Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-09-16 Planning & Organisation Committee Agenda

of 141

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                16 September 2014


34.   A minimum of 0.5 metres separation must be maintained between the outermost edge
      of sewer access chambers or sewerage mains and the property boundary.
35.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
      located within property boundaries in accordance with the SEQ standards. Easements
      shall be centred over the pipe. Easement terms shall be the most current registered
      dealing held by the Department of Natural Resources & Mines and shall not be altered
      or amended.
36.   Proposed tree plantings must maintain a minimum horizontal clearance of 1.0 metre
      from Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
      Landscaping plants within these clearances must be low growing when mature and
      suitable approved varieties.
37.   During the maintenance period the applicant must carry out necessary repairs to:
      defects and/or damage of road works; drainage and associated work; water supply
      and sewerage reticulation and associated equipment. These repairs include damage
      and/or alterations caused by third parties carrying out works within the development.
38.   Construction works undertaken in the vicinity of Unitywater’s existing water supply or
      sewerage infrastructure must not adversely affect the integrity of the infrastructure. All
      costs associated with repair, replacement or alteration to existing infrastructure must
      be met by the applicant.
      Prior to issue of certificate of compliance
39.   As Constructed drawings shall be lodged in both hardcopy and ADAC digital format in
      GDA94 Zone 56 coordinate values. As constructed drawings will be required prior to
      works being accepted On Maintenance. The GDA co-ordinates and AHD levels of all
      permanent survey marks installed shall be provided. The surveyed location, meter
      numbers and readings of water meters installed by the developer must be included in
      the as - constructed information.
40.   A water meter record sheet must be completed and submitted to Unitywater prior to
      works being accepted on-maintenance.
41.   Upon completion of the works a certificate must be issued by a RPEQ certifying that
      the works have been constructed in accordance with Unitywater standards, and in
      compliance with the approved plans and specifications. The works must be
      supervised by the Engineer in a planned and timely manner to ensure the integrity of
      the certification is upheld.


B.    Find the following are sufficient grounds to justify the decision despite the conflict with
      the Planning Scheme:
      1.    The proposal provides for a high level of residential amenity, consistent with the
            surrounding development in the area and The Noosa Plan requirements for the
            Semi Attached Housing zone;
      2.    The development is located within convenient access to the major road network
            and surrounding shops; and
      3.    The proposed built form is equivalent to 2 duplex developments, which is
            consistent with the permitted development on the site.




                                                                                     Page 79 of 145
Log in to download the original file

2014-09-16 Planning & Organisation Committee Agenda(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.