PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
20. A single Unitywater installed primary water meter must be provided immediately inside
the property boundary. Meters must be Unitywater approved, installed in accordance
with Unitywater requirements and remain accessible at all times for reading and
maintenance purposes.
21. Sub meters must be provided at the boundary of each title to be administered by a
body corporate.
22. The existing 100mm diameter AC watermain within Nannygai Street must be replaced
for the full frontage of the development site with DICL pipes. The replacement works
must be completed prior to placing construction materials/site offices over or adjacent
to the water main alignment.
23. Easements of between 3 and 10 metres must be provided over all Unitywater sewers
located within property boundaries in accordance with the SEQ standards. Easements
shall be centred over the pipe. Easement terms shall be the most current registered
dealing held by the Department of Natural Resources & Mines and shall not be altered
or amended.
24. Water meters must be located on alternative boundaries to electrical pillars.
25. Buildings and other structures must maintain a minimum clearance of 1.5 meters from
Unitywater sewer mains, and 1.0 meter from a sewer manhole chamber or sewer
inspection opening.
26. Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure.
27. The applicant must adjust the level of the existing sewerage inspection opening as
necessary to suit the proposed finished levels. Work must be undertaken by
Unitywater at the owner’s cost. Where the existing sewerage inspection opening point
is located within a sealed or concreted parking area, a brass cap is required to be
fitted.
28. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature, and suitable
approved varieties.
29. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
ENGINEERING
External Works
30. Nannygai Street must be upgraded for the length of its frontage to the subject site.
The works must include in particular:
a. Construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice; and
b. Removal of the existing property accesses, stormwater outlet points and
reinstatement of the kerb, footpath and verge area to match the balance of the
site frontage, including the provision of topsoil and turf where the existing verge
is grassed.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
non-trunk infrastructure.
Page 72 of 145
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.