Original source · versioned page text
2014-09-16 Planning & Organisation Committee Agenda
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
8. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
9. All landscape works must be established and maintained in accordance with
horticultural best practice with construction techniques that allow for healthy, sustained
and vigorous plant growth. All plant material must be allowed to grow to full form.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the pre-start meeting. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
Building Appearance
11. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
Fencing and Walls
12. Any street fencing must be set back an average of 1 metre from the front property
boundary. Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m; or
b. be of open construction.
13. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
Community Management Statement
14. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
15. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice
Waste Management
16. Refuse storage, removal and collection facilities must be provided in accordance with
the following:
a. provision of a minimum of two 240L wheelie bins for each dwelling unit;
b. provision of separate bins for general and recyclable waste for each tenancy,
with an equal number of each being provided; and
c. provision of a hardstand impervious area in accordance with the approved plan.
Unitywater
17. Reticulated water supply and sewerage must be provided to the development.
18. Construction activities must not impede the access of Unitywater or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
19. The fire-fighting demand on Unitywater’s water supply system from the development
must not exceed 15 litres per second.
Page 71 of 145
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.