PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
34. A minimum of 0.5 metres separation must be maintained between the outermost edge
of sewer access chambers or sewerage mains and the property boundary.
35. Easements of between 3 and 10 metres must be provided over all Unitywater sewers
located within property boundaries in accordance with the SEQ standards. Easements
shall be centred over the pipe. Easement terms shall be the most current registered
dealing held by the Department of Natural Resources & Mines and shall not be altered
or amended.
36. Proposed tree plantings must maintain a minimum horizontal clearance of 1.0 metre
from Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature and
suitable approved varieties.
37. During the maintenance period the applicant must carry out necessary repairs to:
defects and/or damage of road works; drainage and associated work; water supply
and sewerage reticulation and associated equipment. These repairs include damage
and/or alterations caused by third parties carrying out works within the development.
38. Construction works undertaken in the vicinity of Unitywater’s existing water supply or
sewerage infrastructure must not adversely affect the integrity of the infrastructure. All
costs associated with repair, replacement or alteration to existing infrastructure must
be met by the applicant.
Prior to issue of certificate of compliance
39. As Constructed drawings shall be lodged in both hardcopy and ADAC digital format in
GDA94 Zone 56 coordinate values. As constructed drawings will be required prior to
works being accepted On Maintenance. The GDA co-ordinates and AHD levels of all
permanent survey marks installed shall be provided. The surveyed location, meter
numbers and readings of water meters installed by the developer must be included in
the as - constructed information.
40. A water meter record sheet must be completed and submitted to Unitywater prior to
works being accepted on-maintenance.
41. Upon completion of the works a certificate must be issued by a RPEQ certifying that
the works have been constructed in accordance with Unitywater standards, and in
compliance with the approved plans and specifications. The works must be
supervised by the Engineer in a planned and timely manner to ensure the integrity of
the certification is upheld.
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. The proposal provides for a high level of residential amenity, consistent with the
surrounding development in the area and The Noosa Plan requirements for the
Semi Attached Housing zone;
2. The development is located within convenient access to the major road network
and surrounding shops; and
3. The proposed built form is equivalent to 2 duplex developments, which is
consistent with the permitted development on the site.
Page 79 of 145
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.