z     i   -                 a
 z                                                           ee                              |                                      |
 Ww                  &                               .                          Deck =         al.      ey                    =
Lu                                                                  é           ia      ce             Ree          P|     be ||                               o   1   #2  3m
 E                                                                     Lo) fe                           fe                  coe                                baebaodae)
 s                                                                           (|                |   ;  TT                                                       Seale 1: 100 @A3
 Ss                                     (3B                                                    fl   ot Nes RRR RREN     wiky                                 __P1__ 01/08/14 For Protiminary BA
 Oo                                      3.02)                                                  1.    OR          Te        —                                eS
                                               /                                               ay Entry FT ta         |        -      7                      waseinenty py rode ted se win pemeeao
 Oo                                            6                                             Cee                   =           ine                                          ee
 S                                                                 %                           PN                   eentecetthl                               Tim Ditchfield
 O                                                                                                                   =           TH                           *af—       architects
 E                                                                                                          ‘      ©             |  ! 2                      BArch B Design Studies FRALA ear Aire}
                                                      T                                                   -                                                   P.O.Box 1382 Oo
 a                                                   F                                         ;                  at                                          Sieger Wa
                                                                                                                     soot piabe     !                        Project
 °                                             {D }-                                                      —          ee                                      ha Mone to Eaeing House
 O°                                                                                                      1   aa             .       a                        a      ab
                                                                                                          ,       ;     ‘    eS       |                      19 Allambi Rise
 03          ;                                                        Site Boundary                       eae                                                —
                                                                                                                                                             DEVELOPED DESIGN
 9                                                                                              4                              a                             Upper Ground Floor Plan
                                                                                                                                                             ae oe     can
 5                                                                                              |  ore                                                       4100 Aug2014 BM
 2                                                                                                 come  G0)           ALLAMBI         RISE                  i413      DD 201 Pt
                                                                                                   ie                 Access Dnveway.                                             as
 _                                                                                                                     bitumen
 a

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 16 of 145

ba                                                                                                                                                                                                                                 re)
 S                                                                                                                                                                                                                                 s
 N                                                                             ug!                         e                    >                    3         |                        LEGEND                                     So
                                                                                    ome
                                                                                    |      |                                                       {       é
  gs                                                                                                                        pos    6570°             }          R          |            mmm New Wail                              oe
  €                                                                               » |                                 __|                            .                                  == Exsting Wall / Structure                o
 L                                                                                                                                                                                           Ensting to be removed                 a
  a.                                                                                                                                                                                                                                J
  o                                                                                                                                                                                     TL   Towel Ladder                          a
 n
 ©                                                                                                                                                                         |
 ei
                                                        A         -         BH                                                                             _

 <x                                             $0                                                                                                        Setbaq      \3.01/
 Q                                                           t                Deck
 za                                                          :               below                                                                               Existing Roof
 0                                                                                                                                                                Height ¢ Profle
                                                                                                                                                              a         ne
 <                                                                                                                                                            J |
                                                                                  }                                                                               Unchan.
 2                                                      B     |                                                                                               2   Sonor
 Ww                                                           |
Li)                                                                                                                                                                                                     N
  i                                                              Y                                                                                                                                    O
Lu                                                           E
uu                                                                             é                                                                         2100                          0    1   #2   3m
                                                                                                                                                                                        net ec
 E                                                                                                                         =        ——               =   Exot                          Seale 1: 100 @A3
 =                                                                                                             | | eH                    |    “ut                             |
                                                                                                                         UT
 8                                             Re                                                                     oe          ee                                   Be            Soeaenmenomnae
 z                                                                          i]                                 ee                 Ea                                                  Tim Ditchfield
                                                                             %                                            i   es       +      os                                        .       .       .
 Oo                                                                                                              ee                g        mc §                            |                      architects
 =                                                                                                             )     _ | FFL 37.860         vs       ;
                                                                                                                High ||                NM IR    Ens 1                                                ‘ABN 85 114.488 305
 Ee                                                          >                                                 | 4                 |   Sp oe                                         BArch 8 Design Studies FRALA Reg Mo 002195
 <                                                           S                                                BT                     Ps Owl                                           oe
 Yn)                                                         |                                                Ml)   site     2   | | Me   Ts     ty      A       a                   Enel tneieecoaunt  = =
 z                                                                                                                              r                     eran               \          C&R Kimberley
                                                                                                                                                                                     Project
 O                                                     On  \&                                                                                                             %          Pi      Alterations &
 0                                                     (D                                                  :                                                    Parapet & ;         Addons to Existing House
 Oo                                                                                                                                                               ad                 19 Allambi Rise
 03            ;                                                                Site Boundary             \    L                                                .        x\          =
                                                                                                               T                                               :                     DEVELOPED DESIGN
 9                                                                                                                                                                           \      First Floor Plan
                                                                                                               ,                                                                      se oe     cam
 2                                                                                                                                                                                   4100 Aug 2014 6M
 é                                                                                                                       6)              ALLAMBI           RISE                      1413         DD 2.021
                                                                                                                                         Access Drveway                                                       ew
 _l
 a

Section 17

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 17 of 145

st                               f       /       | oli                        B®   0          |     y    wf                                     S
                                                                                                                                                 Lo
                                                                                                                                                 x
 5                               /       /       /  :                    oe          :      :  f       ~                                         oa
                                                       a            ES                     /   r                     FARO, Sick hel st fight
                                                                                  >           Toe               29    LEGEND                     S
 ®                              /       /       /    pf                           ,               ,          |
 z                              Pritt                                                                        |
 2                             /       fl    in                                                                 ab
 s                            /       /     | j                                                    ;
 _                       ad        Al Wie                                                          Root |  “X30
                        2     /     _           o%                                                 Exsting (KY
                          [OT                                                                          see
                          a                                                                              a
 4                                     PA                                                            i          2
 a                        /       /         |     / ||   re                                          :
 Wi                     /         /       /      |                                                 Se                           N
 oO                   /        /   /(B ya}                                                                    |
 e                   /        LT)                                                                  sn                ei    ei
tH                 g         /      /    » |       4                                              Eeotng        o>?  Seale 1: 100@A3
 =                 /        /          i          4                                                    |            A
ui                /        /       /                                                               ay              SS
 f               SPITE       SL         am                                                                 =       ga
 E                      it    Sex                                                            |                      Tim pas
 =            /        /     Da \ ¢ /                                                                         |     Nie Sei Wi ERK a
 °                    j       Pl   hy           iG                                                                  es fae
 Zz            o            /          %                              |                                Setback     Een Kitedey .
 2                i        /       /   5                                                                   3 :     Addons to Existing House
 a               /        /      jf       /                                                            “ar   |     tec als
 z              /       /       /  ADT /          / i                                                          |   DEVELOPED DESIGN
 e             /       /       /        /          Site Bound       —=                    Top of Parapet Wall  \     a= OS
 :        i        |     Vv  A    & fg    v   gs       Pie         © |                  ALLAMBI    RISE                   ors
 g          Vans /                P          /        /                I      @)
 2                              //l         /        /                 {                   3500 ee                  ein:    —    1
 2                         /        /       ;
 s
 a

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 18 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        16 September 2014

                                               aa      ae       2
                                               28      2s       g
                                                        i
                                                                5900
                                                               Approx.
                                                            =     4             /
                                                       +t,          —_         /
                                             A eae     |  2750            He    FZ)
                                                nN                    600 550 /
                                                at   f                     2.
                                                i |  .
                                                i                _2100
                                                 8     ‘|, 2300 s—        i
                                                       ||
                                                1 /             S        '
                                              1                 | a HE           o)
                                                Hl =                    if
                                                Poa                    r/
                                               ET         |             ze
                                        peo   /}                      Qs F
                             o        x       We       | g            "at
                             g               /  =F                   Fl
                             Ss          a                          /
                              oO       .  i                al       f     g     (oo)
                              ;          ‘ PT          |           /      é
                             O            ;  |                    /       ;
                                                t  '                      8
                                         /      eo i _-
                                                 Baisting Bosting
                                                1
                                       ide      —
                                    a                                            >)
                                     i                     > am    Q) See
                                         go      2    II) E a 4       z¢28
                                                 :      Eee":
                                    he  sees lil       Peyton         |
                                  eee
                                                        | \ Dioe   to
                                       »     5          We    -
                                               gt       ly
                                 }.       Ie       *    | lag  1
                                 pea     es e:      A   | jes
                                |        ae       edi
                                3 e       ee                 Boundary
                                ge        AS
                                s         SUD    ods    |
                              lag        pass           |
    Ba    HERE SERIES izes  AES       ope
    SEAT                    ST                                                   Wt §
      Gioo ge 32 3 |teed       Hii?   -|-                                      ooz ®
       2/8 Se oF PTE        Oly:      3                                        38 2
          g   8 Feo |'se: sel lee Sh.                                          ga¢5
    giz] 2      3s  | ast oS Ht                                                s = *
    w8    z      ge       os H+         wo                                     e =
    3           eM Slee                 3                                      33
    :                 bee O/T                                                  if
                      Wt seca] et                                                3

                                                                             Page 18 of 145

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 19 of 145

=                                                                                                                                                                                                                 Lo
  oO                                                         ae?             Kg        y                                                                                                                            +
  N                                                           Ne          m~    \       pp TP                                                                                                                       _
                                      &                      ot iF   por  PR     ae  y, beg                                                                                                                         5
  oO                                  Sie                 aT          ey          A     PL
  =                                Pate     ah           ”   SRV        oe   ek, iy,        al         ;                            _                                                                               o
  :                            ree                   ae             ee             ae                                                                                                                                2
                                se  > ates , Wi  ey,           i!       -    oy      r                                                 }
  =                                   ah)    = am,   i    pS     us    Pay 45 Fix                                                                                                                                    om
   oO                                 oe y       ae   Tk    Thy  Tied    a      ‘4  OR ae     on. 7.    ee Level              a Caen                                                                                 eo
  ”                        ae   aS     RRS        aa           } m eG “aes     4  en Fi     «Buk         '                      ons
  ©                       THR,     AP   Weawk      TN         Ta Te ai Sil Pete ti a
  a                           ‘3        A POUT ce PO ee       we   WOR   ROS  RTE   CSE         oe                     Er                         a
                         “ te BLN    fi ¥: *      “«-    cx   hi, fed    >  y         an         S|           ES      — |        =      =        Drivewey
                          e           2»    i      Yh   ny ROR.   Wi Bitar       i Ny                                                             Access
                                G    J oh kee CaS a ba RO  ant maa                ‘A  wy ARS                                                      eseiactl
                              C'S» ae atte       9                 re ees      é     an                                                            "
                              mote Oe Rebee Je.                   a             S    ”                                                                   5
                                Petes A       oot               5                              1                                                      8
                  FFL 37.060_ Jor Sg Sa RR nl RO  Heng          s          his             :                                                 e|      op B Ee
  5                                 pad ee                                                       man                                         lr
 fa)                            a      SacI Pa                                                         7                                    3     gi      3
  S                            Fi    a ety)                                              |                                                        3%
  Ww                          het &  a van Mere      i.)           I hi                                                                             é
  ©               FFL 35,460  aime foe Pe                  Pon    Ve                                                                                 .
  <x              ‘FFL 36.50090° eRe oR Real Dae SE    aE      “Tl           Sts                   ’            ;                                ~           =====
                              eS     cad     H   >    ‘    '                 >      “|             f   :                            ’               $
  =                          Ae its at     me ’        o      Til]  )               4                  Timber Screen
 Lu              FFL 92.690 _ "|           eee —            Il LE                 iP oy — — | — eas
  Ww              FFL 32.680 e :  aos me   FP, : mr ;         ae                     RON            ——> Extn Gate                   ;
  =                      it  Rae de         ht
                            K  “  4g ie         ,.7 Un.
 Lu                        *   Ee A Vy Le $                      Us
  E                           Pic sie <4      es         en,                                                                                                                a   a
                                 me Ay         |                  1   ‘
                                nl     ae) 4    .                                                                                                                          a    Oe ee  eel
 Ss                           yy Bay ti    ip        Pet                                                                                                                    Seale 1: 100 @A3
  =                        ya             )  at S22
                          Sea              Page     7                                                                                                                     et
  O                              . \    z  f   "57                                                                                                                       Ths cwngis etfcto aoyigh end comet be produ
  2                                  Ty                                                          South Elevati                                                            =
  z                                 H/     y                                                       Ou      evation                                                       ST ee
  O                                 "1                                                                                                                                    Tim Ditchfield
  -                                                                                                                                                                       we ecenas rae
  =                                 DAs                                                                                                                                               architects
                                                                                                                                                                          P.O.Box 1382 Noosavile Cid 4506
ct                                 ¢                                                                                                                                      PT 58480 Fe 68 4818 wat
  x                                                                                                                                                                     C&R Kimberley
  4                                                                                                                                                                     Proposed Alterations &
  aw                                                                                                                                                                        itions to Existing House
  °                                                                                                                                                                       19 Allambi Rise
 og                                                                                                                                                                      Noosa Heads
  O                                                                                                                                                                       DEVELOPED DESIGN
  z                                                                                                                                                                      South Elevation
  Zz                                                                                                                                                                         ae
  a                                                                                                                                                                       1:100 Aug 2014 6M
  Zz                                                                                                                                                                     Proj no.    Dwg no.
  =                                                                                                                                                                       1413       DD 4.01 P1
 _l                                                                                                                                                                      _
  a

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 20 of 145

=
 o                  ORT,  p      TR          CORE      Lee CR                                                                                                                                          S
 N               SM  ao) por    VE tien     Pn Seah      aC 5       TRE                          Spy                                                              LEGEND                              5
  a                  a os         inne ll       a oat]  PEN   eB                           a     ei
 2               ie  1 eth    gp     ye  ae     a pal      > Be aa") aa .* oe        z  is is POAT: ey   4    -                                                      Rendered Block                    So
  €                  A:        BP  aor             Bg Vins item        ‘Sith,        fa     a     Vane | Atte                                                        ine Clack                         N
                  Toa  Aaa 20        me     Ge  RE AN       veh.      We            ¥        ;  q                 Ce      “a                                      [7] Zine Cladding                    o
  o                Be fe.          ae               dod     rey          ‘         erat   oN,         ee         RNR    ath oe         >                             Standing Seam Joints              D
  oO             ye cathy. Ky eae Sy 3 Pee        <te     Ke Se    i         3     oe \| ; co      y    ue    ™  we \| 2 in?  x Se  Rw ee                         [TB] Timber Boards                   o.
                 om   Tae       ee iG    ra    a A he Sats     on]  -           m      itpomeren t7  *      eager Oat    >       IK  ata
 “                   mae        nt [aa         RE              NN TD     “2    TR       i           ae a       SE                                                 [FB] Plasterboard
 ©                           ali    oe Mg     RS                        re,      Pm CU  Rio        GRO   OR      Oe aA         “a      2
 a               ERE             ppg                    Tl As a                                                        a       eee                                ~
                    re            SW, - r                                   re 78 ; ria     Sen aa.     ~~      Piha Wa    f    S ere   a . ‘oak,
                w    (eee? (ari                                      wo Ee                                                       a
                 —  fe          z                                                                     :     ~o™     ay      3 Me            >    on
                                :                                                    a                            rr    tar woh Sie        eee   — —
 a                              8                                          |                                      ae          ee          rath        Heagit Unt
 <=                  |                                                                                                           ta                      ~~
 0               FFL 85.460                                                                                                   nH
                ‘FFL 35.300 —      2                                                                                            ne                a so oe a oe
 <                                                                                                  ee                                 *
                                        ;                                 i                                                         a     Ty
 g                                  a                                          4                                                    \ 4
 F                                        |                                                                                         7
iv              FFL 32.830                 IRIE R RS                                                                               él
 ul              FFL ae                      RRS        a oe                                                                            aa rite
 =                                                                                   PA                                             ¥
 Ww
 im)                                                                                                        <=
 E                                                                         Zine Cladding.                     Poe               <i                              0   1    2   3m
 S                                                                        Une of Exsting —                             t            s                            Seale 1: 100 @A3
                                                                          Driveway                                .
 =                                                                                                         rene                                                ——————
 Oo                                                                                                        See atta                                           ‘Taeetgtebcvarinsentnepaarh
 O                                                                                                                                                          pL        paeataeaataees riemaalal
                                                                            East Elevation                                                                     arta PAL
 z2                                                                                                                                                            Tim Ditchfield
 o                                                                                                                                                             “a ~— architects
 -                                                                                                                                                             Burch B Design Studies FRLALA mnogo 88
 o                                                                                                                                                             meucemecses Sat
 z                                                                                                                                                           C&R Kimber
                                                                                                                                                              P.     Alterations &
 o                                                                                                                                                         Aas a             use
 Oo                                                                                                                                                            19 Allambi Rise
og                                                                                                                                                            Noosa Heads
                                                                                                                                                               DEVELOPED DESIGN
  oO
 zs                                                                                                                                                           East Elevation
                                                                                                                                                              = oe      can
 za                                                                                                                                                            bol Aug2014 BM im
 é                                                                                                                                                            4413       Db 4.02 P1
 =!
 ou

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 21 of 145

a                                                                                                                                                                                                                 L9
 S                                                    os               ene              eae     se, A          AI                    _
 N                                                  a   iy          Pod aye    Pg 7 ad iy se        =>  fae         =    “3 e =     ae                    ig  J                                                    5
 2                                                 ae           RR Poa         ite      ‘ak              Bra cs                  oven.      os     ieee SRTA A                                                     NI
 5                                                 «            A a               :         F      ee        Re           Pea,    Re fore ee rs     ag aR toe     ME
 2                                                        CF  ee ae) ae                     RE SR                    Gen    oO  ool Ee Vi                         inal                                             %
 S                                                         ORE      WW     eee 2 Y(t     b     Pepe    te      a   att:    KY    cele soda     ae      U4                                                          2
 @                                                     dibeengier 2 = ae       Satie        Dies oe Sain       a aa            HORT          na           aed     a>                                               oa
 ©                                                                    te ae               i ie               fe           oe    es   haa         th      ma      sa
                                                                       os        ae.   Peake 10 oy. §   MBP 547      AT a         5   Nig   = .                  Ni a
 =                                                                                                   »)     Ape  it ee        SSE                waa aT       Dr ie
                                                           =                      oa                    age               NRE           eR
                                                           ———           “e    | 74 P    ’                he Nt    yrngs aes    eT ae       Le     eh      me    -
                                           Hest Lt         ==          Po ee        aN              |          i   ea   SP    a               Mipsis
                                           N.G.L. +8000                       Ue       =                 A    th      Ae SN        r    hh     » ~ an  ait  owe   Ad
                 FFL 37.860              DLs Ouiding face >|             4              ro            eo           re    A  iter    ines ONE      OM oa aE
 Zz                                           See          -          tok |            PAN ee                    &         SR       ee             Se          cS
 oO               I          an)                           Be     <geey a              mc           URSA            ilar  Rita Nc                  i
 Ww                                          Access       | — |   Sea                  mT ie        Ee            5         bs Feng       PAYS    : mY a         RS
 x               "FFL 35.390              "5 nnn        ?     _         }               (f                 aan       tan    >    ry    Toes     x aa i        TP)    Ke
 0                                                            =          =    ‘         i                       OR    at      #, Bas. Me: RN                EC AN  rife
                                                                a          ,     See et eee                    ‘ae     oe       "     *      ony   Cs    ib       eee’,
 ke                                                     y    fey       {                                       wa    i   t ‘SE Ry PSB          rere         red Ae Pe
Lu               FEL 92,800                             f     -                         P                         ll hi r Dares fh Tes          oe aN Se Rr Yee 5
 Ww               FFL 32.680                            ‘      P|                       i              Pere re   eee                        uh   2k \     Pe had   *
 :                                                      be                                                     tn
                                                                                        »                       a          ey,          ye 6 ab a Pa ‘     4  er, ss ae
 Ww                                                     7              )                                            a           NS YY mst? r     oF    )       ie     3
                                                        =      :                                                        =       ra   aad Age ‘a Te, , i ry    Tt          0   1   z.   3m
                                                         a                                                oy)              |    |         =      ee Ue       y    a
 =                                                        a)                                           = /|                               P     Rely           Ail 8'g    Seale 1: 100@A3
 =                                                -      . K     {     :                                     y   Existing f                 \ eo i | Py  =   y awry
 =                                                ~              ;             :                               )  Decking «|    !           }        j       \           Pt 01/08/16 For pretinimary BA
 Oo                                                          Fevenied Groved Line ,        ee                 7  See            |          (                   |           er eee ep memes
 O                                                          at Site Boundary                                   :      wre 1                   Existing         )        dechorhatoy by nedunuhou be we poms
 >                                                                             North Elevation                                             EE                           =
 3                                                                                                            :          )                                    |          Tim Ditchfield
 O                                                                                                            y           ;                 h        L                   taj         architects
 -                                                                                                                                                            (                        (ABN 85 116 488 305
 x                                                                                                                                          |        }        fy        Ree tte Se      Reg No 002195
wn                                                                                                                                                            1         rors    sc oa wat
                                                                                                                            2              I         4                  =
 z                                                                                                                         :                       )           |       C&R Kimberley
 oO                                                                                                                             RRP                           "         pee
 0                                                                                                                               ~                             |        Kalitons toxin
 Oo                                                                                                                                                            |         49 Allambi Rise
 8                                                                                                                                        f                             oi
 ©                                                                                                                                                                       DEVELOPED DESIGN
 2                                                                                                                                                 p                    North Elevation
 =                                                                                                                                                                     ‘ae due     cam
 za                                                                                                                                                      >              1100 Aug 2014 6M
 Zz                                                                                                                                                                     Proj no.   Dwg no.
 =                                                                                                                                                                      1413        DD 4.03 P1
 —
 oa

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 22 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                16 September 2014

                                    a3     a3      3           ,
                                    gs     Be      g       ;
                     \              ge     OB      BS   Kee
                            bs          RS       os _ > AR: re” 24 Ui
                                 pS a               Pak Spot
                                       Nee            OE TE.  Ogee
                        re a
                                          .  G3         2, aes FO SoS.
                                            ag Nase  a      ayy
                                     Sn 6           Fs   Ua? Ba
                                     ZN       <=     M      "Vaal ashe
                                     ;     yas                    >
                    est 1            =.       ws           at air    z
                   es =                   |       «OO ee
                                     SS ee            g552   eae   ah
                           Lbs       a                  &   Sees s
                                     ee ee =            we   tO
                    2                = =
                    ”       ia       = _—              ei      ay,
                    2            te                       2,      ae
                    a                 a        |          mF Ve     5 ays 3%
                                      al             Saat     oa, ee ee
                    3                a               2M         eZ      ES
                                 aT = ae ey ; Sa Z os fr ; ay fae,
                                     a ee                ad ee    ai, at See
                                —           ee                  aS   ye. Co
                                     =            i 7a a ae       APR TENS te
                                  |i ie oes ee Sey
                                     ja             ma   . Be 3s  tc : ae : eR
                                     a                     ae 8 pe 2
                                     a:                '       Te. 4 ao
                                      Ee              Fe ;   Wak Ot ae a
                                     = =                      " 4S  }     =
                                     ‘                ras face Wm     Be
                                              SE      Ma Se 28 ial
                                            a= Sate                 ss |
                                            =    Soi ee 3           |   hee
                                         ————a       tel ar Sie  rs as ees
                                                 ae          ree  a3 eT    oe,
                                                \   te  Pe IS        Seer Yh
                                          = Fete”       BA ae a ite Ve
                                                 Ne    "a oe My es =  4  Ead22 .
                                                  Cri: Ma    z sy” NO Ae
    23 26)s09 229 B73 O8| p22 Te
    as HES PE   Reet EEE SET? ep
       eo ge ch 2   (ETS Ue SL
      8 a3 Bn 5> §  ily    Ht    E
      “(Po “@ ge    sitet Slhlar al.
    sie] 2    dg  | EE OGG
    2         e*    A | :3, ij] =  3
    3               me Dl
                    WW gscQy it

                                                                    Page 22 of 145

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                              16 September 2014


2                        APPLICATION FOR MATERIAL CHANGE OF USE ANIMAL HUSBANDRY TYPE 2 -
                         INTENSIVE) AND ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 - POULTRY
                         FARMING) SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD MCU12/0184
DOCUMENT INFORM AT ION




Author                           Development Planner, Jack Lewis
                                 Planning & Infrastructure Department

Index                            ECM / Application / MCU12/0184

Attachments                      1.   Previous Council Reports
                                 2.   Current Proposal Plans
                                 3.   Proposed Haul Route and Vehicle Movements
                                 4.   Odour Contour Modelling
                                 5.   Proposed Upgrading to Top Forestry Road



         APPLICATION DETAILS

         Applicant                          W Donald Milligan Pty Ltd

         Proposal                           Development Permit for Material Change of Use (Animal Husbandry
                                            Type 2 - Intensive) and Environmentally Relevant Activity (ERA 4 -
                                            Poultry Farming)

         Properly Made Date                 12 November 2012

         Information Request Date           10 December 2012

         Information Response Date          8 May 2013

         Number of Submissions              •   12 Properly made submissions;
                                            •   118 Not properly made submissions (received until November
                                                2013); and
                                            •   35 letters and 430 petitioners objecting to the development on
                                                www.change.org (received since the updated information was
                                                received on the 31 July 2013).

         PROPERTY DETAILS

         Property Address                   136 Top Forestry Rd, Ridgewood

         RP Description                     Lot 21 SP 226606

         Land Area                          105.017ha

         Existing Use of Land               Avocado orchard and associated sheds

         STATUTORY DETAILS

         SEQRP Designation                  Regional Landscape and Rural Production

         Locality                           Mary River Catchment

         Zone                               Rural

         Assessment Type                    Impact



                                                                                                    Page 23 of 145

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                16 September 2014


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 16 September 2014 and refuse Application No. MCU12/0208 for a
Development Permit for Material Change of Use (Animal Husbandry Type 2 - Intensive) and
Environmentally Relevant Activity (ERA 4 - Poultry Farming), situated at 136 Top Forestry
Rd, Ridgewood for the following reasons:
1.   The proposed poultry farm does not comply with the Overall Outcomes of The Noosa
     Plan’s Mary River Catchment Locality, Agricultural Uses and Transport, Roads and
     Drainage Codes;
2.   The proposed poultry farm does not achieve sufficient separation distance from
     surrounding residences and properties, so as to avoid adverse odour impacts on
     amenity;
3.   The development will result in unacceptable impacts on Top Forestry Road, as the
     proposed road improvements are not sufficient to provide the necessary safe
     environment and will result in an unacceptable road maintenance burden for Council;
4.   Traffic generated by the development will have significant adverse impacts on the
     amenity of residents living along the haul route, as Top Forestry Road is unsealed, the
     route traverses Cooroy’s residential streets and bird collection commences at 2:30am;
     and
5.   The proposed sheds and earthworks necessary for shed construction are likely to
     adversely impact on the scenic amenity of the area, as the applicant has not
     demonstrated that they will integrate satisfactorily with the landform and landscape.


REPORT
1.   BACKGROUND
The development application was first reported to the Sunshine Coast Council on the 14
November 2013, wherein Council decided to defer consideration to the next Council meeting
and request the applicant to provide the following additional information:

1.   Total vehicle trips including details of size of vehicles, purpose of trip, time of trip and
     number of trips per day;
2.   Feasibility of requirements to provide seal to 50m in front of affected properties on Top
     Forestry Road or to enter into an infrastructure agreement with Council;
3.   Composting and stockpiling methodology including data on management of emissions
     during these processes;
4.   Water quality management particularly addressing potential impacts from use of shed
     waste and composting material for fertilising the orchard and any associated run off;
     and
5.   Feasibility on reduction of size and numbers of sheds.

A supplementary report was then provided to the Sunshine Coast Council’s Ordinary
Meeting of the 12 December 2013, wherein it was decided to defer the application for the
new Noosa Council consideration to allow:

a)   The applicant time to submit their proposed infrastructure agreement and for the
     matter to be negotiated; and
b)   Additional odour modelling to be undertaken to address the missed receptors and the
     spreading of poultry manure in combination with the sheds and manure stockpiles.

Copies of the previous Council reports are included as Attachment 1.


                                                                                     Page 24 of 145

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            16 September 2014


On the 13 February 2014, officers met with the applicant and consultants to discuss the
additional information requirements. The applicant advised it would engage a new traffic
engineer and investigate the possibility of upgrading sections of Top Forestry Road and
review the potential odour impacts. It was agreed that a period of 3 months was sufficient to
provide the response.

A draft infrastructure agreement template was given to the applicant in November 2013 and
again in June 2014.

The applicant did not provide any additional information within the agreed three months,
indicating a number of times that officers could expect to receive the information ‘shortly’.
The applicant was subsequently given a deadline of 31 July 2014. The revised information
was received on this date and included an updated ‘Noise and Air Quality Impact
Assessment’ prepared by MWA Environmental and a ‘Traffic Engineering Report’ prepared
by Lambert & Rehbein. No infrastructure agreement was received as part of the response.
The following further assessment is predominantly based on the information within these
reports.

2.   PROPOSAL
The application seeks approval for a Material Change of Use for Animal Husbandry Type 2 –
Intensive (Poultry Farm) and Environmentally Relevant Activity (ERA 4 - Poultry Farming),
situated at 136 Top Forestry Rd, Ridgewood. The closest residences to the subject site are
identified on the locality plan below.




                                                                                 Page 25 of 145

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014


The current proposal involves the construction of 8 x 100m to 130m long x 16m wide sheds
along the ridgeline of the site, with each shed containing 26,800 to 34,840 chickens. On this
basis, the site has the potential to carry in the order of 230,000 birds at any one time (this
equates to a stocking density of 16.75 birds/m2, with a maximum target mass density of
32kg/m2). The applicant indicates the process involves rearing day old chicks to chickens for
a period of 6-9 weeks, before being removed from the site for chicken meat production
(batch cycle). There are approximately 5.8 batch cycles per year. It is proposed to construct
the poultry growing sheds in two stages (stage 1 – Sheds 1 to 5; and stage 2 – Sheds 6 to
8). The current proposal plan is included as Attachment 2.

Deliveries of wood shavings, feed delivery, live bird pick up and removal of litter is carried
out throughout the batch cycle by Articulated Vehicles (AVs). The collection of live birds
occurs between weeks 5 – 8 and commences in the early hours of the morning (from
2:30am), when the birds are calm. A breakdown of the proposed vehicle movements per
batch cycle is included as Attachment 3.

Composting, stockpiling and spreading of poultry manure generated by the poultry sheds is
no longer proposed on site. An updated traffic assessment and odour, dust and noise
modelling of the development have been undertaken by the applicant’s consultants. The
likely odour impacts have been mapped and are included as Attachment 4.

3.    ASSESSMENT
The subject site is located in the Mary River Catchment locality and is zoned Rural. The
proposed use is identified as consistent within the zone and is required to follow an impact
assessable application process and must demonstrate that the selected site is suitable, and
the potential impacts can be appropriately managed. The pertinent issues arising out of the
assessment are discussed in terms of their relevant topic below.
Traffic

The applicant has provided a detailed breakdown of the proposed traffic movements
associated with the existing avocado orcharding and the proposed poultry farm. The
applicant describes that vehicle movements associated with the avocado orchard range from
2 to 14 movements per day, with a Large Rigid Vehicle operating every 4 days, during the 73
day picking season. The traffic movements associated with the poultry farm is described as
involving complex logistics to suit the requirements of Inghams, with little flexibility in the 63
day batch cycles. The applicant’s traffic numbers have been estimated with the assistance of
an experienced poultry grower and key contract managers for Inghams and are considered
to be a reasonably accurate representation of proposed traffic movements.

The most notable traffic impacts are associated with the poultry pick-up, which occur during
weeks 5-8 over 5 days, when Heavy Vehicles arrive and pick up the birds in the early
morning (from 2:30am). During these periods, the maximum number of Heavy Vehicle
movements per day is forecasted to be 26. The loading process takes in the order of 60
minutes per truck and is expected to occur over a 10 hour period. There are a total of 9 days
within the 63 day cycle, when Heavy Vehicle traffic volumes exceeds 10 movements
(average of 1 day per week). The total vehicles associated with the development for each
day of the batch cycle is demonstrated in the graph below.




                                                                                      Page 26 of 145

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             16 September 2014




To address road safety, the applicant proposes to upgrade sections of Top Forestry Road.
The applicant’s engineer provides two options for improving the road, with both involving
localised widening (5.5m carriageway) and improvements to the critical bends. Neither
option includes sealing the road. Option 1 involves significant slope and embankment
stability works allowing a heavy vehicle and car to pass each other on the critical bend; and
Option 2 involves installing a one way system at the critical bend (see Attachment 5).

Council engaged a traffic engineer (Beard Traffic Engineering) to review the report. Council’s
consultant advises that Top Forestry Road cannot satisfactorily be used by the proposed
heavy vehicles without significant upgrading or some way to ensure compliance with a traffic
management plan, which effectively restricts usage of the road to only one heavy vehicle at
a time and with restricted operating speeds (probably not more than 30 km/hour). The
problem is that there is no real way to enforce compliance with such a traffic management
plan and Council’s traffic engineer discounts option 2 (involving the one way system) for this
reason.

The consultant also advises that any upgrading should take into account the proposal’s use
of relatively large vehicles (19m AVs), the critical bends and the relatively steep terrain.
Taking account of these factors, Council’s traffic engineer recommends that as part of the
development, upgrading should be carried out to Top Forestry Road with a basic
carriageway of 6m and 7m on the critical bends, fix the crossfalls, and installation of guide
posts and speed signage. These proposed safety upgrades are fairly similar to the
applicant’s first option, which proposes a 5.5m carriageway and 8m on the critical bends.

The Eastern Downs Regional Roads Group Configuration Standard from which the 6m
carriageway widths have been adopted, suggest that for traffic volumes over 100 vehicles
per day and/or has >20% heavy vehicle use, the road should be sealed. While the standard
adopted by the applicant’s consultant for a 5.5m carriageway is from the Unsealed Roads
Manual (Australian Roads Research Board), which requires an all-weather two-lane road
formed and gravelled, or single-lane sealed road with gravel shoulders.

The above standards only address the safety of the road and do not address the amenity
(dust) impacts and maintenance requirements.




                                                                                  Page 27 of 145

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


With regard to dust nuisance, the applicant’s environmental consultant describes how the
proposal will generate on average an additional 4 vehicles per day, with the chicken pick-up
days generating 26 Heavy Vehicles trips, which is more than 25% higher than the average
daily flows on Top Forestry Road. The applicant’s environmental consultant discusses how
this peak only occurs approximately 20 times a year and submits that this is not unusual for
a rural unsealed road, and dust emissions may be minimised by appropriate maintenance of
the road surface (dust suppressant/water truck). The applicant’s proposed road maintenance
to address dust is not a preferred method and is likely to result in significant compliance
issues for Council. Also, dust nuisance is likely to occur more frequently than the applicant
submits as the proposed traffic movements indicate that in any one batch 9 of the 63 days
heavy vehicle movements will exceed 10 in any day. This amounts to 52 times a
year. Given the heavy vehicle movements are reasonably frequent and that the poultry farm
will increase the number of heavy vehicles on the road to more than 20% of the total vehicle
movements on the road, sealing of Top Forestry Road is the preferred method of
addressing the potential dust nuisance and is consistent with the Eastern Downs Standard.

With regard to road maintenance, Council’s Civil Operations Branch Manager notes that if
Top Forestry Road remains unsealed, then there would be increased maintenance costs to
Council for grading & re-sheeting due to gravel loss under traffic. Furthermore, it is expected
that the pavement design on Cooroy Belli Creek and Old Ceylon Roads would not have
allowed for the additional heavy vehicle volumes generated by the proposed development
and therefore Council could expect that the life of the pavement on these roads would be
reduced & hence increase the maintenance cost & bring forward the requirement for full
reconstruction or rehabilitation.

While the applicant has undertaken a more detailed assessment of the road safety impacts,
including recommended upgrading to sections of Top Forestry Road, Council’s traffic
consultant advises the carriageway requires greater widening in places and the works do not
fully address the additional impacts associated with dust nuisance and future maintenance
costs for Council.

Noise

A revised noise assessment has been carried out by the applicant. The assessment
concludes that the noise amenity criteria for the on-site poultry sheds meet the relevant
guidelines and would not impact neighbours amenity. This report has been reviewed by
Council’s consultant (Pacific Environment) who advises the assumptions and modelling of
the proposed on-site noise impacts comply with the relevant standards. However, the
proposal does not fully consider increased traffic noise to surrounding residents living along
the proposed haul route.

The applicant’s reporting does not take into consideration the chicken pick-up days, which
will commence at 2:30am and involve 26 heavy vehicle movements over a 10 hour period.
While these pick-ups are predicted to occur only 5 times during each 63 day cycle, the timing
and frequency of the truck movements during normal sleeping hours represents an
unacceptable noise nuisance for residents living adjacent to the haul route. Residents along
Top Forestry Road, Old Ceylon and Cooroy Belli Creek Road live generally in close
proximity to the road carriageway and are likely to be impacted. The haul route also includes
the residential streets of Maple St and Crystal St. Industrial type traffic during the night
would be an unreasonable imposition on the amenity and expectations of residents living
along these streets.




                                                                                   Page 28 of 145

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             16 September 2014


Odour

The applicant submitted a revised Air Quality Assessment report, prepared by MWA
Environmental for the 8 poultry sheds. The major difference between the original modelling
and the recent work is that the composting, stockpiling and spreading of the poultry manure
is no longer proposed. Pacific Environment reviewed the latest report on behalf of Council
and advises that the modelling has been carried out in line with good practice. The resultant
modelling, therefore, provides an indication as to the potential odour impacts associated with
the farm.

The Queensland odour guideline for rural zoned land indicates ‘sensitive receptors’ should
not be exposed to more than 2.5 odour units = C99.5 1hr. Notably, even if the applicant was to
meet this guideline, the odour concentration levels would be noticeable for nearby residents
(with the smell considered “distinct” for at least 44 hours/year).

The Department of Environment and Heritage Protection’s - Guideline for Odour Impact
Assessments defines a ‘Sensitive Receptor’ as a dwelling… and includes the curtilage of
such any place and any place known or likely to become a sensitive place in the future. The
applicant’s odour contour modelling does not include 5 ‘sensitive receptor’ locations
surrounding the proposed sheds that would be within the 2.5 odour unit contour. A map of
the missed ‘Sensitive Receptors’ is provided below.




As discussed within previous reports, the applicant acknowledges that several properties
they own are adversely impacted by the odour associated with the development. To address
the issue, the applicant previously proposed the inclusion of the following condition:




                                                                                  Page 29 of 145

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   16 September 2014


The poultry farm can only operate as long as Lots 20 & 22 on SP 226606, Lot 1 on SP
100788 and Lot 204 on RP892484 are owned and occupied by the operator or an employee
of the poultry farm. In the event that the lands are not owned and occupied by the operator,
an employee of the poultry farm, the farm can only operate when the odour limits are below
2.5 odour units.
Council’s solicitor advises that this would be an inappropriate condition to address the
potential odour nuisance for these lots and that it is likely to be shown to be unlawful and not
enforceable. The applicant could alternatively change the application and include properties,
224, 172, 146, 124 and the subject site in the application. Under the Sustainable Planning
Act 2009, a changed application involving new properties would need to be renotified. The
applicant has not indicated they are prepared to include these properties as part of the
application. As such there is no way of avoiding unacceptable odour impacts on future
owners/residents of these properties.
The applicant has also not provided detailed modelling of odour impacts to 185 Top Forestry
Road. There is an existing house on this property, and the current owners have lodged a
letter of support for the application. Council’s Environmental Consultant also advises that
more detailed modelling could be undertaken around the house, and if done is more than
likely to result in this sensitive receptor being outside the 2.5 odour unit contour.
4.    PUBLIC NOTIFICATION
The application was publicly notified for 15 business days in May 2013. 12 properly made
submissions and 118 not properly made (late) submissions were received at the time. Of
the 130 total submissions, 101 are objecting and 29 supporting the application.
Since the applicant provided further information about the proposal on the 31 July 2014 a
further 35 letters and 430 petitioners on www.change.org were received. All were objecting
to the application. The following table provides a summary and assessment of the issues
raised in the recent submissions

 Issues                                        Comments
 Odour concerns
 Affect amenity of neighbours.                 The revised odour modelling indicates all but 5
                                               properties will meet the QLD odour guidelines. As a
                                               result, the development has the potential to affect the
                                               amenity of neighbouring properties.
 The existing houses on the subject site and   The neighbouring properties owned by the applicant
 the neighbouring property (146) have not      are not included as part of the subject application.
 been included as sensitive receptors. House   These are considered sensitive receptor locations
 across the road at 185 Top Forestry Road      pursuant to the QLD Odour Guidelines.
 has not been included as a sensitive          185 Top Forestry Road, has also not been included
 receptor. The report does not consider the    as part of the detailed modelling of the odour
 lots at 124, 172 and 224 Top Forestry Road    contours.
 (Lots owned by the applicant with no houses
 developed yet).

 The odour modelling only depicts sensitive    The Queensland odour guideline for rural zoned land
 receptors; however the lower paddocks and     indicates ‘sensitive receptors’ should not be exposed
 dams will be within the 2.5 odour unit.       to more than 2.5 odour units. A sensitive receptor
                                               only refers to the residential dwelling and the
                                               curtilage of such place (land immediately surrounding
                                               the house, excluding open paddocks).

 Assumptions about report                      Council’s environmental consultant has reviewed all
 • Using weather assumptions for               of the assumptions, criteria and meteorological data
    Nambour and Tewantin should not be         built into the odour modelling and consider them to



                                                                                         Page 30 of 145

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      16 September 2014


    used. Rather a site specific analysis       be appropriate for the proposed location of the
    should be used.                             potential odour sources.
• Odour associated with catch out has not
    been considered.
• Meat Guidelines recommend fans are
    located on the end of the sheds furthest
    away from sensitive receptors.
Unable to condition the development not to      The odour report shows that the development will
emit odour beyond property boundary.            emit odour beyond the property boundaries
                                                exceeding the QLD odour guidelines.
Dust concerns
Health concerns about dust from the farm        The proposed dust impact has been appropriately
and effects on neighbouring water tanks.        modelled and meets the recommended standards.
                                                Council’s environmental consultant also considers
                                                the modelling to be consistent with that seen
                                                elsewhere (i.e. the predicted dust levels require a
                                                smaller buffer than that required for odour).
Unable to verify the accuracy of results        The meteorological data built into the dust modelling
because they are not site specific.             is considered appropriate for the proposed location.
Noise Concerns
Noise from the existing avocado orchard has     The noise from the avocado orcharding is an existing
not been considered in the cumulative noise     use on the site and predominantly operates during
levels.                                         day time hours and does not generally coincide with
                                                the poultry farm’s potential noise impacts, which are
                                                at night.
Assumptions about report                        The proposed on-site noise impacts have been
• Location of the background noise logger       appropriately modelled and meet the recommended
    would have been influenced by               standards. The assumptions and criteria are
    surrounding houses.                         considered appropriate and similar to other poultry
• Does not consider fork lifts working from     operations.
    all locations on the sheds.
• Does not consider the noise from the
    feeding systems.
• Does not consider noise from trucks
    associated with litter delivery and clean
    out.
No consideration of the noise of the trucks     The noise of trucks during the early morning pick up
on the road.                                    times has not been modelled. The noise associated
                                                with trucks along the haul route during regular
                                                sleeping hours is likely to adversely impact the
                                                amenity of residences along the haul route.
Traffic concerns
Dust from the trucks using Top Forestry         Agreed.
Road will affect neighbour’s amenity.

Concerns about the safety of the roads.         The applicant has proposed upgrading to Top
                                                Forestry Road to improve the safety of this section,
                                                including, widening, sealing, signposting and
                                                reducing the speed limits. Council’s traffic consultant
                                                considers that some additional widening is required
                                                to address road safety.
Council will have the burden of looking after   The associated traffic impacts of the development
the maintenance of the road.                    would increase the maintenance required on the haul
                                                route.

Feasibility of upgrading the road for one       This is a matter for the applicant.
farm.



                                                                                          Page 31 of 145

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         16 September 2014


Omissions in the traffic report relating to        Council’s traffic specialist indicates that while one
data used and assumptions. While one week          week of data does not provide a true representation
of data is not representative of yearly traffic.   of the seasonal fluctuations, based on the number of
                                                   houses and uses on the road, the survey is fairly
                                                   consistent with vehicle movements on similar roads.
Traffic Upgrading                                  There are a variety of “standards” which have been
• DTMR recommends 8m wide unsealed                 defined at different times by different agencies.
   roads.                                          Normally, the Austroads standards would be easily
• Two B-doubles will not be able to pass           the most reliable, but it is not clear that the published
   each other as part of the proposed works        standards take adequate account of heavy vehicle
   causing a safety issue for other users.         proportions or vehicle operating speeds (or even the
• The option of having a one way section           length of the route). As a result, Council’s traffic
   of Top Forestry Road would make the             engineer has based the assessment of road
   road worse.                                     requirements for the development on the standards
                                                   listed below:
                                                   - 1989 Austroads Rural Road Design Guide;
                                                   - 2003 Austroads Rural Road Design Guide;
                                                   - 2009 ARRB Unsealed Roads Manual;
                                                   - 2009 Austroads Guide to Road Design Part 3;
                                                   - Eastern      Downs       Regional      Roads     Group
                                                      Configuration Standards (current)
No route specified for the waste trucks.           It is anticipated the waste trucks would travel the
                                                   marked haul route to the Bruce Highway.
Vegetation removal along the Top Forestry          Geotechnical testing would be necessary to ensure
Road reserves would destabilise banks and          that the full width of the road formation is capable of
increase dust nuisance.                            carrying the traffic loading and not, for example
                                                   relatively loose fill material that has accumulated
                                                   over time. Confirmation would also be required of
                                                   slope stability on any cut batters. Drainage is also
                                                   typically a critical factor impacting on the risk of
                                                   landslip in mountainous terrain. It is noted that limited
                                                   consideration has been given to this factor. There is
                                                   also a need to consider the warrants for guard rail
                                                   due to height/slope factors and roadside obstacles
                                                   within the road reserve (i.e. trees).
No discussion about the dust issues from           From a safety, maintenance and amenity point of
the 26 truck movement days. Heavy vehicles         view, the proposed development impacts would
cannot be considered the same as an                require Top Forestry Road to be sealed. This would
ordinary vehicle and cause more of a noise,        eliminate the impact of dust nuisance. However,
and dust nuisance.                                 noise impacts associated with heavy vehicles using
                                                   the haul route at night are likely to unreasonably
                                                   affect the amenity of residents on the route.
Other
It is not possible to apply reasonable and         Agree.
relevant conditions to minimise impacts to
neighbours.
Impacts on the waterways.                          The proposal includes concrete shed flooring and
                                                   storm water treatment to hardstand areas. As a
                                                   result, it is unlikely the development will have any
                                                   significant impacts on the quality of the surrounding
                                                   waters.
Reduced house prices and incompatible with         These matters are not planning matters for
Noosa’s Biosphere status.                          assessment.
                                      2
Inhumane development (16.7 birds per m ).          These matters are regulated by the Department of
                                                   Forestry and Fisheries and Biosecurity agencies, and
                                                   not local government.




                                                                                              Page 32 of 145

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      16 September 2014


 Impacts from the farm will affect native fauna   The proposed structures are proposed within the
 (including native birds and koalas), and         middle of an existing avocado orchard. The
 increase in flies and vermin to the area.        Environmentally Relevant Approval would require the
                                                  sheds to be constructed to not cause an increase in
                                                  vermin in the area.
 As provided in the report to Council in Dec      This is a matter for the applicant.
 2014 – Ingham’s and the applicant advise
 that Stage 1 proposal for 5 sheds is not
 economically viable.
 Address on title page of the odour and traffic   The IDAS forms indicate the application is for 136
 reports refers to neighbouring property.         Top Forestry Road.
 Residents along Top Forestry Road advise         The applicant’s consultant advises that he carried out
 that there was a lack of public notification     the public notification for the application in
 signs along Top Forestry Road                    accordance with the Act’s requirements and did
                                                  maintain a sign to this road frontage. A Notice of
                                                  Compliance has also been provided to Council
                                                  pursuant to the Sustainable Planning Act 2009.
5.     CONCLUSION
The report provides an assessment of the most recent information for an application for a
230,000 bird poultry farm at 136 Top Forestry Road, Ridgewood. The decision on this
application was previously deferred to the new Noosa Council, to allow the applicant time to
submit their proposed infrastructure agreement about upgrading Top Forestry Road and
additional odour modelling to be undertaken to address missed receptors.
While the applicant has provided a more accurate representation of anticipated traffic
movements, the frequency of the heavy vehicles associated with the development
(especially around the pickup days) will require significant upgrading to Top Forestry Road.
The proposed upgrading recommended by the applicant does not include sealing of the
road. The sealing of this stretch of road is considered to be warranted so the use does not
cause an unreasonable dust nuisance to neighbours and not result in an increased
maintenance cost to Council.
The updated odour modelling has been changed to only include the impacts of the poultry
sheds, with the manure proposed to be taken off-site. Even though the modelling has been
revised and includes lesser odour impacts, the report still fails to consider 5 ‘sensitive
receptors’ surrounding the site, 4 of which adjoin the farm and are currently owned by the
applicant. These properties are not part of the application and there is no way of avoiding
unacceptable odour impacts on future owners/residents of these properties.
The proposal still does not satisfactorily address all potential impacts of the development
and is likely to affect the lifestyle and amenity of surrounding residents and residents on the
haul route. The application is therefore recommended for refusal.
Departments/Sections Consulted:
                                                  x   Planning & Infrastructure
     Community Services
     Disaster Management & Public Order               Building & Plumbing Services
     Waste & Environmental Health                 x   DA Planning
     Community Facilities                         x   Strategic Land Use Planning
     Cultural Facilities                              Asset Design & Investigations
                                                      Asset Planning
                                                  X   Civil Operations
                                                      Environment
                                                  x
     Executive Office                                 Corporate Services
     Community Engagement                             Finance
     Customer Service                                 ICT
     Executive Support                                Procurement & Fleet
     Governance                                       Property & Facilities
     Human Resources                                  Revenue Services




                                                                                           Page 33 of 145

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 34 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014

                                                                               ATTACHMENT 1
    ORDINARY MEETING AGENDA                                    14 NOVEMBER 2013
    7.2      REGIONAL STRATEGY AND PLANNING
    7.2.1.   DEVELOPMENT APPLICATION FOR ANIMAL HUSBANDRY TYPE 2 INTENSIVE
            (POULTRY FARM) AT 136 TOP FORESTRY ROAD, RIDGEWOOD
    File No:            MCU12/0184
    Author:             Development Planner
                        Regional Strategy & Planning Department
    Attachments:        Att 1 - Site Plan and Elevations. ..........ccscsssesseeeeseeeeeseeseseeeeesees OT
                        Att 2 - Traffic Route..........ccsssseceseseecsssensnsnsnsescerseeeecsnesessenscerscetsteeees DO

    Link to PD Online:
    http://pdonline_sunshinecoast gid_.gov.au/masterview/Modules/Applicationmaster/ default. aspx?paqe=wrapp
    er&key=1246601

                                  APPLICATION DETAILS
                                    W Donald Wigan Pty Lid
     Proposal:                      Development Permit for Matenal Change of Use (Animal
                                    Husbandry Type 2 - Intensive) and Environmentally
                                    Relevant Activity (ERA 4 - Poultry Farming
     Properly Made Date:            21/11/2012
     Information Request Date:      10/12/2012
     Info Response Received Date:
                                    14 Novenber 2073
     Number of Submissions:         12 Properly made submissions; and
                                    118 Not properly made submissions

     PROPERTY DETAILS
    [Divisions
                                    136 Top Forestry Rd, Ridgewood, Cid, 4563
                                    Lot 21 SP 226606
                                    105.017ha
     Existing Use of Land:          Avocado orchard and associated sheds

     STATUTORY DETAILS
     SEQRP Designation:             Regional Landscape and Rural Production
     Planning Scheme:               The Noosa Plan (8 August 2011)
     Planning Locality:             Mary River Catchment
     Planning Zone                 fRural
    [Assessment Type:             [Impacts
    PURPOSE
    The purpose of this report is to seek council's determination of an application for a Development Permit for
    Maternal Change of Use for Animal Husbandry Type 2 — Intensive (Poultry Farm) and Environmentally
    Relevant Activity (ERA 4 - Poultry Farming) at 136 Top Forestry Rd, Ridgewood. The application is before

                                                                                      Page 34 of 145

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 35 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  16 September 2014

                                                                             ATTACHMENT 1
  council as there were 101 submissions objecting to, and 29 submissions supporting, the development
  proposal.
  EXECUTIVE SUMMARY
  This application seeks approval for a Poultry Farm defined by The Noosa Plan as Animal Husbandry Type
  2 — Intensive at 136 Top Forestry Road, Ridgewood. The applicant proposes to construct 8 large sheds
  (100m to 130m long x 16m wide) on the site’s ndgeline to house up to 250,000 birds, with day old chicks
 reared for a period of 6-9 weeks before being transported off site overnight for chicken meat
  production. The sheds are then cleaned out over a 2 week period and spent litter from the sheds is
  stockpiled within 2 bunded areas, before being spread on the avocado tree orchard. The cycle then starts
 again, with up to 6 cycles a year possible.
  The site is zoned Rural under The Noosa Plan and, in this zone, a poultry farm is required to follow an
 impact assessment process. Accordingly, the applicant must demonstrate the selected site is suitable for
 the proposed use, and that the potential impacts can be appropriately managed.
 This report concludes that the site is not suitable and the proposed poultry farm will have unacceptable
  impacts on the traffic safety of Top Forestry Road, and adverse amenity impacts for residents living near
  the farm and on the transport route.
  Top Forestry Road is not of a suitable standard to cater for the number of heavy vehicles expected to be
  generated by the poultry farm, being an unsealed road with a number of tight bends. In any one of the 9
  week batch cycles, the poultry farm is likely to generate approximately 348 heavy vehicle tnps. During
 peak times, the number of truck movements is anticipated to be 92 trips (in and out) a week, with the last
  bird collection potentially being up to 90 truck trips over 1 to 2 nights. These truck numbers would also
 significantly impact on residents living along the traffic route, given bird collection is anticipated to be
  throughout the night and the route travels through Cooroy’s urban residential streets. Dust generated from
  these movements along Top Forestry Road is also likely to cause a nuisance for residents.
  In terms of potential odour impacts, Pacific Environment on behalf of council advise that no data has been
  provided of the emissions from manure stockpiles and manure spreading. Therefore, they are unable to
  support the applicant's submission that the poultry farm complies with the Queensland odour guidelines for
 rural zoned land. Odour modelling also identifies that the closest houses are at nsk of distinct odour
  impacts at times, with the report failing to address one of the closest sensitive receiver locations.
  While a number of submissions were concemed about the proposal’s potential to adversely impact on
  water quality in the Mary River Catchment, council's environmental specialist concludes this is unlikely but,
 were the application to be approved, ongoing monitoring of the waterways would be
  necessary. Notwithstanding this, it should be noted that discussions with the Department of Agriculture,
 Forestry and Fisheries indicates that manure should be composted for a minimum of 12 weeks before use
 on farms and that the proposed application rate is likely to kill the tree crop.
  The application is, therefore, recommended for refusal.
  OFFICER RECOMMENDATION
  That Council REFUSE Application No. MCU12/0184 for a Development Permit for Material Change of
  Use for Animal Husbandry Type 2 — Intensive (Poultry Farm) and Environmentally Relevant Activity
  (ERA 4 - Poultry Farming), situated at 136 Top Forestry Rd, Ridgewood for the following reasons:
  1.    the proposed poultry farm does not comply with the Overall Outcomes of The Noosa Plan's
        Mary River Catchment Locality, Agricultural Uses and Transport, Roads and Drainage Codes
 2.     the proposed poultry farm does not achieve sufficient separation distance from surrounding
        residents so as to avoid adverse odour impacts on residents’ amenity, with insufficient
        details provided on the emissions from manure stockpiles, manure spreading, and for one of
        the closest sensitive receiver locations
 3.     the proposal will have unacceptable impacts on the safety of Top Forestry Road and the

                                                                                       Page 35 of 145

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 36 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014

                                                                               ATTACHMENT 1
           proposed road improvements are not sufficient to provide the necessary safe environment
    4,    traffic generated by the development proposed will have significant adverse impacts on the
           amenity of residents, given Top Forestry Road is unsealed and bird collection is likely to be
           through the night and
    5.     the proposed sheds and earthworks necessary for shed construction is likely to adversely
           impact on the scenic amenity of the area, as the applicant has not demonstrated that they
           will integrate satisfactorily with the landform and landscape.

    FINANCE AND RESOURCING
    If council were to approve this development, the applicant would be required to pay infrastructure charges
    for trunk infrastructure.
    Council's Infrastructure Policy Branch has provided the following estimate of the infrastructure charges
    required by this development (which excludes infrastructure charges to Unitywater):
     isStatuSheceaket Mosse cheroe © ew) noun Paya
     Allocation  of  adopted   infrastructure charge   to  trunk
                                                                         $156 672 |
    Public Parks & Land for       Community Facilities        | ___s27.64a |
     Stormwater (applicable to Non-Residential    development  |     __ $500,000 |
     TOTAL (June 2013 index) =                                           $684,320 |
    PROPOSAL
    The application seeks approval for a Material Change of Use for Animal Husbandry Type 2 — Intensive
    (Poultry Farm) and Environmentally Relevant Activity (ERA 4 - Poultry Farming), situated at 136 Top
    Forestry Rd, Ridgewood.
    The development involves the construction of 8 x 100m to 130m long x 16m wide sheds along the ndgeline
    of the site, with each shed containing 30,000 to 38,500 chickens. On this basis, the site has the potential to
    carry in the order of 250,000 birds at any one time. The applicant indicates the process involves the
    rearing day old chicks to chickens for a period of 6-9 weeks, before being removed from the site for chicken
    meat production (batch cycle).
    Feed for the birds is brought onto the site throughout the batch cycle by 19m B-doubles, with an increase in
    frequency associated with the birds’ mass. The applicant provided details for the feed requirements for an
    8 shed farm, with 4 delivers in the first week, increasing to 24 delivenes dunng week 7 of the 9 week
    cycle. The grown chickens are then removed from the site by truck in weeks 6, 7 and 9, most likely at night
    when the bids are less active.
    The applicant also proposes that, upon the completion of the bird growing cycle, the sheds are cleaned out
    and prepared for the next batch cycle over a 2 week penod. Spent litter from the sheds is proposed to be
    stockpiled within 2 bunded areas for a period of 4 to 5 weeks, before being spread onto the existing
    avocado orchard. The bunded areas have a total lineal distance of 300m x 20m wide and are located
    adjacent to the proposed sheds.
    A Preliminary Operational Management Plan has been prepared by the applicant to address the operation
    of the proposed poultry farm and the existing avocado farm.
    The proposal plans are included as Attachment 1.

                                                                                      Page 36 of 145

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 37 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               16 September 2014

                                                                           ATTACHMENT 1
  SITE DETAILS
  Background/Site History
 There are no existing development approvals over the site. The owner of the farm indicates avocados
 have been grown on the site for the last 20 years.
  A prelodgement meeting was held in December 2011 regarding the current proposal. Advice was given
  about the numerous detailed reports required for council to assess the impacts of the proposal. The
  applicant then approached the Department of Natural Resources and Mines, to remove the site from the
  Queensland Strategic Cropping mapped area.
 The application was made on 21 November 2012, with a subsequent information request issued on 10
 December 2012. Further detailed information was asked of the applicant regarding visual amenity,
 stormwater management, site stability, traffic generation and movement. A response to the request was
  given on 8 May 2013. The application then commenced advertising for 15 business days, which was
  finalised on 12 June 2013.
 Following a further site meeting with the applicant to clarify a number of aspects of the proposal, which
 were not satisfactorily addressed within the information response, council issued a further outstanding
 issues request on the 28 June 2013. The applicant responded with the revisions to the proposal on 12 and
  24 September 2013.
  Site Description
 The subject site is 105ha in size and is located at 136 Top Forestry Road, Ridgewood. The site is
 characterised as having relatively steep sloping terraces, planted out with avocado orchards connected by
 farm access roads extending along the ndgelines. There is an existing farm shed located on the ndgeline
 within the middle of the site, housing much of the farm equipment associated with the avocado
  cropping. There are 7 dams on the site located at the bottom of each of the hillsides, which are used to
  imigate the existing avocado orchard.
  A 120m wide easement extends along the site's westem boundary. This easement includes Powerlink’s
 electricity stanchions.
 There is an existing farm house located close to the existing access to Top Forestry Road in the south
 eastem portion of the site. The existing access to the site is via an unsealed driveway, while Top Forestry
 Road is unsealed for 1.3km from the intersection with Old Ceylon Road.
  Surrounding Land Uses
 The site is located adjacent to 1,150ha of State Forest to the west. The other adjoining properties to the
 subject site are included on the locality plan below, with a summary of each of the adjoining properties
 detailed in the corresponding table.

                                                                                    Page 37 of 145

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 38 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        16 September 2014

                                                                                      ATTACHMENT 1

                     ‘ *                   "          :                 a 4
        -                                   ‘                  ;                    Pg
        ai            .                      ean)                                     Y
                                 Cyr           Ne                      ae

                                        em eS                                a's        é
                                        ‘Soak  ia                  FSS      -         -
                                             Ye               A          wd
                                           a alas                         AS
                                        aise: oe                         2
                                            Subjectsite         474    £ ‘
                                                  iW    ra         4                .
                        ho)  ee od              ns            itl      ‘              3
                                                e 7                                   ¢
                                                ,                             a        ” 4
      LP ibeh 1B ie) ) 4                                 hae
                                                     yy?   wae) .          Li      ee
                                                      2                 nie       fa

     co                  al                                 8                  ’

     propery fo               pe
    Pro pe
     977 Cooroy       674ha_ | There is an existing house located      Predominantly vegetated
     Belli Creek                 close to Cooroy Belli Creek Road in the | with a single detached
    Road                         north westem portion of the lot. The  house.
                                 house is 1,150m from the existing farm
                                sheds on the subject site.
     869 Cooroy       49.3ha_ | There is an existing house located in  The lot is partially cleared
     Belli Creek                the northern portion of the lot. The   with cattle grazing.
    Road                         house is 980m from the existing farm
                                sheds on the subject site.

     76 Top Forestry | 49.4ha_ | There is an existing house located in The lot is partially cleared
    Road                        the northern portion of the lot. The   with cattle grazing.
                                 house is 950m from the existing farm
                                sheds on the subject site.
     124 Top          647 ha_ | The lot is currently cleared with no   The lot is partially cleared
     Forestry Road               houses on the site. This lot is owned by | with cattle grazing.
                                the applicant and is approximately
                                700m from the existing farm sheds on
                                the subject site.
     146 Top          2.04ha_ | There is an existing house with shared | Predominantly vegetated
     Forestry Road              access to the subject site. This lot is with a single detached
                                owned by the applicant and is          house.
                                approximately 650m from the existing
                                farm sheds on the subject site.
     172 Top          2.92ha_|  The lot is  predominantly vegetated with

                                                                                              Page 38 of 145

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 39 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  16 September 2014

                                                                                ATTACHMENT 1

     =
     Property
    Forestry Road             a farm shed in the south eastern portion | with no detached houses.
                             of the lot. This lot is owned by the
                              applicant and is approximately 850m
                              from the existing farm sheds on the
                              subject site.
    224 Top                   The lot is currently cleared with no Avocado cropping with
     Forestry Road            houses on the site. This lot is owned by | the imgation of trees from
                              the applicant and is approximately  the dams on the subject
                              750m from the existing farm sheds on ‘| site.
                             the subject site.

    ASSESSMENT
     Framework for Assessment
     Instruments for Statutory Assessment
     Under the Sustainable Planning Act 2009, the application must be assessed against each of the following
    planning instruments to the extent they are relevant to the development:
        e2_7OState Planning Policies
     eC Othe South East Queensland Regional Plan
       e2_7 State Planning Regulatory Provisions and
        e2_Cothe Planning Scheme for the local government area.
    Of these, the planning instruments relevant to this application are discussed in the sections that follow.
     Statutory Instruments — State and Other
    State Planning Policies
    The relevant State Planning Policies applicable to this application have been deemed by the Minister for
    Local Govemment and Planning as being appropriately reflected in The Noosa Plan and, therefore, do not
    warrant a separate assessment.
    South East Queensland Regional Plan
    The site is located within the Regional Landscape and Rural Production designation of the SEQ Regional
     Plan. The regional policies in Part D of the Regional Plan are relevant when assessing a development
    application. The proposed development is consistent with the regional policies.
    State Planning Regulatory Provisions
    The SEQ Regional Plan Regulatory Provisions are applicable to this application. The proposal is for a rural
    activity within the Regional Landscape and Rural Production Area designation of the SEQ Regional
     Plan. The proposed use is consistent with Division 2 of the SEQ Regulatory Provisions.
     Statutory Instruments — Planning Scheme
    The applicable planning scheme for the application is The Noosa Plan (8 August 2011). The subject site is
     located in the Mary River Catchment and zoned Rural. The proposed use is identified as Animal
     Husbandry Type 2 — Intensive (Poultry Farm). The proposed poultry farm, being a rural use, is identified as
    a consistent use in the rural zone. However, intensive animal husbandry uses are required to follow an
     impact assessment process and must demonstrate that the selected site is suitable, and the potential
     impacts can be appropriately managed.

                                                                                       Page 39 of 145

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 40 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  16 September 2014

                                                                             ATTACHMENT 1
  Local Area Provisions
 The Overall Outcomes of the Mary River Catchment locality seek to maintain the rural character, lifestyle
  and accessibility enjoyed by residents. Agricultural uses are to remain a significant part of the economic
 activities in the locality, ensuring that these uses are continued on better agncultural land on and adjacent
 to the valley floors.
 Land Use and Works Provisions
 The application has been assessed against The Noosa Plan. The pertinent issues arising out of the
 assessment against the relevant codes are discussed in terms of their relevant topic below.
  Traffic
 The site is accessed from Cooroy township (residential streets) via Cooroy Belli Creek Road, Old Ceylon
 Road and Top Forestry Road. See Attachment 2.
 The applicant indicates that the use will require servicing by a mix of semi-trailers and truck and dog
  combinations (litter delivery, bird delivery and collection, dead bird collection) and 19m B-doubles for the
  delivery of feed. During the assessment of the application, the applicant submitted a number of versions of
 the onginally submitted traffic report prepared by Hayes Traffic Engineering, to address council's concerns
 with traffic movements.
 The submitted traffic report describes the number of traffic movements (trips) of the existing cropping use of
 the site and the potential number of traffic movements (trips) of the proposed use of the site (reduced
  cropping and new poultry use). The report is based upon the assumption that the “poultry” use will be
 staggered through the 8 sheds to spread the traffic demands over the 8 week “batch” cycle. However, the
  applicant's MWA Environmental report, and industry advice, suggest this assumption is incorrect and that
 the poultry processors prefer all sheds on a property to be at the same stage within the “batch”.
 The report uses methodology to calculate the yearly tip generation from the existing and proposed uses
  and divide the total by 365 to determine a “per day” tnp rate. This methodology does not give any
  consideration to:
    e2Oothe type of vehicle for the “trip” or
     e2_Cothe impacts (safety, noise, dust, road maintenance) of a “heavy vehicle” tip compared to the
        “tip” of a passenger vehicle. It is considered in this instance that, due to the location of the site,
       assessment of the impacts of the traffic generated by the proposed development must go beyond
       “tip” numbers or
    e2_Cothe vanations in daily “trip” numbers due to the specific use. The variations occur in the cropping
        use due to the seasonal requirements (e.g. picking season) and in the poultry use due to the
        production timeframes (e.g. bird collection). It is considered in this instance that, due to the location
        of the site, assessment of the impacts of the traffic generated by the proposed development must
        consider the daily/weekly vanations in “trip” numbers.
 It is noted that, while the application onginally included a reduction in the cropping on the site and,
  therefore, a reduction in traffic movements, information supplied by the applicant on 12 September 2013
 indicates an additional 3,000 trees will be planted in currently fallow areas of the site. It is reasonable to
 assume that, although some cropping area would be lost to the proposed poultry use, the 3,000 additional
 trees would not result in any net loss in traffic movements of both passenger and heavy vehicles for the
  original cropping use of the site.
 With regard to the potential number of traffic movements (trips) generated by the proposed poultry use,
  there are discrepancies between the total number of heavy vehicle tnps per “batch” from the submitted
 Hayes traffic report (218 tnps), the submitted MWA Environmental report (234 tnps), and council's
  calculations (348 trips) (Attachment 3). Council's calculations have been based on the submitted MWA
  Environmental report and industry advice. The activities that appear to have been overlooked or under-
 estimated are dead bird collection and the collection of the birds for market. Notably council's traffic

                                                                                       Page 40 of 145

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 41 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014

                                                                               ATTACHMENT 1
    calculations mentioned above have not considered the removal of litter from the site which would equate to
    approximately an additional 20 trips at the end of each batch. The highest number of traffic tips are
    created during the second half of the “batch” (days 36-63) with the trips increasing for feed delivenes and
    bird collection. It is noted that industry practice is for the bird collection to occur at night. It is also noted
   that the application refers to “5-6 batches” per year’.
    A breakdown of council's estimation of traffic movements to the site is included as Attachment 3. Notably,
    dunng peak times at the end of each batch cycle, the number of truck movements is anticipated to be 92
   trips (in and out) in any one week, with the last bird collection potentially being up to 90 truck trips over 1 to
    2 nights.
    Cooroy Belli Creek Road and Old Ceylon Road are sealed rural standard roads. These roads are of a
    suitable standard to cater for the vehicle types, although there are concems with the number of heavy
    vehicles proposed.
    The existing formation of Top Forestry Road is gravel with variable widths and a number of tight bends, and
    is not of a suitable standard to cater for the number of heavy vehicles expected to be generated by the
    poultry farm. The first section of Top Forestry Road extending from Old Ceylon Road to No. 101
    predominately runs along the ridgeline. There is limited opportunity to widen the formation due to the
    existing vegetation. The bends along Top Forestry Road are narrow with obscured sight lines. The most
    significant bend is located adjacent to the westem comer of No. 101. The bend is located in a gully with a
    formation width of approximately 4m. The sight lines across this bend are obscured by vegetation located
    within the road reserve. The topography of the gully at this point is such that a widening of the road at this
    location in either direction is not feasible. It is also noted that the school bus travels along Top Forestry
    Road from Old Ceylon Road to a tumaround area adjacent to the entrance to the subject site.
    In order to provide a safe environment for local road users (residents, school bus, etc.) it is considered that
    substantial improvements to Top Forestry Road would be required to cater for the number of heavy
    vehicles required to service the poultry use. These improvements would need to be sufficient to cater for
    the demands during inclement weather, especially during the peak times in the “batch” and at those times
   when the peak times in the “batch” coincide with the seasonal peaks of the cropping use. It is considered
    that the improvements suggested in the most recent Hayes traffic report are not sufficient to provide the
    necessary safe environment.
    It is considered that, given the natural topography and the extent of works required to construct Top
    Forestry Road to the required standard, it is neither feasible nor reasonable to condition the developer to
    construct the necessary improvements.
    Dust and Noise Nuisance
    The operations of the poultry farm have the potential to cause dust and noise nuisance for the surrounding
    residential properties. The Noise and Air Quality Impact Assessment, prepared by MWA Environmental
    concludes that the dust dispersion and noise amenity criteria for the poultry sheds meet the relevant
    guidelines. This report has been reviewed by council's specialists who advise the proposal will meet the
    relevant guidelines for on-site operations.
    However, the application does not address noise and dust emissions from the heavy vehicles using the
     1.3km section of Top Forestry Road, which is unsealed and built into the side of a hill, and noise from
    heavy vehicles on the remainder of the route. The noise pressure levels of trucks travelling along Top
    Forestry Road, both day and night, will affect the amenity of the residential properties adjacent to it. Dust
    nuisance could only be mitigated by the frequent application of dust suppressants or the permanent sealing
    of the road for those houses within 50m.
    The proposal is also likely to generate a noise nuisance for those residents living on the local roads, in
    particular for those residents on the residential streets of the route. While the applicant's preferred route,
    including Myall Street, Crystal Street, Maple Street then to Cooroy Belli Creek Road is a logical route, the
    second stage of each “batch” is likely to include night trips and noise from trucks is likely to be
    unacceptable for residents on these residential streets.

                                                                                      Page 41 of 145

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 42 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014

                                                                             ATTACHMENT 1
 calculations mentioned above have not considered the removal of litter from the site which would equate to
  approximately an additional 20 trips at the end of each batch. The highest number of traffic tips are
 created during the second half of the “batch” (days 36-63) with the trips increasing for feed delivenes and
 bird collection. It is noted that industry practice is for the bird collection to occur at night. It is also noted
 that the application refers to “5-6 batches” per year’.
  A breakdown of council's estimation of traffic movements to the site is included as Attachment 3. Notably,
  dunng peak times at the end of each batch cycle, the number of truck movements is anticipated to be 92
 trips (in and out) in any one week, with the last bird collection potentially being up to 90 truck trips over 1 to
  2 nights.
 Cooroy Belli Creek Road and Old Ceylon Road are sealed rural standard roads. These roads are of a
 suitable standard to cater for the vehicle types, although there are concems with the number of heavy
 vehicles proposed.
 The existing formation of Top Forestry Road is gravel with variable widths and a number of tight bends, and
 is not of a suitable standard to cater for the number of heavy vehicles expected to be generated by the
 poultry farm. The first section of Top Forestry Road extending from Old Ceylon Road to No. 101
  predominately runs along the ridgeline. There is limited opportunity to widen the formation due to the
 existing vegetation. The bends along Top Forestry Road are narrow with obscured sight lines. The most
 significant bend is located adjacent to the westem comer of No. 101. The bend is located in a gully with a
  formation width of approximately 4m. The sight lines across this bend are obscured by vegetation located
 within the road reserve. The topography of the gully at this point is such that a widening of the road at this
 location in either direction is not feasible. It is also noted that the school bus travels along Top Forestry
 Road from Old Ceylon Road to a tumaround area adjacent to the entrance to the subject site.
  In order to provide a safe environment for local road users (residents, school bus, etc.) it is considered that
  substantial improvements to Top Forestry Road would be required to cater for the number of heavy
 vehicles required to service the poultry use. These improvements would need to be sufficient to cater for
 the demands during inclement weather, especially during the peak times in the “batch” and at those times
 when the peak times in the “batch” coincide with the seasonal peaks of the cropping use. It is considered
 that the improvements suggested in the most recent Hayes traffic report are not sufficient to provide the
  necessary safe environment.
 It is considered that, given the natural topography and the extent of works required to construct Top
 Forestry Road to the required standard, it is neither feasible nor reasonable to condition the developer to
 construct the necessary improvements.
 Dust and Noise Nuisance
 The operations of the poultry farm have the potential to cause dust and noise nuisance for the surrounding
  residential properties. The Noise and Air Quality Impact Assessment, prepared by MWA Environmental
 concludes that the dust dispersion and noise amenity criteria for the poultry sheds meet the relevant
  guidelines. This report has been reviewed by council's specialists who advise the proposal will meet the
 relevant guidelines for on-site operations.
 However, the application does not address noise and dust emissions from the heavy vehicles using the
  1.3km section of Top Forestry Road, which is unsealed and built into the side of a hill, and noise from
 heavy vehicles on the remainder of the route. The noise pressure levels of trucks travelling along Top
 Forestry Road, both day and night, will affect the amenity of the residential properties adjacent to it. Dust
  nuisance could only be mitigated by the frequent application of dust suppressants or the permanent sealing
 of the road for those houses within 50m.
 The proposal is also likely to generate a noise nuisance for those residents living on the local roads, in
  particular for those residents on the residential streets of the route. While the applicant's preferred route,
 including Myall Street, Crystal Street, Maple Street then to Cooroy Belli Creek Road is a logical route, the
 second stage of each “batch” is likely to include night trips and noise from trucks is likely to be
  unacceptable for residents on these residential streets.

                                                                                      Page 42 of 145

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 43 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014

                                                                               ATTACHMENT 1
   Odour Nuisance
    The proposed use of the site for intensive poultry farming, including the storage and spreading of the
    manure, has the potential to affect the air quality of surrounding neighbours.
    The applicant included an Air Quality Impact Assessment prepared by MWA Environmental, for the 8
    poultry growing sheds. Pacific Environment reviewed the report's methodology and emissions estimations
    on behalf of council. It was found the emissions estimation and modelling was calculated generally in line
    with standard methods. However, there is a lack of data on the emissions from manure stockpiles and
    manure spreading. Pacific Environment are, therefore, unable to support the findings by the applicant that
    the farm complies with the Queensland odour guideline for rural zoned land of 2.5 odour units = C23;
    are. Notably, even were the applicant to meet this guideline, the odour concentration levels would be
    noticeable for nearby residents although classified as weak by the guidelines, but with the smell considered
    “distinct” for at least 44 hours/year.
    Pacific Environment also describe how most new poultry farms in SEQ Queensland are not approved with
    litter stockpiling or spreading on site, as there is little data available about the resultant emissions.
    The applicant's Preliminary Operations Management Plan details the fertiliser stockpiles and application
    are an integral component of the proposed use, with a number of management practices having to be
    adhered to for the development not to cause nuisance, including:
       e2_Cilitter stockpiles being covered
        e_Cilitter stockpiles tumed at least weekly, and only when prevailing winds are below 10km/h and
          from the northeast to southeast sector
        e2_applying litter within 4-5 weeks of the cleanout of the sheds to avoid stockpile odours coinciding
          with high shed odours
        e2—Cominimum setback of 50m is retained from spreading areas to boundanes and waterways
      e_Cilitter is spread only during 6am to 6pm, and only when prevailing winds are from the northeast to
          southeast and
        e2_Doonly low velocity spreading equipment is used.
    The applicant submits that these management practices would minimise odour emissions, yet no modelling
    has been undertaken to quantify such claims. Council’s Environment Officer recommends that this practice
    has the potential to be problematic and onerous on the operator, with conditions required to manage this
    practice unlikely to be feasible. Furthermore, the Department of Agriculture, Forestry and Fisheries
    guidelines recommend composting for a minimum of 12 weeks and, therefore, the applicant's composting
    timeframes of 4-5 weeks may be unrealistic.
    The applicant includes advice from an agronomist (Mynad International) detailing that all of the poultry
   manure compost can be utilised by the existing orchard. Using the Department of Agnculture, Fisheries
    and Forestry guidelines for applying poultry manure on farms, it is likely the modelling over-estimates the
    manure application rates, and under-counts the area of trees to which the manure could be
    spread. Furthermore, in discussions with the department, officers advised that the proposed application
    rates may eventually kill the tree crop.
    An additional shortcoming of the odour modelling report identified by Pacific Environment is the failure to
    include the sensitive receiver location at 146 Top Forestry Road. This site includes a detached house and
    is currently a separate freehold lot under the ownership of the applicant. As with other SEQ poultry farm
    applications, it is regionally acceptable for this existing house to be included in the modelling. This
    sensitive receiver site would not meet the Queensland odour guidelines for rural zoned land, based on the
    predicted odour from the chicken sheds.
    Water Quality

                                                                                      Page 43 of 145

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 44 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                16 September 2014

                                                                              ATTACHMENT 1
    The Noosa Plan seeks that the water quality of watercourses within the Mary River Catchment Locality is
    maintained and enhanced. A Stormwater Treatment and Water Quality Management Plan have been
   prepared by Callaghan and Toth, which aims to address the impacts and proposes stormwater treatments
    for the proposed poultry farm operations.
    The report details how the proposed treatment train is capable of removing nutrients and heavy metals from
    the poultry shed areas. However, it does not adequately address how the spreading of the litter will be
    managed with regard to nutrient and stormwater runoff. In particular, there is uncertainty with regard to
    nutrient uptake from the application of litter on the avocado orchard and how this will be managed.
    Guidelines used by the Department of Agriculture, Fisheries and Forestry indicate that approximately 38%
    of phosphorus in poultry litter is in the available water soluble form. This results in the manure being more
    prone to being transported in a leaching or runoff event. In addition, the orchard is of a relatively low tree
    density and cover on steep land, and these factors would increase the likely risk of nutrient transport in
    runoff events.
    Callaghan and Toth’s report for the applicant indicates that the use of poultry litter to fertilise the existing
    avocado trees will be managed, to ensure nutnent levels do not exceed current application rates of
    commercial fertiliser. However, there is uncertainty involved with the information provided about the new
    fertiliser regime of spreading the manure on the existing avocado orchard, in terms of the effects on water
    quality entering the Mary River tributary. Council's specialists advise that, while the receiving vegetation
    environment may not be significantly affected by increased phosphorous levels, there is insufficient
    quantitative information provided about the specific design of the catchments within the avocado orchard, to
    assess all the potential impacts on the adjoining waterways. Notwithstanding this, it must be acknowledged
    that poultry manure could be spread on the avocado orchard now, with no approval required from council,
    although this is unlikely to occur as frequently compared with the proposed poultry farm operations.
    Visual Amenity
    For development on sloping sites and ridgelines, The Noosa Plan seeks for buildings and structures to be
    responsive to the natural topography and landscape character. The proposed development is for 8 x 100m
    to 130m long x 5m high sheds along the existing ndgelines of the site. Large quantities of cut and fill are
    required on the existing ndgelines, to accommodate not only the sheds, but also the roads for trucks to
    service each of them and 300m long x 20m wide bunded litter storage areas. Retaining structures are
    required in some locations, which include a height difference of approximately 8m between the floor levels
    and the existing hillslopes.
    The applicant proposes to screen the buildings and structures by finishing the sheds in muted tones, and
    using existing avocado trees along the sides of the slopes. However, due to the nature of the cut and fill to
    accommodate the buildings, roads and bunded areas on the ndgelines, there are some locations where
    vegetation screening will be ineffective.
    CONSULTATION
    IDAS Referral Agencies
    The application was referred to the following IDAS referral agencies:
    Concurrence
    Department of Transport and Main Roads
    The department is a concurrence agency for the application, as the proposal exceeds the threshold for
    development impacting on State transport infrastructure (>200,000 poultry). The department responded by
    letter dated 13 December 2012 stating that they have no requirements.
    Advice
    Powerlink

                                                                                     Page 44 of 145

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 45 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    16 September 2014

                                                                                  ATTACHMENT 1
     The department is an advice agency for matters associated with the Eerwah Vale Transmission Line
     Cormdor. The department responded by letter dated 20 December 2012 stating that all buildings shall not
     extend into their electricity easement area, also the proposed gravel road within the easement shall
     maintain a minimum 20m separation from the edge of Powerlink’s structure footings.
     Third Party Advice
     Department of Agriculture, Fisheries and Forestry
    The department does not have any formal role in the assessment of this application. At the time the
     application was made (21/11/12) the application involved prescribed ERA 4 Poultry Farming in which the
     administration and enforcement is devolved to Local Govemment under the Environmental Protection
     Regulation 2008.
     On 31 March 2013, the State Govemment introduced the Greentape Reduction Act 2012 which resulted in
     changes to the prescnbed Environmentally Relevant Activity (ERA) in the Environmental Protection
     Regulation 2008. The administration and enforcement of this ERA is now devolved to the Department of
    Agriculture, Fishenes and Forestry. This means council will no longer be responsible for enforcement of
    the farm if it became operational.
     The department's Senior Environmental Scientist, responsible for poultry farms, provided advice to council
    as a third party advice agency. The advice is of a general nature and provided links to the department's
     guidelines relating to avocado growing and using poultry litter on pastures, which is incorporated into this
     report.
     Other Referrals
     Internal
     The application was forwarded to the following internal council specialists and their assessment forms part
     of this report:
        e2_loDevelopment Engineer, Engineering and Environment Assessment Branch
        ellOoHydraulics and Water Quality Specialist, Engineering and Environment Assessment Branch
        eD_CoLandscape Officer, Engineering and Environment Assessment Branch
        e2—OoEnvironment Officer, Engineering and Environment Assessment Branch
        e2_7oUrban Designer, Planning Assessment Branch and
        eD_OoTraffic Engineering, Engineering and Environment Assessment Branch.
     Public Notification
    The application was publicly notified for 15 business days in accordance with the requirements of
    the Sustainable Planning Act 2009. 12 properly made submissions and 118 not properly made (late)
    submissions were received. Of the 130 total submissions, 101 are objecting and 29 supporting the
     application. A map of the nearby submitters is provided below:

                                                                                         Page 45 of 145

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 46 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          16 September 2014

                                                                                        ATTACHMENT 1

                                                      e            +.  ‘.
       ©                   rg  ae                        Me a ,             |
                                                        e      Y
               ee               te                              |        :
         i      %      = | @ oesccras                                    o_~
              ma «                                                       s &
                 > rox?                                             .         \
                                                                           '    \        s
              baba               ;                    es              *     Bj * \
         °     ,                w                           3                  "HEN
                             e             a                @                     . \
           ba,                              .?      >     of eo s       os           \
              I                                     ©           3       a               \
                                 pe       See                  ps                        *
                        Coery nen                 ee?          .             1
                                       pmaner ars #, P -    &        ‘
      !                  .           ,            :
                                      afd.               £                  ‘
          ;                 y       Caerte'ps                         |                  4
                                  SS                                               7     re,
                        Seth" yoo                 .            é                  i.
                               LS    tee                                          5
        a                  Read 9, out                                    ‘ =
             “se                 ."
              ¥               b     3        ”                              Coty,
                    ;        te      oy       %                                Naan,
                ‘               ~       i              NS       yey                    .   ,
                        }      Toei                        Fem    é   +     >           ees,

     The following table provides a summary and assessment of the issues raised by submitters.
     [Issues 0                                      Comments
     Operations                                     The Preliminary Operational Management
      Broiler shed production is now a synchronized | Plan calculates the total amount of shed
      operation, rather than staged. This streamlines | litter potentially generated by a full shed
      production but means enormous volumes of      cleanout to be 1,027m3 per batch. No
      odourous shed litter require processing in huge | quantitative data has been provided to
      batches at each shed clean out.               estimate the odour emissions from this
                                                    source.
      Noise Impacts                                 No road improvements have been
      Noise impacts on neighbouring dwelling as a   suggested by the applicant to suppress
      result of day and night operations, including increased sound pressure emissions from
      ventilation, shed clean out and traffic.      trucks travelling along the associated
                                                    roads, both day and night. All other noise
                                                    impacts from the sheds are considered to
                                                    comply  with the relevant noise criteria.
      Odour Impacts                                 The odour modeling fails to account for
      Odour impacts will adversely affect the       the impacts associated with the
      neighbouring residents.                       stockpiling of manure and spreading on
                                                    the existing avocado orchard. The report
                                                    also does not satisfy the QLD Odour
                                                    Guidelines of 2.5 odour units = C99.5 Thr
                                                    for the neighbouring property at 146 Top
                                                    Forestry Road.
                                                    associated wih the cleanout of th
      The dust problems will adversely affect the   associated with the cleanout of the sheds

                                                                                                Page 46 of 145

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 47 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  16 September 2014

                                                                                ATTACHMENT 1

     neighbouring residents.                    indicates no nuisance to neighbouring
                                                dwellings. However, no modeling has
                                                been undertaken to assess the dust
                                                impacts as a result of the increased truck
                                                movements along Top Forestry Road.
                                                These movements have the potential to
                                                cause a nuisance to neighbours,
                                                especially during the second stages of the
                                                batch cycle, which involves increased
                                                truck movements throughout the day and
                                                night.
     Shed Waste and Fertilizer Application      The potential impacts associated with the
     Waste litter storage area massively increased | reuse of spent poultry litter back on to the
     from 280m? to 5,273m?, an area equivalent to | existing avocado orchard have not been
     3 more broiler sheds.                     satisfied or addressed. The proposal
     Applicant now plans to remove waste litter off | includes reduced composting times
     the property that can't be stockpiled.     compared to DAFF guidelines, and there
     Composting times of 4-5 weeks are less than _| is ambiguity in the nutrient uptake of the
     half that of industry standards for full   avocado orchard from poultry manure.
     composting and therefore no thorough
     treatment of the pathogens.                DAFF guidelines are only available about
     No gradient plan to determine appropriate litter | the reuse of this spent litter on existing
     spreading sites as per Department of Forestry | pastures over large areas and infrequent
     and Fisheries (DAFF) guidelines.           spreading regimes. Furthermore, any
     Revised tree audit fails to account for the spent litter that is not to be used on the
     hundreds of avocado trees to be removed for | site is planned to be removed from the
     the huge new compost litter zones.        site and sold to local farms.
     Revised agronomist's report does not take
     differing ages and conditions of existing trees | The traffic report does not appropriately
     in composted litter application data.      consider this aspect of the proposal,
     No information supplied of similar broiler resulting in additional truck movements
     operations that are using on-site processed from the site.
     litter material on tree crops.
     Traffic                                    The poultry use requires servicing by a
    The roads servicing the site are inappropnate | mix of semi-trailers and truck and dog
    for the use of B double and other heavy     combinations (litter delivery, bird delivery
     vehicles, with no plan to improve the surface of | and collection, dead bird collection) and
     Top Forestry Rd or ameliorate the dust     19m b-doubles for the delivery of feed.
     nuisance to properties along the road.    These types of trucks are small enough
    No traffic plan has been provided for heavy not to require an approved B Double
     vehicles passing through the town of Cooroy, | route.
     heading south to the Bruce Highway.
     ls it a true assessment of how many trucks will | A further revision to the traffic plan was
     be using this road and will it be 7 days a week? | received to council on the 24 September
     (No accounting for the traffic generated by the | 2013, showing truck movements from the
     heavy vehicles removing excess shed litter Highway to Myall St, Crystal St, Maple St,
     from the property and no accounting for any Cooroy Belli Creek Rd, Old Ceylon Rd,
     extra staff movements or dead bird removal in | Top Forestry Rd and then the site.
    the traffic plan).
     A school bus stop is near the site and no The main traffic concem involves the use
     consideration has been given to pedestnans. _| of the currently unsealed and constrained
                                                Top Forestry Road. The proposal
                                                undercounts truck movements to and from
                                               the site and does not account for excess
                                                shed litter. Road improvements will be an
                                                unreasonable cost to improve the safety
                                                for all users of Top Forestry Road.

                                                                                       Page 47 of 145

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 48 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   16 September 2014

                                                                              ATTACHMENT 1

  The sheds and associated earthworks will   and fill on the existing ndgelines to
   have a visual impact to the surrounding   accommodate the sheds, roads and litter
  houses.                                    storage areas. Vegetated screening is
   Too many signs will have to be erected along _| unlikely to be successful due to the sites
   the roads waming of trucks etc.           slope and significant earthworks
  The proposal is completely out of scale with proposed.
   other agricultural uses.
   Water Quality                             The water quality specialists consider the
   Rainfall data has been taken from Tewantin, rainfall data used to be adequate for this
   whereas the rainfall totals in the Top Forestry _| location. However, there is uncertainty
  area have been a lot more in the previous  regarding the water quality impacts
  three years.                               associated with the application of spent
   Impacts on the tributary to the Mary River. litter on the existing avocado orchard.
                                             MUSIC modeling does not apply to
                                             calculate the impacts, as this is
                                             predominantly an urban catchment model
                                             and assess different nutrient criteria.
   Public Notification                       The applicant's consultant advises that he
  Residents along Top Forestry Road advise that | carried out the public notification for the
   there was a lack of signs along Top Forestry application in accordance with the Act’s
  Road                                       requirements and did maintain a sign to
                                             this road frontage.
  Submissions in support                    Were the application to be approved, the
   The applicant has a proven track record and is | approval is for the site, not the operator.
   a skilled operator
  Significant investment in local economy    The proposal is not consistent with the
   The proposal will create additional employment | planning scheme as the applicant has not
   Is consistent with planning scheme and    satisfactonly demonstrated that the
  impacts are addressed appropnate'!         impacts can be  mitigated appropnately.

  DRAFT SUNSHINE COAST PLANNING SCHEME
  The proposal is defined in the rural activity group being an Intensive Animal Industry— Poultry and located
  within the Rural Zone of the draft Sunshine Coast Planning Scheme.
  The application would trigger impact assessment under the draft planning scheme, as the development
  involves more than 1,000 birds and would be affected by the following overlays:
     e_OoBiodiversity, Waterways and Wetlands — Waterways: Stream Oder 1-2 & 34
     el_COBiodiversity, Waterways and Wetlands — Ripanan Protection Area
     e“_OOBiodiversity, Waterways and Wetlands — Native Vegetation Area
     e_OoBiodiversity, Waterways and Wetlands — Koala Habitat Area
     e2"OoBushfire Hazard — High Hazard Area
     e2_CoHeight of Buildings and structures — 8.5 metres
     eOOLandslide Hazard Area
    e277 oRegional Infrastructure — High Voltage Electncity Line and Buffer and
     e2—OOScenic Amenity — Scenic Route.
  The applicant has not satisfactorily demonstrated that the potential adverse impacts can be appropriately
  mitigated in accordance with the draft Sunshine Coast Planning Scheme. However, it should be noted that
  on 18 March 2013 council resolved to not include the Noosa Planning Scheme area in the yet to be
  finalised Sunshine Coast Planning Scheme due to de-amalgamation of the Noosa area on 1 January 2014.

                                                                                        Page 48 of 145

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 49 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   16 September 2014

                                                                                 ATTACHMENT 1
     CONCLUSION
    It is concluded that the proposed poultry farm does not meet The Noosa Plan provisions. While the site is
    zoned Rural, the access and location is not suitable for such an intensive animal husbandry use. The
     proposed development does not achieve sufficient separation distances from the surrounding residents, so
    as to avoid adverse odour impacts on residents’ amenity. The applicant has not provided sufficient details
    on the potential emissions from manure stockpiles and manure spreading to demonstrate that the poultry
    farm complies with the Queensland odour guidelines for rural zoned land. The closest houses to the site
    are also at risk of distinct odour impacts at times, with the applicant's report failing to address one of the
    sensitive receiver locations.
    The proposal will also generate significant traffic movements, impacting on the traffic safety of Top Forestry
    Road, with the applicants proposed improvements not sufficient to provide the necessary safe
    environment. It is neither feasible nor reasonable to condition for the developer to construct the necessary
     improvements to this road, given the topography and the extent of works required to achieve a reasonable
    standard. Traffic movements are also likely to adversely impact on residents’ amenity due to dust and
     noise generation on Top Forestry Road. Collection of birds is also likely to be through the night during the
     peak batch cycle, affecting residents living along the route, particularly the residential streets in the Cooroy
    township.
     It is, therefore, recommended that the application be refused.

                                                                                        Page 49 of 145

Section 50

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 50 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   16 September 2014

                                                                                 ATTACHMENT 1

          ORDINARY MEETING UPDATED REPORT                           12 DECEMBER 2013
           7     REPORTS DIRECT TO COUNCIL
           7A    REGIONAL STRATEGY AND PLANNING
           71.2   UPDATED REPORT - DEVELOPMENT APPLICATION FOR ANIMAL
                 HUSBANDRY TYPE 2 INTENSIVE (POULTRY FARM) AT 136 TOP
                  FORESTRY ROAD, RIDGEWOOD
          File No:           MCU12/0184
          Author:           Development Planner
                            Regional Strategy & Planning Department
          Attachments:      Att 1 - Revised Heavy Vehicle Estimation...            15
                            Att 2 - Proposed Upgrades to Top Forestry Road....................... 17
                                                                                     |

           PURPOSE
          In November 2013, council deferred consideration of a Development Application for Material
          Change of Use for Animal Husbandry Type 2 (Poultry Farm) and Environmentally Relevant
          Activity (ERA 4 — Poultry Farming) at 136 Top Forestry Road, Ridgewood requesting the
          applicant provide additional information on the proposal.
          The purpose of this report is to summarise the additional information received and provide a
          further assessment.
          EXECUTIVE SUMMARY
          Since council's Ordinary Meeting of 14 November 2013 officers met with the applicant to
          discuss Council's request for additional information and associated issues with the proposed
          poultry farm. Further written details were subsequently provided by the applicant on 2
          December 2013, including advice that the maximum number of birds proposed is 235,554;
          further details of traffic movements; revised odour modeling, and confirmation that some
          additional upgrades to Top Forestry Road would be undertaken.
          Review of the additional information provided by the applicant concludes that there are still a
          number of unanswered issues surrounding the proposed poultry farm including:
              « The odour report fails to take into account a nearby receptor (house), and does not
                Satisfactorily resolve odour issues for a number of houses currently owned by the
                 applicant. The odour modelling also does not address the manure spreading but
                simply proposes some management measures for control of the expected odour.
              « The traffic details identify that truck movements will be less than officers identified in
                the previous report to council, with these numbers unable to be fully verified by
                Officers in time for the Ordinary meeting. Notwithstanding this the number of heavy
                vehicles submitted by the applicant remains significant and will adversely impact on
                the road safety of Top Forestry Road and for the amenity of residents living along the
                proposed travel route
              « Loading of the live birds is proposed to commence at 2.30am but no details have
                been provided of the number of vehicles that will travel to and from the site at this
                 time.
              « Sealing of Top Forestry Road is now proposed within 50 metres of all houses and an
                 Infrastructure Agreement is proposed with council for half the cost of the worst bend
                on Top Forestry Road. Council's traffic engineer considers the existing road sufficient
                to cater for the existing use and that the necessary road improvements ought to be
          Sunshine Coast Regional Council                      OM Updated Page 5 of 26

                                                                                         Page 50 of 145

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 51 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                16 September 2014

                                                                              ATTACHMENT 1

        ORDINARY MEETING UPDATED REPORT                        12 DECEMBER 2013
             undertaken by the poultry farm operator and not council. Further, the proposed
             improvements are not adequate to cater for the number of heavy vehicle movements
             likely to be generated and no Infrastructure Agreement has been provided by the
              applicant.
           « No additional stormwater details have been provided to demonstrate that the water
              Quality of nearby creeks will not be adversely impacted upon. Notwithstanding this it
             is considered that this specific matter could be addressed by suitable conditions.
        It is concluded that the additional information provided by the applicant does not satisfactorily
        address officers concerns with the proposed poultry farm and therefore officers confirm their

        OFFICER RECOMMENDATION
        That Council Refuse Application No. MCU12/0184 for a Development Permit for
        Material Change of Use for Animal Husbandry Type 2 — Intensive (Poultry Farm) and
         Environmentally Relevant Activity (ERA 4 - Poultry Farming), situated at 136 Top
        Forestry Rd, Ridgewood for the following reasons:
                 i. the proposed poultry farm does not comply with the Overall Outcomes
                   of The Noosa Plan's Mary River Catchment Locality, Agricultural Uses
                   and Transport, Roads and Drainage Codes
                 li. the proposed poultry farm does not achieve sufficient separation
                   distance from surrounding residents so as to avoid adverse odour
                   impacts on residents’ amenity, with insufficient details provided on the
                   emissions from manure stockpiles, manure spreading, and for one of the
                    closest sensitive receiver locations
                iii. the proposal will have unacceptable impacts on the safety of Top
                    Forestry Road and the proposed road improvements are not sufficient to
                   provide the necessary safe environment
                iv. traffic generated by the development proposed will have significant
                   adverse impacts on the amenity of residents, given Top Forestry Road is
                   unsealed and bird collection is likely to be through the night and
                 v. The proposed sheds and earthworks necessary for shed construction is
                   likely to adversely impact on the scenic amenity of the area, as the
                   applicant has not demonstrated that they will integrate satisfactorily with
                   the landform and landscape.

         FINANCE AND RESOURCING
         If council were to approve this development, the applicant would be required to pay
         infrastructure charges for trunk infrastructure.
        Council's Infrastructure Policy Branch has provided the following estimate of the
         infrastructure charges required by this development:

        Sunshine Coast Regional Council                   OM Updated Page 6 of 26

                                                                                     Page 51 of 145

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 52 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   16 September 2014

                                                                                 ATTACHMENT 1

           ORDINARY MEETING UPDATED REPORT                           12 DECEMBER 2013

            ee
            infrastructure networks
           [Public Parks & Land for Community Faciities            |         $27,648,
           [TOTAL (June 2013index)=                                |S       8184320)
            PROPOSAL
           The application seeks approval for a Material Change of Use for Animal Husbandry Type 2 —
           Intensive (Poultry Farm) and Environmentally Relevant Activity (ERA 4 - Poultry Farming),
           situated at 136 Top Forestry Rd, Ridgewood.
           The development involves the construction of 8 x 100m to 130m long x 16m wide sheds
           along the ridgeline of the site, and proposes to carry in the order of 235,554 birds at any one
            time. This is a reduction to the number of birds previously proposed of between 250,000 —
           300,000 birds. The applicant indicates the process involves rearing day old chicks to
           chickens for a period of 6-9 weeks, before being removed from the site for chicken meat
           production (batch cycle).
           Feed for the birds, is brought onto the site throughout the batch cycle by 19m B-doubles with
           deliveries generally made between Sam to 4pm and focused mostly during the first half of the
           batch cycle (weeks 1-5). The grown chickens are then removed from the site during weeks
            5 - 8 commencing at 2:30am when the birds are less active.
           The applicant proposes that upon completion of the bird growing cycle, the sheds are
           cleaned out and prepared for the next batch cycle over a 1 - 2 week period. Spent litter from
           the sheds is proposed to be stockpiled within 2 bunded areas for a period of 4 to 5 weeks,
           before being spread onto the existing avocado orchard. The bunded areas have a total lineal
           distance of 300m x 20m wide and are located adjacent to the proposed sheds.
            A Preliminary Operational Management Plan has been prepared by the applicant to address
           the operation of the proposed poultry farm and the existing avocado farm.
            Background
           The location of the subject site in relation to its surrounds is shown on the image below:

           Sunshine Coast Regional Council                      OM Updated Page 7 of 26

                                                                                         Page 52 of 145

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 53 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        16 September 2014

                                                                                      ATTACHMENT 1

         ORDINARY MEETING UPDATED REPORT                              12 DECEMBER 2013

                  ‘                    ‘          369                          ‘

                                                all                              >
                                               ‘:           Ne
                                                   re                )
                                              Subjeqs Site    1.   f
                              State Forest                  2     y            -

                                                     Pre

         At its Ordinary Meeting on 14 November 2013 council deferred consideration to the next
         Council meeting and requested the applicant provide the following additional information:
           1. total vehicle trips including details of size of vehicles, purpose of trip, time of trip and
             number of trips per day
          2. feasibility of requirements to provide to seal to 50m in front of affected properties on Top
             Forestry Road or to enter into an infrastructure agreement with council
          3. composting and stockpiling methodology including data on management of emissions
             during these processes
          4. water quality management particularly addressing potential impacts from use of shed
             waste and composting material for fertilising the orchard and any associated run off and
          5. feasibility on reduction of size and number of sheds.
          A meeting was held with the applicant and their consultants on the 20 November, to discuss
         Council's request for further details and officer's concems, including the following:
             * Council's odour consultant's concerns with the odour modelling undertaken of the
                proposal.
             e  A revised table to be provided, similar to the table included in the officer's report to
                council, clearly detailing the likely maximum vehicle/trip numbers including vehicle
                types on a weekly and daily basis, including travel times.
             e Evidence of maximum number of birds able to be transported on a single truck at the
                different growing stages.
             e Review and provide further details of the likely upgrading requirements for Top
                Forestry Rd, similar to the details provided for the internal driveway to ensure Top
         Sunshine Coast Regional Council                         OM Updated Page 8 of 26

                                                                                              Page 53 of 145

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 54 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     16 September 2014

                                                                                   ATTACHMENT 1

         ORDINARY MEETING UPDATED REPORT                            12 DECEMBER 2013
               Forestry Road achieves the necessary safe environment, including consideration on
               sealing and road widening to allow two trucks to pass one another.
             « Confirmation of the maximum number of birds to be kept in the sheds with
               consideration given to reducing the number of chickens on site.
         The applicant provided a formal response to the request for additional information on the 2
         December 2013. An assessment of the additional information is provided below.
          ASSESSMENT
             1. Total vehicle trips including details of size of vehicles, purpose of trip, time of
               trip and number of trips per day.
         The applicant has provided a revised table of the daily vehicle movements, including the type
         of vehicles, purpose of the trip and travel times, which is included as Attachment 1.
         The revised table has been updated to reflect the proposed maximum number of birds as
         235,554 and indicates that delivery of feed will be spread over additional days, concentrated
         in the first half of the 9 week batch cycle (weeks 1 — 5) and so avoid live bird pick up times
         towards the end of the batch cycle (weeks 5-8). The applicant's revised table also indicates
         that feed deliveries will now be spread over 16 days, with up to 4 heavy vehicle trips for feed
         deliveries proposed in any one day. Live bird pick up will now be spread over 5 days for
         each batch cycle, with between 20-26 heavy vehicle trips using the road from 2:30am
          onwards.
         The proposed trip numbers detailed in the applicant's revised table differs significantly from
         the information previously provided to council by the applicant for feed deliveries and
         information gained by officers from the industry and council's odour consultant.
         Notwithstanding this, Council's Traffic Engineer confirms that even with the revised traffic
         movements, the planned traffic demand will still require significant improvements to Top
         Forestry Road, so as to ensure the safety of Top Forestry Road. The proposed pick up times
         for live birds similarly still raises significant amenity concerns for residents, particularly for
         those residents living along the travel route through the residential streets of Cooroy.
             2. Feasibility of requirements to provide to seal to 50m in front of affected
                properties on Top Forestry Road or to enter into an infrastructure agreement
               with council.
          A plan has been prepared by Callaghan & Toth Engineers showing Top Forestry Road to be
         sealed within 50m of adjacent dwellings. The plan includes 5 sections of the road to be
         sealed, totaling 381m of the existing 1.3km travel route on Top Forestry Road. The applicant
         indicates they are willing to accept a condition for the sealing of these sections, subject to a
         subsequent Operational Works approval.
         The applicant also concedes that the existing road bend located adjacent to 111 and 124
          Top Forestry Road is of insufficient width to accommodate two trucks to pass. A concept plan
         has been provided including widening of the road formation, with stone pitched retaining
         walls on each side of the road. A copy of the proposed works is included as Attachment 2.
         The applicant considers the current situation is inadequate for the existing traffic usage and
         seeks Council to enter into an infrastructure agreement to pay a contribution of 50% of the
         cost for improvements to Top Forestry Road at this bend. No details as to the cost of road
         improvements have been submitted or a signed Infrastructure Agreement.

         Sunshine Coast Regional Council                       OM Updated Page 9 of 26

                                                                                          Page 54 of 145

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 55 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014

                                                                               ATTACHMENT 1

        ORDINARY MEETING UPDATED REPORT                            12 DECEMBER 2013
        Council's Traffic Engineer advises that the current width of the road is sufficient for its
        predominantly rural residential use and is being maintained by council twice a year, as a
        designated school bus route and therefore all necessary improvements shouki be
         undertaken by the applicant and not council. Council's Traffic Engineer also advises that the
        road improvements offered by the applicant are not considered suitable to cater for the
         number of heavy vehicles expected to be generated by the poultry farm. In order for the
        safety and amenity concerns to be properly addressed, Council's Traffic Engineer
        recommends Top Forestry Road be sealed for its entire length and the road widened to allow
        two trucks to pass one another.
        Infrastructure agreements allow local governments and developers to negotiate and agree on
        specific arrangements for the infrastructure networks that support developments. The
        process for negotiating an infrastructure agreement must be undertaken prior to issuing a
        development approval, in order to ensure the works are secured. In regard to the
        infrastructure agreement proposed by the applicant, it is not appropriate for Council to enter
        into an agreement without any details as to the scope and cost of the works.
            3. Composting and stockpiling methodology including data on management of
               emissions during these processes
        The applicant's consultant performed further odour modeling of the sheds and litter
        stockpiles only, with no modeling undertaken for the manure spreading, instead proposing a
         number of management techniques to minimise the potential for odour nuisance. The further
        modeling results in a much larger odour footprint than that which was originally submitted
        with the application. The modeling results are included as Attachment 3.
        During the review of the most recent modeling, it was identified that a sensitive receptor was
        not included. This missed receptor is located at 185 Top Forestry Road, and is 750m to the
        south of the subject site (see Attachment 3) and it appears the receptor maybe within the
         2.5 odour limit modeled. Accordingly council's odour consultant advises that the actual
        concentration at this sensitive receptor is uncertain and should therefore be analysed further.
        The odour modeling considers the cumulative impacts of the shed and stockpiling area
         (assuming good management of both), but no modeling has been undertaken to assess the
        impacts associated with spreading of the manure. While modeling of the manure spreading
        was not considered feasible by the applicant, council's odour consultant describes other
        cases where spreading has been modeled to determine the impacts. The modeling of
        spreading could lead to a situation where the predicted odour impacts increase and the 2.5
        odour limits are not met for a number of nearby houses.
        Council's consultant comments that the proposed management measures to control the
        risk of adverse off-site odour impacts. However, the management measures are likely to be
         onerous for ongoing poultry farm operations and difficult to enforce by councdl.
        The applicant acknowledges that several properties owned by themselves are adversely
        impacted upon by the odour associated with the development. To address this issue, the
        applicant proposes the inclusion of the following condition:
           The poultry farm can only operate as long as Lots 20 & 22 on SP 226606, Lot 1 on SP
            100788 and Lot 204 on RP892484 are owned and occupied by the operator or an
            employee of the poultry farm. in the event that the lands are not owned and occupied by

                                                                                      Page 55 of 145

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 56 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 16 September 2014

                                                                               ATTACHMENT 1

        ORDINARY MEETING UPDATED REPORT                            12 DECEMBER 2013
        Council's Traffic Engineer advises that the current width of the road is sufficient for its
        predominantly rural residential use and is being maintained by council twice a year, as a
        designated school bus route and therefore all necessary improvements shouki be
         undertaken by the applicant and not council. Council's Traffic Engineer also advises that the
        road improvements offered by the applicant are not considered suitable to cater for the
         number of heavy vehicles expected to be generated by the poultry farm. In order for the
        safety and amenity concerns to be properly addressed, Council's Traffic Engineer
        recommends Top Forestry Road be sealed for its entire length and the road widened to allow
        two trucks to pass one another.
        Infrastructure agreements allow local governments and developers to negotiate and agree on
        specific arrangements for the infrastructure networks that support developments. The
        process for negotiating an infrastructure agreement must be undertaken prior to issuing a
        development approval, in order to ensure the works are secured. In regard to the
        infrastructure agreement proposed by the applicant, it is not appropriate for Council to enter
        into an agreement without any details as to the scope and cost of the works.
            3. Composting and stockpiling methodology including data on management of
               emissions during these processes
        The applicant's consultant performed further odour modeling of the sheds and litter
        stockpiles only, with no modeling undertaken for the manure spreading, instead proposing a
         number of management techniques to minimise the potential for odour nuisance. The further
        modeling results in a much larger odour footprint than that which was originally submitted
        with the application. The modeling results are included as Attachment 3.
        During the review of the most recent modeling, it was identified that a sensitive receptor was
        not included. This missed receptor is located at 185 Top Forestry Road, and is 750m to the
        south of the subject site (see Attachment 3) and it appears the receptor maybe within the
         2.5 odour limit modeled. Accordingly council's odour consultant advises that the actual
        concentration at this sensitive receptor is uncertain and should therefore be analysed further.
        The odour modeling considers the cumulative impacts of the shed and stockpiling area
         (assuming good management of both), but no modeling has been undertaken to assess the
        impacts associated with spreading of the manure. While modeling of the manure spreading
        was not considered feasible by the applicant, council's odour consultant describes other
        cases where spreading has been modeled to determine the impacts. The modeling of
        spreading could lead to a situation where the predicted odour impacts increase and the 2.5
        odour limits are not met for a number of nearby houses.
        Council's consultant comments that the proposed management measures to control the
        risk of adverse off-site odour impacts. However, the management measures are likely to be
         onerous for ongoing poultry farm operations and difficult to enforce by councdl.
        The applicant acknowledges that several properties owned by themselves are adversely
        impacted upon by the odour associated with the development. To address this issue, the
        applicant proposes the inclusion of the following condition:
           The poultry farm can only operate as long as Lots 20 & 22 on SP 226606, Lot 1 on SP
            100788 and Lot 204 on RP892484 are owned and occupied by the operator or an
            employee of the poultry farm. in the event that the lands are not owned and occupied by

                                                                                      Page 56 of 145

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 57 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                16 September 2014

                                                                              ATTACHMENT 1

        ORDINARY MEETING UPDATED REPORT                          12 DECEMBER 2013

            e The applicant seeks that council enter into infrastructure agreement for 50% of the
              cost to upgrade the most critical bend on Top Forestry Road. No infrastructure
              agreement has been provided or any details of the likely scope and cost of the works.
            « The proposed trip numbers detailed in the applicant's revised table differs significantly
              from the information previously provided to council by the applicant for feed deliveries
              and information gained by officers from the industry and council's odour consultant
               including:
                 © Max Watterson & Associates 5/11/13 — maximum 3,960 and minimum of
                    3,210 birds per truck
                 © MWA Environmental attachment 6/11/13 — calculates 5312 birds per truck
                 © Hayes Traffic Engineering attachment example — calculates 5,633 birds per
                    truck
                 © MWA Environmental attachment 6/11/3 — maximum of 154 feed deliveries in
                    one cycle
                 © Max Watterson & Associates advice on site meeting with councillors —
                    maximum of 12 trips in any one day
                 © Max Watterson & Associates 2/12/13 average number of birds per truck 5,011
                   and maximum of 26 trips in any one day
                 © Max Watterson & Associates 2/12/13 maximum of 52 feed deliveries in one
                    cycle.
              Officers have not been able to establish satisfactorily in the time permitted the
              accuracy or otherwise of the information now supplied by the applicant.
        Previous Council Resolution
        Ordinary Meeting — 14 November 2013 (Council Resolution OM13222)
        ITEM 7.2.1 DEVELOPMENT APPLICATION FOR ANIMAL HUSBANDRY TYPE 2
                    INTENSIVE (POULTRY FARM) AT 136 TOP FORESTRY ROAD,
                    RIDGEWOOD
        That Council defer consideration of application No. MCU12/0184 for a Development Permit
        for Material Change of Use for Animal Husbandry Type 2 — intensive (Poultry Farm) and
        Environmentally Relevant Activity (ERA 4 - Poultry Farming). situated at 136 Top Forestry
        Rd, Ridgewood to the next Council meeting and request the applicant to provide the

          1. total vehicle trips inchading details of size of vehicles, purpose of trip, time of trip and
            number of tnps per day
          2. feasibility of requirements to provide to seal to 50m in front of affected properties on Top
           Forestry Road or to enter into an infrastructure agreement with council
          3. composting and stockpiling methodology including data on management of emissions
           during these processes
          4. water quality management particularly addressing potential impacts from use of shed
           waste and composting material for fertilising the orchard and any associated run off and
          5. feasibility on reduction of size and number of sheds.

                                                                                     Page 57 of 145

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 58 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                16 September 2014

                                                                           ATTACHMENT 1

      ORDINARY MEETING UPDATED REPORT                          12 DECEMBER 2013

         e The applicant seeks that council enter into infrastructure agreement for 50% of the
           cost to upgrade the most critical bend on Top Forestry Road. No infrastructure
           agreement has been provided or any details of the likely scope and cost of the works.
         « The proposed trip numbers detailed in the applicant's revised table differs significantly
            from the information previously provided to council by the applicant for feed deliveries
           and information gained by officers from the industry and council's odour consultant
            including:
               © Max Watterson & Associates 5/11/13 — maximum 3,960 and minimum of
                  3,210 birds per truck
               © MWA Environmental attachment 6/11/13 — calculates 5312 birds per truck
               © Hayes Traffic Engineering attachment example — calculates 5,633 birds per
                  truck
               © MWA Environmental attachment 6/11/3 — maximum of 154 feed deliveries in
                 one cycle
               © Max Watterson & Associates advice on site meeting with councillors —
                  maximum of 12 trips in any one day
               © Max Watterson & Associates 2/12/13 average number of birds per truck 5,011
                 and maximum of 26 trips in any one day
               © Max Watterson & Associates 2/12/13 maximum of 52 feed deliveries in one
                  cycle.
           Officers have not been able to establish satisfactorily in the time permitted the
           accuracy or otherwise of the information now supplied by the applicant.
      Previous Council Resolution
     Ordinary Meeting — 14 November 2013 (Council Resolution OM13222)
      ITEM 7.2.1 DEVELOPMENT APPLICATION FOR ANIMAL HUSBANDRY TYPE 2
                  INTENSIVE (POULTRY FARM) AT 136 TOP FORESTRY ROAD,
                  RIDGEWOOD
      That Council defer consideration of application No. MCU12/0184 for a Development Permit
      for Material Change of Use for Animal Husbandry Type 2 — intensive (Poultry Farm) and
      Environmentally Relevant Activity (ERA 4 - Poultry Farming). situated at 136 Top Forestry
     Rd, Ridgewood to the next Council meeting and request the applicant to provide the

        1. total vehicle trips inchading details of size of vehicles, purpose of trip, time of trip and
          number of tnps per day
       2. feasibility of requirements to provide to seal to 50m in front of affected properties on Top
         Forestry Road or to enter into an infrastructure agreement with council
       3. composting and stockpiling methodology including data on management of emissions
         during these processes
       4. water quality management particularly addressing potential impacts from use of shed
         waste and composting material for fertilising the orchard and any associated run off and
       5. feasibility on reduction of size and number of sheds.

                                                                                     Page 58 of 145

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014


                                                    Attachment 2




                                                      Page 59 of 145

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     16 September 2014


                                                   Attachment 2 cont.




                                                          Page 60 of 145

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     16 September 2014



                                                   Attachment 2 cont.




                                                          Page 61 of 145

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014



                                                    Attachment 3




                                                      Page 62 of 145

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 63 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
          PCC
       iy            ut                lil
       Be AE
       |  ULI      TL      HALE TIE HATH
      SUE TTR TUTTE
      |   IINNVOVO WANNUINE AQNVOVE UHENUUNG UUUANERO
      STAAL LUTTE
      3
      Te           TTA TTATTTTATE
          HIE HIE WHEL              TIE      UIA
                     LHL

      :            UATE                       TTT T
      |
      RAAT ITE
  e        ||| |||: Hy ALITA                      H
  3    5                                         Ji} | |
  a    .            Hy       ile             al Fel F diel
RU                TT                PA    A
 sc    Pe  |        I       dae         |      He
 i     7.          i        i         |        i
        4    ;      ale       a     t   :    1s  ‘
& 3    i  Hh                Aue                Hye
 f                     ETL) LEECH)  REESE)    TH =
ee     BBE)        UHH
 SBE UE UF

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 64 of 145

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     16 September 2014
 cs     —      — —                                     )

    ACETATE CATT A
  HI          UATE                          TE
   AEA EAE
  ft            e                                  3
  JANA ARETE UTA
  ATARI
  TERISTIC

  HARLECH

  UAE LEAT                                            §
       |        R   :   ele      i         ei ae , ;   }
       eH ATE    | ESE           3        HAA | TE
   iN              WANG         GGAVTIUD  HTT
     itt               |                              ?
      tT :     5       j 5
     ma                                               |
                :      “15                            =
  HTH AH             =H Ae Bere           HH          3
          |                          |                %
            ; I                                       :
                                          :           .  Page 64 of 145
—

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014


                                                    Attachment 4




                                                      Page 65 of 145

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA    16 September 2014


            Attachment 5 – PROPOSED UPGRADING TO TOP FORESTRY RD




                                                        Page 66 of 145

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 67 of 145

u
                        .    3        rc                                pe                                                                                                                                                                  8                            >
                          Oe         i                                       i                                                                                                                                                              8                            z
                    ,         2      /                                                           ~~.                                DESIGN SURFACE                                                                                          2                            Zz
                          hae) =    Sante:                                    i                         Se                          EXISTING SUBFACE                                                                                             f                       2
                      ames                                     .                                               “ew                  EARTHWORKS (CUT) TO PROMIDE FORMATION                                                         2                                      oO
                     if       Q                                             j                                       ~                WIOTH AND RE-INSTATE TABLE OR4N                                                              =
                              mm                                 :                                                      Ny          AENSTATED TABLE DRAN — tm MDE, 0.5m DEEP                                                      S          i                           Re
                               aA                             4                                                           A                                                                                                      S
                        “Fl     .       E   ’                                                            is)                  \                                                                                                  g          i   l                        Oo
                                     ape                                                                      3                 i                                                                                               al{    |    f                            a
                                75 a        Bop         3              Re,                                                                                                                                                                  i
                                                                        :                                                          \
                      TOP FORESTRY ROAD           ed                   oe                                                           \ ROAD WIDENING — TOTAL FORMATION WDTH VARIES                                                           !                            >
                                                5                            ad                                                      WIN. S.Sm (STRAIGHTS) WAX. 7.5m (CLIVE WDEMNG)                                                                                      2
                                                              iS          C                                                            .                                                                                                                                 n
                          %                    a       s                 af                                                               ——                                 ee                                                              4
                                                             Se                                                                                                                    ~S                                                                                    >
                                                             eis)       a                                                                                                                  A                                        j   d                                Oo
                       —                                  r x               cl                                                                     TYPICAL CROSS SECTION                     NL                                                                          2
                      EXCAVATE INTO EMBANKMENT (LHS IN.   [fe                                                                                                                                       NA                              lf     y                             oO
                      DIRECTION OF CHAINAGE) TO PROVIDE   [a   Fi                                                                                                                                       ~                           S                                    3
                      CARRIAGEWAY WIDTH, CURVE WIDENING        a                                                                                                                                                                    =
                      AND REINSTATE TABLE DRAINS.         ee                                                                                                                                                                                                             =
                                                                                                                                                                                                                           ;  /       i “4                               =
                                                                                                                                                                                                                                   i                                    mM
                                                                         .                                                                                                                                                         —                                     =
                                                                                                                                                                                                                       Ay |                                              ,
                                                                                                                                                                                                                   ie       A  0                                         a
                                                   _ DEVELOPMENT                                                                                                                                               .      ZF,                                                6
                                                                                                                                                                                                             .                                                           z
                                                                         .        a                 .                        :                   :                                        qaast?           <>»                                                           2
                                                                                                    TOP FORESTRY ROAD                                                                      aS                                                                            m
                                                                    _                               3                     =                                           Ts                                                                                                 3
                                              aE                                                   SEE                                                           A                                                  cu mbes mt so aL                                     S
                                          ,                    ——         SS                              =                       A         =                                   &
                                                             ;                  .                                                                                                                                   FoR HEAV VEHICLES TO PASS PASSENGER                  >
                                              .                                                                                                                                                                     VEHCLES SAFELY IN BOTH DIRECTIONS.

                        K.                               -sTURES  LEGEND            NOTES:                                                                                                                                                                               be
                                              REFER MR SD DMG 154) .                ' To here NUMBER 814101-Sk—001                                                                                                                                                       o
                                                                                     . FOR  OVERALL UPGRADE DETALS, REFER
 0                                            SiN POST            -                                                                                                                                                                                                      @O
 &                                                                  9          VY         >                                                                                                                                     CONCEPT                                 3
 O                                            CUT BATTER AND TABLE DRAIN k     r           —                                                                                                                                  ADVICE ONLY                               9°)
 o                                                                                         -                                                                                                                                                                             3
                                                                                                                                                                                                                                                                         a
                                  024 6 8 10m             0 20 40 60 Bom                                                        W. DONALD MILLIGAN PTY LID C/— GANTT LEGAL         (RK     LAMBERT & REHBEIN                          B14101-SK-002                      2
 ~                                                                                    =                                                                                              3                                                hie
S.                                “SOME 1250            “Sear 120                     ee ee ee                                  TOP FORESTRY ROAD - WIDENING DETAILS & TYPICAL SECTION) SRiHiieesme = RELREE
 —                                  SCE 1-250 (At)         SCALE 1:2000 (41)          INFRASTRUCTURE WORK ASSESSMENT            OPTION t         -                              | fermen           See eae                    ee a                                      ps3
 aS                F\sobalS14 790816101 rcaetrce beteet acta ve) tartchen!\804°0! SK 000 1407 =22. deg                                                                                                                                                                   -
 ol                                                                                                                                                                                                                                                                      A

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   16 September 2014




                                                      Page 68 of 145

v
                   =        4                                    ys                                                                                                                                                                   8                  >
                 iS                         .            ;         *                                                                                                                                                                 8°                  z
             “sae 2         j               .                     fe                    ~~                                  DESIGN SURFACE                                                              --t—-g----+          3       e                   <
                 i az,     j              ,                       : }                           SS                          EXISTING SURFACE                                      To RE LoeTED 20m by ADaUCE !            i                {             a
             Se,   | >                                              f                                  ~                    EARTHNORKS (CUT) TO PROVIDE FORMATION                  (SHOW. KORATVELY OW PLAX)                 3                           QM
              mS                                   i               j                                        ~               WITH AND RE-INSTATE TAELE.O3AIN                                                               iS
                    ae                                  5                                  &                    74          SEANSTETED TABLE DORAN — 1m WOE, 0.5m DEEP                                  |                 12          i                  ge
                    ee                        cess                                                                                                                                                      1                 le           {                 oO
                S|        tee Se                        ae       ;                               1.333                ‘\                                                                                          ia                  f                  wD
                                  eRe, x Ps                Ma    ‘                                    '                 ‘A                                                                                                           ;                   @
                                   ade:                        &                                                           ,                                                                            |                        r
             TOP FORESTRY              ea               a  ees                                                              \\ gown wDeNING — TOTAL FORWETION WOTH VARIES                               |__=we          |                                <
                   .                  4                 5           ;                                                          .       MIN. 5.5m — WAX 7.0m                                                                                              a
                    '                       4         i] o      “-                                                                                                                                                                                       >
                .                     ce    RE                                                                                                                           a                                     ey                                        =
                                                               .                                                                  —                    ~                                                                             Ir
                      ‘                     2%,            ae
                                                  Res)         a                                                                        TYPICAL CROSS SECTION                  yA                                                                        Q
                                                Pe       |           :                                                                  ON CURVE APPROACHES                           ~                          R1-28
            Cee)                                 k 4               od                                                                                                                   r ~                                        I                     QO
             EXCAVATE INTO EMBANKMENT (LHS IN fe                                                                                                                                             ~                                       y                   Oo
             DIRECTION OF CHAINAGE) TO PROVIDE  k   iw a                                                                                                                                                         Re                                      =
             CARRIAGEWAY WIDTH, CURVE WIDENING       YA '                                                                                                                                                                                                =
             AND REINSTATE TABLE DRAINS.         ee!                                                                                                                                                                ids          :                       =
                                                 7 as                                                                                                                                                       “a”    tf       o
                                                                                                                                                                                                       Yo          é              Y                      qj
                                                                                                                                                                                              us                f§        fy                             m
                                                                                                                                                                                                   UL            4                :                      m
                                                                                                                                                                                             ss                /           i
                                                                                                                                                                                          “*       ig         4          Ay                              =
                                                                :                                                                                                                    Ug Baa
                                                                                                                                 ~                                                a       pean            yy,         VA                                 a
                                                                                                                                                                             A      ety               IP                                                 q
                                                                                                                                                                       a        Oey * /             ee         / yy                                      Zz
                                                                                                                                =                                                Se                         Y                                            a
                                                                                                                                                             ae           _----0              5           F           /                                  >
                                          - DEVELOPMENT                                                                                                  stro               .      ;                A                                                    M
                                                                :        .                                                               ‘                  b         se                    oo                                                           m
                                                                                           :                         7                                                    |        ae                                                                    S
                                                                                            TOP FORESTRY ROAD                                                                   a                                                                        >
                                                                     en                    :                      R 507.990                       a             TT            .
                                 .                     Ss         =      SS                                    -   _——_              =
                                    re             :                                          :        SES                                                   o                                               ONE way TRAFFIC SECTION OF CURVE.
                                                                       .                                                                                                                                     PAVEMENT WIDTH THROLCH CURVE IS” &.5m
                                                                                                                                                                                                            TO ALLOW POR A 19m ARTICULATED VEHCLE
                                                                                                                                                                                                             SWE=T PATH IW 30TH DIRECTION OF TRAVEL
                ;                                                                                                                                                                                                                                        e
                                                                                                                                                                                                                                                         o
                                                                                                                                                                                                                                                         wn
 vu           .    .                PROPOSED FEATURES LEGEND               NOTES:                                                                                                                                                                       3s
 2                                                                         1. FOR OVERALL UPGRADE DETHLS, REFER                                                                                                                                          >
e                                   Crohn moe me         ©                    To SKETCH NUWBES 814701—Sk-008                                                                                                                                             @
 o                                  SIGN POST            -                                                                                                                                                                                               3
 ©                                                                    ~                                                                                                                                                                                  a
 a                                                         9                      7                                                                                                                                       CONCEPT                        ®
 ss                                 CUT BATTER AND TABLE DRAN +        i           =                                                                                                                                   ADVICE ONLY                       N
 E                                                                                                                                                                                                                                                       3
                                                                             =                                        Fimo mmm o-amoa                                   |     (ABER                  EnRE                      a
 a                       024 6 8 10m             0 20 40 60 Bt                                                          ¥             GAN PIF 230 &/°                      (KR        Meee        ction                        B14101-SK-003             -
                          SCALE 1.250 (At)        SCALE 1:2000 (41)          PROPOSED POULTRY FARM                      TOP FORESTRY ROAD - WIDENING DETAILS & TYPICAL SECTION] S&iiiecsme  BEML EIES        &               [eto     en]
                                                       :                     INFRASTRUCTURE WORK ASSESSMENT             OPTION 2                                           anagem           ge                                    oe
         Fibs Ld VOR TL TT veer btevetee tac! etches AT eS Thetis Ot her

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                             16 September 2014


3                        APPLICATION FOR MATERIAL CHANGE OF USE - MULTIPLE HOUSING TYPE 4
                         CONVENTIONAL (4 UNITS) AND ASSOCIATED OPERATIONAL WORKS
                         SITUATED AT 28 NANNYGAI STREET, NOOSAVILLE MCU14/0051 & OPW14/0274
DOCUMENT INFORM AT ION




Author                           Development Planner, Jack Lewis
                                 Planning & Infrastructure Department

Index                            ECM / Application / MCU14/0051 & OPW14/0274

Attachments                      1.   Locality Plan
                                 2.   Proposal Plans



         APPLICATION DETAILS

         Applicant                          Tu Projects

         Proposal                           Development Permit for Material Change of Use – Multiple Housing
                                            Type 4 Conventional (4 Units); and
                                            Development Permit for Operational Works (Vehicle Crossover,
                                            Landscaping, Drainage Works and Carparking)

         Properly Made Date                 30 June 2014

         Information Request Date           Nil

         Decision Due Date                  26 September 2014

         Number of Submissions              2 Properly Made


         PROPERTY DETAILS

         Property Address                   28 Nannygai Street, Noosaville

         RP Description                     Lot 1 on RP153307
                                                     2
         Land Area                          1,619m

         Existing Use of Land               Disused industrial shed


         STATUTORY DETAILS

         SEQRP Designation                  Urban Footprint

         Locality                           Noosaville

         Zone                               Semi Attached Housing

         Overlays                           Natural Hazards (Min Floor Height & Potential Acid Sulphates)

         Assessment Type                    Impact




                                                                                                  Page 69 of 145

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 16 September 2014 regarding Application No. MCU14/0051 and
OPW14/0274 for Development Permits for Material Change of Use for Multiple Housing
Type 4 Conventional (4 units) and Operational Works situated at 28 Nannygai Street,
Noosaville; and
A.    Approve the applications in accordance with the following conditions:
Development Permit for Material Change of Use for Multiple Housing Type 4
Conventional (4 units)
PLANNING
     When Conditions must be Complied With
1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
     prior to the use commencing, and then compliance maintained at all times while the
     use continues.
     Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are listed in the following
     table unless otherwise amended by these conditions.
      Plan No.           Rev.   Plan/Document Name                             Date
      4416SM Sheet 5     PA     Site Plan, prepared by I Want That Design      27 June 2014
      of 36
      4416SM Sheet 6     PA     Lower Floor Plans, prepared by I Want That     27 June 2014
      of 36                     Design
      4416SM Sheet 7     PA     Upper Floor Plans, prepared by I Want That     27 June 2014
      of 36                     Design
      4416SM Sheet 35    PA     3D Perspectives 1 of 2, prepared by I Want     27 June 2014
      of 36                     That Design
      4416SM Sheet 36    PA     3D Perspectives 2 of 2, prepared by I Want     27 June 2014
      of 36                     That Design
      1196-Sk01                 Driveway Layout, prepared by Contour           1 July 2014

3.   Development authorised by this approval must be undertaken generally in accordance
     with the Approved Plans listed within this Decision Notice.
     Building Height
4.   The maximum height of the development must not exceed 8 metres above the finished
     ground level and the natural ground level.
5.   Certification must be submitted to Council from a Licensed Surveyor which certifies
     that the buildings do not exceed the maximum height requirement of this Decision
     Notice.
     Landscaping
6.   The development site must be landscaped prior to the commencement of use. The
     works must be undertaken in accordance the works shown on the Approved Plans,
     except where amended by these conditions.
7.   4 x 45L street trees must be planted within the Nannygai Street frontage. The trees
     shall be located so as to allow for adequate sight lines, and be clear of existing and
     proposed services within the road reserve, including the footpath.


                                                                                  Page 70 of 145

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               16 September 2014


8.    All landscape works must be maintained generally in accordance with the approved
      design for the life of the development.
9.    All landscape works must be established and maintained in accordance with
      horticultural best practice with construction techniques that allow for healthy, sustained
      and vigorous plant growth. All plant material must be allowed to grow to full form.
      Performance Bond
10.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
      must be submitted to Council, to secure performance of all conditions of this approval,
      prior to the pre-start meeting. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by
      Council in respect of enforcing performance of this permit. Council reserves the right to
      call upon the bond or guaranteed sum to effect compliance with conditions.
      Building Appearance
11.   All air conditioning units or other mechanical equipment must be located at ground
      level, or otherwise fully enclosed or screened such that they are not visible from the
      street frontages nor adjoining properties.
      Fencing and Walls
12.   Any street fencing must be set back an average of 1 metre from the front property
      boundary. Any fencing on the front boundary must either:
      a.    not exceed a maximum height of 1.2m; or
      b.    be of open construction.
13.   The area of land between the fence and the front property boundary must be densely
      landscaped to screen any fencing from the street.
      Community Management Statement
14.   Any proposed Community Management Statement required for the development
      pursuant to the Body Corporate and Community Management Act 1997 must be
      submitted to Council for endorsement at the same time as submission of the Building
      Format Plan (or similar) to Council for compliance assessment.
15.   All clauses and by-laws of the proposed Community Management Statement must
      accord with the requirements of this Decision Notice
      Waste Management
16.   Refuse storage, removal and collection facilities must be provided in accordance with
      the following:
      a.    provision of a minimum of two 240L wheelie bins for each dwelling unit;
      b.    provision of separate bins for general and recyclable waste for each tenancy,
            with an equal number of each being provided; and
      c.    provision of a hardstand impervious area in accordance with the approved plan.
      Unitywater
17.   Reticulated water supply and sewerage must be provided to the development.
18.   Construction activities must not impede the access of Unitywater or Fire Brigade
      personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
19.   The fire-fighting demand on Unitywater’s water supply system from the development
      must not exceed 15 litres per second.




                                                                                    Page 71 of 145

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


20.   A single Unitywater installed primary water meter must be provided immediately inside
      the property boundary. Meters must be Unitywater approved, installed in accordance
      with Unitywater requirements and remain accessible at all times for reading and
      maintenance purposes.
21.   Sub meters must be provided at the boundary of each title to be administered by a
      body corporate.
22.   The existing 100mm diameter AC watermain within Nannygai Street must be replaced
      for the full frontage of the development site with DICL pipes. The replacement works
      must be completed prior to placing construction materials/site offices over or adjacent
      to the water main alignment.
23.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
      located within property boundaries in accordance with the SEQ standards. Easements
      shall be centred over the pipe. Easement terms shall be the most current registered
      dealing held by the Department of Natural Resources & Mines and shall not be altered
      or amended.
24.   Water meters must be located on alternative boundaries to electrical pillars.
25.   Buildings and other structures must maintain a minimum clearance of 1.5 meters from
      Unitywater sewer mains, and 1.0 meter from a sewer manhole chamber or sewer
      inspection opening.
26.   Storm water retention systems and gross pollutant traps must maintain a minimum
      clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure.
27.   The applicant must adjust the level of the existing sewerage inspection opening as
      necessary to suit the proposed finished levels. Work must be undertaken by
      Unitywater at the owner’s cost. Where the existing sewerage inspection opening point
      is located within a sealed or concreted parking area, a brass cap is required to be
      fitted.
28.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
      Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
      plants within these clearances must be low growing when mature, and suitable
      approved varieties.
29.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs
      associated with repair, replacement or alteration of infrastructure must be met by the
      applicant.
ENGINEERING
      External Works
30.   Nannygai Street must be upgraded for the length of its frontage to the subject site.
      The works must include in particular:
      a.   Construction of a pedestrian footpath in accordance with the conditions of this
           Decision Notice; and
      b.   Removal of the existing property accesses, stormwater outlet points and
           reinstatement of the kerb, footpath and verge area to match the balance of the
           site frontage, including the provision of topsoil and turf where the existing verge
           is grassed.
      This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
      non-trunk infrastructure.




                                                                                      Page 72 of 145

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


      Site Access and Driveways
31.   A sealed access driveway must be provided from Nannygai Street to all parking and
      manoeuvring areas of the development. The works must include in particular a
      driveway crossover in accordance with IPWEAQ standard drawing SEQ R-051with a
      maximum width of 6 metres at the property boundary.
      Car Parking
32.   A minimum of 9 car parking spaces must be provided and marked on the site. The
      works must include crossfalls, gradients and dimensions in accordance with Australian
      Standard AS2890: Parking Facilities
33.   All vehicles must enter and exit the site in a forward gear.
      Footpath
34.   A pedestrian and bicycle footpath must be provided for the development. The works
      must include in particular a 2.0 metre wide footpath within the road verge for the entire
      length of the site’s frontage to Nannygai Street. This condition is imposed pursuant to
      s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure.
      Stormwater Drainage
35.   The site must be provided with a stormwater drainage system connecting to a lawful
      point of discharge.
36.   All stormwater runoff from the site must be discharged in to Council’s kerb and channel
      drainage system in Nannygai Street.
37.   Approved kerb adapters must be constructed at each outlet point.
38.   Electricity and Telecommunication Services
39.   Unless otherwise stipulated by telecommunications legislation at the time of
      construction, the development must be provided with all necessary conduits, pits and
      pipes to accommodate the future connection of optic fibre technology
      telecommunications.
40.   Certification must be submitted to Council from all relevant service providers which
      certifies that the development has met the requirements of this Decision Notice and all
      applicable legislation at the time of construction.
      Earthworks and Retaining Walls
41.   All fill and associated batters must be contained entirely within the subject site unless
      written permission from the respective landowner(s) is provided to Council. All
      earthworks must be undertaken in accordance with the provisions of Australian
      Standard AS3798: Guidelines on Earthworks for Commercial and Residential
      Developments.
42.   Where the development involves excavation or filling over, or adjacent to, drainage,
      water supply or sewerage infrastructure, all access chamber surface levels must be
      adjusted to provide a freeboard of 100mm above the finished ground surface level.
      Damage to Services and Assets
43.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      a.    where the damage would cause a hazard to pedestrian or vehicle safety,
            immediately; or
      b.    where otherwise, upon completion of the works associated with the
            development.


                                                                                   Page 73 of 145

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               16 September 2014


Development Permit for Operational Works (Vehicle Crossover, Landscaping,
Drainage Works and Carparking)
OPERATIONAL WORKS
     Approved Plans
1.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are listed in the following
     table unless otherwise amended by these conditions.
      Plan No.             Rev.   Plan/Document Name                            Date
      1193-SK01                   Driveway Layout, prepared by Contour          1 July 2014
      1193-SK03                   Stormwater Management Plan, prepared by       7 July 2014
                                  Contour
      4416SM               PB     Stormwater Plan, prepared by I Want That      17 July 2014
                                  Design
      1193-SK04            A      Live Sewer Works Table                        2 Sept 2014
      CD-001               A      Cover Sheet Notes and Schedules, prepared     3 July 2014
                                  by DFS Group
      CD-002               A      External Works and Planting Plan, prepared    3 July 2014
                                  by DFS Group
      CD-003               A      Landscape Details, prepared by DFS Group      3 July 2014

2.   Development authorised by this approval must be undertaken generally in accordance
     with the Approved Plans listed within this Decision Notice.
     Prior to Commencement of Works
3.   Council must be contacted at least 5 working days prior to any works commencing to
     organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244.
     The pre-start meeting must include the relevant parties for the following aspects of the
     works:
     a.   Civil engineering works;
     b.   Erosion and sediment control works
4.   A Construction Management Plan must be submitted to Council prior to the pre-start
     meeting and must specifically address the following:
     a.   Traffic Management during all aspects of the construct phase including:
          i.      A Traffic Management Control Plan in accordance with Manual of Uniform
                  Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                  control measures prior to construction
          ii.     Maintenance of safe pedestrian access across the frontage of the site both
                  during daily construction and after daily construction has ceased
          iii.    Proposed fencing to the site during the construction phase of the
                  development
          iv.     Adequate parking arrangements for construction workers
     b.   Maintenance and protection of water quality and existing drainage lines through
          the construction site through the implementation of appropriate erosion and
          sediment control measures
     c.   Works programme identifying key components of the works and their respective
          durations




                                                                                   Page 74 of 145

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


      d.   Establishment of a communication protocol with the general public, adjoining
           owners, emergency services and local businesses to advise of agreed
           construction times, impacts on traffic and services and other relevant issues
5.    Any conflict between the development and an existing or proposed service must be
      referred to the relevant service authority for determination prior to commencement of
      works.
      During Construction
6.    The developer must meet any costs to repair damage to any Council asset during
      construction, where damage is a result of the development works. Damage to assets
      must be repaired immediately where it creates a hazard to the community. In
      circumstances where the damage does not create a hazard to the community, it must
      be repaired immediately on completion of the works associated with the development.
      A condition report including photographs of the frontage of the site should be
      completed and submitted to Council at the prestart meeting or prior to any works
      commencing (where no prestart meeting is to occur).
7.    All works must be supervised by a Registered Professional Engineer of Queensland
      (RPEQ) who is independent of the Developer and Principal Contractor, and they must
      certify that all works conform to the Operational Works permit. Where municipal works
      are involved, such confirmation must be submitted for the respective hold points prior
      to any site inspection by Council Officers.
8.    All works must be constructed and work procedure undertaken in accordance with:
      a.   The approved plans/documents and conditions detailed in this Decision Notice
      b.   All relevant Noosa Council Planning Scheme Policies, standard drawings,
           standard specifications and guidelines
      c.   The latest version of the Healthy Waterways document “Water Sensitive Urban
           Design Technical Design Guidelines for South East Queensland” for all water
           quality devices to be constructed on site
      Works Within Road Reserve/Reinstatement
9.    Safe pedestrian access on all streets in the vicinity of the development must be
      maintained at all times. Should footpath/road closures be necessary to carry out
      construction works, Council’s Engineering Officer must be notified prior to the
      proposed closure and all requirements complied with.
10.   All frontage works must match neatly with existing road and verge/footpath features.
      Additional works beyond the frontage may be required to provide an acceptable
      transition to existing road and verge/footpath profiles.
      Pathways
11.   All pathways must be constructed in accordance with the following requirements:
      a.   All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065.
      b.   All paths must have a slip resistant surface
      c.   Expansion and contraction joints must provide a flush finish. Installation of joints
           by saw cutting is preferred to ensure a smooth ride for cyclists
      d.   The required work includes any modifications to ensure the footpath finishes
           flush with all existing service covers and the like, or alternatively these services
           are raised or altered, so as not to create a pedestrian safety hazard




                                                                                   Page 75 of 145

Section 76

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  16 September 2014


12.   Pathways must:
      a.    terminate in a manner that ensures smooth transition to existing surfaces for
            public safety
      b.    be designed and constructed to comply with the Disability Discrimination Act
            (DDA), Access to Premises Standard, Austroads and relevant sections of
            AS1428 Design for access and mobility
      Site Access and Driveways
13.   Any existing unnecessary or redundant property accesses must be removed, and the
      kerb, footpath and verge area reinstated to match the existing footpath and/or verge
      treatments. Grassed verge areas to be reinstated must be provided with 100 mm
      topsoil and grass seed or turf, and must be maintained by the developer until
      established.
14.   The driveway must be constructed so as not to concentrate stormwater runoff onto
      neighbouring properties or cause ponding of water within the road reserve
      Earthworks
15.   The finished surface level of the site must be graded and shaped to ensure that all
      surface runoff is directed to Nannygai Street and not directed on to any adjoining
      property.
16.   All earthworks shall be undertaken in accordance with the provisions of AS 3798
      Guidelines on Earthworks for Commercial and Residential Development. Certification
      shall be provided by an RPEQ and submitted to Council the issue of the Certificate of
      Classification for the building.
      Service Conduits under Existing Road Features
17.   Electrical conduits or other services proposed to be installed under existing sealed
      carriageways, concrete pathways or concrete/sealed driveways must be installed by
      boring. Trenching is not permitted, unless specifically approved by Council.
      Erosion and Sediment Control
18.   Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
      must not be released from the site or to waters within the site, or be likely to be
      released should rainfall occur, unless all reasonable and practicable measures are
      taken to prevent or minimise the release and concentration of contamination.
19.   Erosion and sediment control measures must be installed and maintained to minimise
      erosion on the site and to minimise the export of sediment and associated pollutants
      from the site. The erosion and sediment control measures must be designed, installed
      and maintained in accordance with current best practice standards (refer to advisory
      notes).
20.   Prior to the issue of the Certificate of Classification, all site surfaces must be effectively
      stabilised using methods which have achieved effective short-term stabilisation and
      which will continue to achieve effective stabilisation in the medium to long-term (refer
      to advisory notes). For the purpose of this condition, an effectively stabilised surface is
      defined as one that does not, or is not likely to result in visible evidence of soil loss
      caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
      contamination.
21.   Any exposed areas must be effectively stabilised without delay and prior to rainfall
      occurring.




                                                                                       Page 76 of 145

Section 77

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                16 September 2014


      Supervision/Certification
22.   Upon completion of the work a certificate must be issued by an RPEQ certifying that
      the works have been constructed in accordance with the Operational Works permit.
23.   All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
      Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
      Maintenance’, the supervising RPEQ must submit to council:
      a.   certification that all works have been undertaken and completed in accordance
           with the requirements of this Permit
      b.   As Constructed details in accordance with Council’s Planning Scheme Policy
      c.   Maintenance and operational manuals for all proprietary devices
      As Constructed Plans
24.   Prior to acceptance of civil works to become Council assets “On Maintenance”, the
      lodgement of satisfactory “As Constructed” records must be submitted to Council. The
      “As Constructed” information must include:
      a.   Drawings and data certified by a qualified experienced Civil Engineer (RPEQ) for
           design intent, and certified by a Licensed Surveyor in regard to the cadastre and
           the location, level and type of all services and structures.
      b.   The data must be in accordance with Council’s (Noosa Plan) – Planning Scheme
           Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks,
           and Planning Scheme Policy 6 Engineering Design Standards – Water and
           Sewerage and fully detail levels for all engineering works including but not limited
           to drainage structures, finished ground levels and pavement surface levels.
      c.   The data must be submitted in hardcopy form and digital format (Asset Design
           and As Constructed (ADAC)) in GDA94 Zone 56 coordinate values. Guidelines
           on the use of ADAC are available at www.adac.com.au
      Landscaping
25.   The site must be landscaped in accordance with The Noosa Plan’s Planning Scheme
      Policy PSP 3 – Landscaping Plants and Guidelines.
      During Construction
26.   Landscape General - The following requirements apply to all landscape works:
      a.   All imported topsoil or ameliorated site soil complies with Australian Standard
           AS4419 and/or is appropriate for the proposed plant species.
      b.   All tree stock must conform to NATSPEC criteria as outlined in Specifying Trees:
           a guide to assessment of tree quality.
      c.   Mulch is to be aged, comprised of leaf and limb of varying sizes, free of foreign
           matter including, anthropogenic waste, rock, soil / sediment contamination and
           applied to ensure 100mm in depth.
      d.   All necessary measures must be taken to prevent fire ants (or any stages of the
           fire ants life cycle) entering the work site. If fire ants are suspected, the applicant
           must contact the Department of Primary Industries & Fisheries Call Centre on
           132523.
      e.   Landscaping must not obstruct overland flow paths and must include adequate
           drainage to minimise ponding. Mulch or any floatable material must not be
           located in swales or overland flow paths.




                                                                                      Page 77 of 145

Section 78

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               16 September 2014


      f.   Landscaping must not encroach onto kerb and channel, footpaths, pedestrian or
           vehicular / circulation areas.
      g.   Landscaping must not restrict access to service meters.
27.   Landscaping of Road Reserves - The following requirements apply to landscaping
      within road reserves:
      a.   Permanent ornamental lighting must not be installed within road reserve.
      b.   Permanent irrigation must not be installed on road reserve.
      c.   Vegetation must not be subjected to any hedging maintenance regime and must
           be allowed to grow to its natural form.
28.   Turf (verge): The applicant must ensure turf is in accordance with the following:
      a.   Turf species to be sustainable for local and design conditions without requiring
           irrigation.
      b.   Turf is easily accessible and navigable by ride-on mowers with cutting decks of
           2.1 metres wide.
      c.   Be free of rocks and debris.
      d.   Turf is rolled and joined smoothly and level with adjoining surfaces.
      e.   Turf is pest, weed and disease free.
      Following Construction
29.   Ongoing maintenance: The site must be maintained to aesthetically compliment the
      surrounding local area for the life of the development. The maintenance must include:
      a.   Regular mowing, weeding and fertilising of turf verge.
      b.   Replenishing of mulch to 100mm depth, fertilising and aeration of landscape
           areas.
      c.   Cleaning of all external surfaces including prompt removal of graffiti.
      d.   Replacement of dead or poorly performing plants.
      e.   Inspection and assessment of all vegetation such that it does not adversely
           affect adjoining property or pedestrians.
      f.   Remedial action if any vegetation poses a health or safety risk to site users or
           adjoining property.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.
UNITYWATER
      During Construction
30.   Water meters must be installed to each lot of the development in accordance with
      Unitywater requirements and SEQ Standard Drawings.
31.   Electrical pillars must be located on alternative boundaries to water meters.
32.   A minimum horizontal clearance of 1.0 metre must be maintained between stormwater
      pipes greater than 225mm diameter and Unitywater water supply or sewerage
      infrastructure.
33.   Stormwater filtration/retention systems and gross pollutant traps must maintain a
      minimum of 1.5 metres horizontal clearance from a sewerage main or sewer house
      connection point.



                                                                                      Page 78 of 145

The text continues on section 79.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.