2014-09-16 Planning & Organisation Committee Agenda

of 141

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  16 September 2014


12.   Pathways must:
      a.    terminate in a manner that ensures smooth transition to existing surfaces for
            public safety
      b.    be designed and constructed to comply with the Disability Discrimination Act
            (DDA), Access to Premises Standard, Austroads and relevant sections of
            AS1428 Design for access and mobility
      Site Access and Driveways
13.   Any existing unnecessary or redundant property accesses must be removed, and the
      kerb, footpath and verge area reinstated to match the existing footpath and/or verge
      treatments. Grassed verge areas to be reinstated must be provided with 100 mm
      topsoil and grass seed or turf, and must be maintained by the developer until
      established.
14.   The driveway must be constructed so as not to concentrate stormwater runoff onto
      neighbouring properties or cause ponding of water within the road reserve
      Earthworks
15.   The finished surface level of the site must be graded and shaped to ensure that all
      surface runoff is directed to Nannygai Street and not directed on to any adjoining
      property.
16.   All earthworks shall be undertaken in accordance with the provisions of AS 3798
      Guidelines on Earthworks for Commercial and Residential Development. Certification
      shall be provided by an RPEQ and submitted to Council the issue of the Certificate of
      Classification for the building.
      Service Conduits under Existing Road Features
17.   Electrical conduits or other services proposed to be installed under existing sealed
      carriageways, concrete pathways or concrete/sealed driveways must be installed by
      boring. Trenching is not permitted, unless specifically approved by Council.
      Erosion and Sediment Control
18.   Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
      must not be released from the site or to waters within the site, or be likely to be
      released should rainfall occur, unless all reasonable and practicable measures are
      taken to prevent or minimise the release and concentration of contamination.
19.   Erosion and sediment control measures must be installed and maintained to minimise
      erosion on the site and to minimise the export of sediment and associated pollutants
      from the site. The erosion and sediment control measures must be designed, installed
      and maintained in accordance with current best practice standards (refer to advisory
      notes).
20.   Prior to the issue of the Certificate of Classification, all site surfaces must be effectively
      stabilised using methods which have achieved effective short-term stabilisation and
      which will continue to achieve effective stabilisation in the medium to long-term (refer
      to advisory notes). For the purpose of this condition, an effectively stabilised surface is
      defined as one that does not, or is not likely to result in visible evidence of soil loss
      caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
      contamination.
21.   Any exposed areas must be effectively stabilised without delay and prior to rainfall
      occurring.




                                                                                       Page 76 of 145
Log in to download the original file

2014-09-16 Planning & Organisation Committee Agenda(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.