2014-09-16 Planning & Organisation Committee Agenda

of 141

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


20.   A single Unitywater installed primary water meter must be provided immediately inside
      the property boundary. Meters must be Unitywater approved, installed in accordance
      with Unitywater requirements and remain accessible at all times for reading and
      maintenance purposes.
21.   Sub meters must be provided at the boundary of each title to be administered by a
      body corporate.
22.   The existing 100mm diameter AC watermain within Nannygai Street must be replaced
      for the full frontage of the development site with DICL pipes. The replacement works
      must be completed prior to placing construction materials/site offices over or adjacent
      to the water main alignment.
23.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
      located within property boundaries in accordance with the SEQ standards. Easements
      shall be centred over the pipe. Easement terms shall be the most current registered
      dealing held by the Department of Natural Resources & Mines and shall not be altered
      or amended.
24.   Water meters must be located on alternative boundaries to electrical pillars.
25.   Buildings and other structures must maintain a minimum clearance of 1.5 meters from
      Unitywater sewer mains, and 1.0 meter from a sewer manhole chamber or sewer
      inspection opening.
26.   Storm water retention systems and gross pollutant traps must maintain a minimum
      clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure.
27.   The applicant must adjust the level of the existing sewerage inspection opening as
      necessary to suit the proposed finished levels. Work must be undertaken by
      Unitywater at the owner’s cost. Where the existing sewerage inspection opening point
      is located within a sealed or concreted parking area, a brass cap is required to be
      fitted.
28.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
      Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
      plants within these clearances must be low growing when mature, and suitable
      approved varieties.
29.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs
      associated with repair, replacement or alteration of infrastructure must be met by the
      applicant.
ENGINEERING
      External Works
30.   Nannygai Street must be upgraded for the length of its frontage to the subject site.
      The works must include in particular:
      a.   Construction of a pedestrian footpath in accordance with the conditions of this
           Decision Notice; and
      b.   Removal of the existing property accesses, stormwater outlet points and
           reinstatement of the kerb, footpath and verge area to match the balance of the
           site frontage, including the provision of topsoil and turf where the existing verge
           is grassed.
      This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
      non-trunk infrastructure.




                                                                                      Page 72 of 145
Log in to download the original file

2014-09-16 Planning & Organisation Committee Agenda(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.