PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
Supervision/Certification
22. Upon completion of the work a certificate must be issued by an RPEQ certifying that
the works have been constructed in accordance with the Operational Works permit.
23. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to council:
a. certification that all works have been undertaken and completed in accordance
with the requirements of this Permit
b. As Constructed details in accordance with Council’s Planning Scheme Policy
c. Maintenance and operational manuals for all proprietary devices
As Constructed Plans
24. Prior to acceptance of civil works to become Council assets “On Maintenance”, the
lodgement of satisfactory “As Constructed” records must be submitted to Council. The
“As Constructed” information must include:
a. Drawings and data certified by a qualified experienced Civil Engineer (RPEQ) for
design intent, and certified by a Licensed Surveyor in regard to the cadastre and
the location, level and type of all services and structures.
b. The data must be in accordance with Council’s (Noosa Plan) – Planning Scheme
Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks,
and Planning Scheme Policy 6 Engineering Design Standards – Water and
Sewerage and fully detail levels for all engineering works including but not limited
to drainage structures, finished ground levels and pavement surface levels.
c. The data must be submitted in hardcopy form and digital format (Asset Design
and As Constructed (ADAC)) in GDA94 Zone 56 coordinate values. Guidelines
on the use of ADAC are available at www.adac.com.au
Landscaping
25. The site must be landscaped in accordance with The Noosa Plan’s Planning Scheme
Policy PSP 3 – Landscaping Plants and Guidelines.
During Construction
26. Landscape General - The following requirements apply to all landscape works:
a. All imported topsoil or ameliorated site soil complies with Australian Standard
AS4419 and/or is appropriate for the proposed plant species.
b. All tree stock must conform to NATSPEC criteria as outlined in Specifying Trees:
a guide to assessment of tree quality.
c. Mulch is to be aged, comprised of leaf and limb of varying sizes, free of foreign
matter including, anthropogenic waste, rock, soil / sediment contamination and
applied to ensure 100mm in depth.
d. All necessary measures must be taken to prevent fire ants (or any stages of the
fire ants life cycle) entering the work site. If fire ants are suspected, the applicant
must contact the Department of Primary Industries & Fisheries Call Centre on
132523.
e. Landscaping must not obstruct overland flow paths and must include adequate
drainage to minimise ponding. Mulch or any floatable material must not be
located in swales or overland flow paths.
Page 77 of 145
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.