PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
12. Pathways must:
a. terminate in a manner that ensures smooth transition to existing surfaces for
public safety
b. be designed and constructed to comply with the Disability Discrimination Act
(DDA), Access to Premises Standard, Austroads and relevant sections of
AS1428 Design for access and mobility
Site Access and Driveways
13. Any existing unnecessary or redundant property accesses must be removed, and the
kerb, footpath and verge area reinstated to match the existing footpath and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100 mm
topsoil and grass seed or turf, and must be maintained by the developer until
established.
14. The driveway must be constructed so as not to concentrate stormwater runoff onto
neighbouring properties or cause ponding of water within the road reserve
Earthworks
15. The finished surface level of the site must be graded and shaped to ensure that all
surface runoff is directed to Nannygai Street and not directed on to any adjoining
property.
16. All earthworks shall be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development. Certification
shall be provided by an RPEQ and submitted to Council the issue of the Certificate of
Classification for the building.
Service Conduits under Existing Road Features
17. Electrical conduits or other services proposed to be installed under existing sealed
carriageways, concrete pathways or concrete/sealed driveways must be installed by
boring. Trenching is not permitted, unless specifically approved by Council.
Erosion and Sediment Control
18. Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
must not be released from the site or to waters within the site, or be likely to be
released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
19. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants
from the site. The erosion and sediment control measures must be designed, installed
and maintained in accordance with current best practice standards (refer to advisory
notes).
20. Prior to the issue of the Certificate of Classification, all site surfaces must be effectively
stabilised using methods which have achieved effective short-term stabilisation and
which will continue to achieve effective stabilisation in the medium to long-term (refer
to advisory notes). For the purpose of this condition, an effectively stabilised surface is
defined as one that does not, or is not likely to result in visible evidence of soil loss
caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
contamination.
21. Any exposed areas must be effectively stabilised without delay and prior to rainfall
occurring.
Page 76 of 145
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.